Letter Sequence Approval |
---|
|
|
MONTHYEARNG-08-0135, Request for NRC Approval of Alternative to Nozzle to Vessel Weld and Inner Radius Examinations2008-02-28028 February 2008 Request for NRC Approval of Alternative to Nozzle to Vessel Weld and Inner Radius Examinations Project stage: Request L-08-111, Inservice Inspection Program Relief Request IR-0542008-03-31031 March 2008 Inservice Inspection Program Relief Request IR-054 Project stage: Request ML0819806282008-07-31031 July 2008 Request for Additional Information, Inservice Inspection Relief Request IR-054 Project stage: RAI ML0820400462008-08-29029 August 2008 Safety Evaluation for Request for Alternative to Reactor Pressure Vessel Nozzle to Vessel Weld and Inner Radius Examinations Tac MD8193) Project stage: Approval L-08-270, Response to Request for Additional Information Regarding Relief Request IR-054, Revision 02008-09-17017 September 2008 Response to Request for Additional Information Regarding Relief Request IR-054, Revision 0 Project stage: Response to RAI ML0831104542008-11-0606 November 2008 E-Mail Acceptance Review for Columbia Relief Request Project stage: Acceptance Review ML0831108332008-11-14014 November 2008 Request for Additional Information Related to Request for Relief 3ISI-09 Project stage: RAI RS-08-156, Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections2008-12-0303 December 2008 Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections Project stage: Request ML0829607292008-12-29029 December 2008 Request for Relief Related to Inservice Inspection Relief Request IR-054 Project stage: Other ML0902700232009-01-27027 January 2009 Acceptance Review of Proposed Alternative 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections Project stage: Acceptance Review RS-09-044, Request for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations2009-03-13013 March 2009 Request for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations Project stage: Request ML0923003942009-08-24024 August 2009 Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections Project stage: Other ML0929404362009-11-0303 November 2009 Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations Project stage: Other ML1003500962010-02-0101 February 2010 Alternative Examination Requirements for Pilgrim Nozzle-to-Vessel Shell and Inner Radii Welds Using ASME Code Case N-702 an BWRVIP-108 Project stage: Other ML1020202572010-07-13013 July 2010 Entergy Response to NRC Request for Additional Information Related to Pilgrim Relief Request (PRR)-20, Alternative Examination Requirements for Pilgrim Nozzle-to-Vessel Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 Project stage: Response to RAI ML1022901632010-08-25025 August 2010 Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power Station Project stage: Other JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP Project stage: Request 2008-09-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) 2024-09-04
[Table view] Category:Safety Evaluation
MONTHYEARML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22089A0492022-05-12012 May 2022 Sfmp Review Letter ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML21067A6422021-05-13013 May 2021 Cyber Security License Amendment Approval ML21098A1662021-04-28028 April 2021 PDEP and EAL License Amendment Approval ML21097A1412021-04-13013 April 2021 EP Exemption Issuance Letter and SE ML20225A0002020-08-27027 August 2020 Approval of Quality Assurance Topical Report (FPL-3), Revision 0 (EPID-L-2020-LLQ-0002) ML20184A0032020-07-30030 July 2020 Issuance of Amendment No. 312 Removal of License Condition 2.C.(3), Fire Protection Program ML20134J1042020-07-10010 July 2020 Issuance of Amendment No. 311 to Revise Operating License and Technical Specifications for Permanently Defueled Conditions ML20083G0082020-04-29029 April 2020 Issuance of Amendment No. 310 Changes to the Post-Shutdown Emergency Plan for Duane Arnold Energy Center ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19310C2042020-01-0202 January 2020 Issuance of Amendment No. 309 to Align Technical Specifications Staffing and Administrative Requirements ML19204A2872019-08-28028 August 2019 Approval of a Certified Fuel Handler Training and Retraining Program ML19198A0102019-07-23023 July 2019 Approval of Change in the BWRVIP Integrated Surveillance Program Capsule Test Schedule to Accommodate Early Closure ML19168A1302019-06-21021 June 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4391; EPID No. L-2014-JLD-0039) ML18292A5662018-11-30030 November 2018 Issuance of Amendment 308 to Upgrade Emergency Action Level Scheme for Duane Arnold Energy Center (DAEC) ML18241A3832018-10-31031 October 2018 Issuance of Amendment 307 to Revise Technical Specifications to Adopt TSTF-551, Revision 3 ML18179A1842018-08-16016 August 2018 Issuance of Amendment 306 to Revise Technical Specification 3.5.1, ECCS-Operating ML18192C1832018-07-24024 July 2018 Fifth 10-Year Inservice Relief Request RR-05 ML18145A1942018-06-15015 June 2018 Relief Request No. NDE R017 Fourth Inservice Inspection Interval Duane Arnold Energycenter (EPID-L-2017-LLR-0135) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18053A2092018-04-16016 April 2018 Request for Relief No. 03 Proposed Use of Alternative Requirements for Nozzle Inner Radius and Nozzle-to-Shell Weld Inspection for Fifth Inservice Inspection Interval (CAC No. MF9374; EPID L-2017-LLR-0110) ML18016A6272018-03-0909 March 2018 Issuance of License Amendment No. 304 Revision to Technical Specification 3.1.2, Reactor Anomalies ML18011A0592018-03-0707 March 2018 Issuance of License Amendment No. 303 Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation ML17353A6822018-01-19019 January 2018 Request for Relief No. RR 01, Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term ML17347A1112018-01-17017 January 2018 Safety Evaluation for Request for Relief from Seal Weld Procedure Qualification, Relief Request No. RR-04 ML17272A0182017-12-19019 December 2017 Relief Request No. RR-02- Proposed Alternative to ASME Code Examination Requirements for Buried Piping Related to Fifth Inservice Inspection Interval Program Plan ML17212A6462017-10-18018 October 2017 Issuance of Amendment to Modify the Plume Exposure Pathway Emergency Planning Zone Boundary ML17220A0262017-09-21021 September 2017 Issuance of Amendment 301 to Revise Emergency Plan ML17129A0372017-05-26026 May 2017 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrument Related to Orders EA-12-049 and EA-12-051 ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17072A2322017-03-30030 March 2017 Issuance of Amendment to Revise Technical Specifications Fuel Storage Requirements ML16313A4752016-11-30030 November 2016 Correction of Errors in Safety Evaluation Associated with License Amendment No. 298 ML16263A2452016-10-17017 October 2016 Issuance of Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program ML16211A5142016-09-12012 September 2016 Issuance of Amendment to Revise Technical Specifications 2.1.1.2, Safety Limit Minimum Critical Power Ratio ML16210A0082016-08-30030 August 2016 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16153A0912016-08-18018 August 2016 Issuance of Amendment to Revise the Value of Reactor Steam Dome Pressure ML16180A0862016-07-25025 July 2016 Issuance of Amendment to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report ML16174A2812016-07-13013 July 2016 Issuance of Amendment (TSCR-154) to Correct Examples in Technical Specifications Section 1.4, Frequency ML16053A4262016-04-29029 April 2016 Correction of Typographical Errors in Safety Evaluation Associated with License Amendment No. 292 ML16008A0862016-01-21021 January 2016 Relief Request No. PR-01, PR-02, VR-01, VR-02, and VR-03 Related to the Inservice Testing Program for the Fifth 10-Year Interval ML15310A0822015-12-22022 December 2015 Issuance of Amendment to Adopt Technical Specifications Task Force (TSTF)-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15169A2612015-08-18018 August 2015 Issuance of Amendment Concerning Extension of Cyber Security Plan Milestone 8 Completion Date ML15014A2002015-02-10010 February 2015 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523 Generic Letter 2008-01, Managing Gas Accumulation (Tac No. MF4358) ML14144A0022014-06-0909 June 2014 Relief Request No. VR-03 Related to the Inservice Testing Program for the Fourth 10-Year Interval ML14099A3352014-04-29029 April 2014 Relief for 2nd Period Limited Weld Examinations ML13301A7052013-11-27027 November 2013 Issuance of Amendment Adopting TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML13323B4432013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation 2024-06-12
[Table view] |
Text
August 29, 2008 Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER - SAFETY EVALUATION FOR REQUEST FOR ALTERNATIVE TO REACTOR PRESSURE VESSEL NOZZLE TO VESSEL WELD AND INNER RADIUS EXAMINATIONS (TAC NO. MD8193)
Dear Mr. Anderson:
In a letter to the Nuclear Regulatory Commission (NRC) dated February 28, 2008, Agencywide Documents Access and Management System Accession No. ML080710428, FPL Energy Duane Arnold, LLC requested relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI inspection requirements regarding examination of certain reactor pressure vessel nozzle to vessel welds and nozzle inner radii at Duane Arnold Energy Center (DAEC). Instead, an alternative in accordance with ASME Code Case N-702, AAlternative Requirements for Boiling-Water Reactor Nozzle Inner Radius and Nozzle-to-Shell Welds,@ was proposed. The relief was requested for the fourth 10-year interval of the Inservice Inspection (ISI) Program for DAEC, which began on November 1, 2006.
Based on the information provided in the relief request, the NRC staff concludes the licensees proposed alternative provides an acceptable level of quality and safety. Therefore, the requested relief is authorized in accordance with 10 CFR 50.55a(a)(3)(i) for the fourth 10-Year interval of the ISI Program interval at DAEC.
If you have any questions regarding this matter, please contact Karl Feintuch at (301) 415-3079.
Sincerely,
/RA by P. Tam/
Lois James, Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
Safety Evaluation cc w/encl: See next page
ML082040046 *SE transmitted by memo of 5/5/2008 OFFICE NRR/LPL3-1 NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/CVIB/BC OGC NRR/LPL3-1/BC NAME DWright KFeintuch BTully MMitchell* RVHolmes PTam for LJames DATE 7/28/08 8/21/08 7/28/08 5/5/08 8/26/08 8/29/08
Duane Arnold Energy Center cc:
Mr. J. A. Stall Executive Vice President, Nuclear and Chief Mr. D. A. Curtland Nuclear Officer Plant Manager Florida Power & Light Company Duane Arnold Energy Center P. O. Box 14000 3277 DAEC Rd.
Juno Beach, FL 33408-0420 Palo, IA 52324-9785 Mr. M. S. Ross Abdy Khanpour Managing Attorney Vice President, Engineering Support Florida Power & Light Company Florida Power & Light Company P. O. Box 14000 P. O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408 Ms. Marjan Mashhadi Daniel K. McGhee Senior Attorney Iowa Department of Public Health Florida Power & Light Company Bureau of Radiological Health 801 Pennsylvania Avenue, NW 321 East 12th Street Suite 220 Lucas State Office Building, 5th Floor Washington, DC 20004 Des Moines, IA 50319-0075 T. O. Jones Chairman, Linn County Vice President, Nuclear Operations Board of Supervisors Mid-West Region 930 1st Street SW Florida Power & Light Company Cedar Rapids, IA 52404 P. O. Box 14000 Juno Beach, FL 33408 Peter Wells, Acting Vice President, Nuclear Steven R. Catron Training and Performance Improvement Manager, Regulatory Affairs Florida Power & Light Company Duane Arnold Energy Center P. O. Box 14000 3277 DAEC Road Juno Beach, FL 33408-0420 Palo, IA 52324 Mark E. Warner U. S. Nuclear Regulatory Commission Vice President, Nuclear Plant Support Resident Inspector=s Office Florida Power & Light Company Rural Route #1 P. O. Box 14000 Palo, IA 52324 Juno Beach, FL 33408-0420 Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Last revised July 2, 2008
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ALTERNATIVE TO REACTOR PRESSURE VESSEL NOZZLE TO VESSEL WELD AND INNER RADIUS EXAMINATIONS DUANE ARNOLD ENERGY CENTER, FPL ENERGY DUANE ARNOLD, LLC DOCKET NO. 50-331
1.0 INTRODUCTION
By letter dated February 28, 2008, Agencywide Documents Access and Management System (ADAMS) Accession No. ML080710428, FPL Energy Duane Arnold, LLC, the licensee for Duane Arnold Energy Center (DAEC), submitted a request for relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, regarding examination of reactor pressure vessel (RPV) nozzle to vessel welds and nozzle inner radii at DAEC. Instead, the licensee proposed to use an alternative in accordance with ASME Code Case N-702, AAlternative Requirements for Boiling-Water Reactor (BWR) Nozzle Inner Radius and Nozzle-to-Shell Welds.@ The technical basis for ASME Code Case N-702 was documented in an Electric Power Research Institute report by Boiling-Water Reactor Vessel and Internals Project (BWRVIP), BWRVIP-108: BWR Vessel and Internals Project, Technical Basis for the Reduction of Inspection Requirements for the Boiling-Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Inner Radii, which was approved by the Nuclear Regulatory Commission (NRC) in a safety evaluation (SE) dated December 19, 2007, (ADAMS Accession No.
ML073600374). This alternative will be discussed in Section 2.0 below.
The December 19, 2007, SE for BWRVIP-108 specified plant-specific requirements which must be met for applicants proposing to use this alternative. The licensee submittal intended to demonstrate that the relevant DAEC RPV nozzle-to-vessel welds and nozzle inner radii meet the plant-specific requirements so that the relief request can be granted.
2.0 REGULATORY EVALUATION
Inservice inspection (ISI) of the ASME Code Class 1, 2, and 3 components is performed in accordance with Section XI of the ASME Code and applicable addenda as required by Title 10 of the Code of Federal Regulations (10 CFR) 10 CFR 50.55a(g), except where specific relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). Section 50.55a(a)(3) of the 10 CFR states that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if: (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Section 50.55a(g)(4) of 10 CFR states further that ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except design and access provisions and preservice examination requirements, set forth in the ASME Code,Section XI, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The applicable ISI Code of Record for the fourth 10-year ISI interval of the DAEC unit is the 2001 Edition of ASME Code,Section XI, 2003 Addenda.
For RPV nozzle-to-vessel shell welds and nozzle inner radii, ASME Code,Section XI requires 100 percent inspection during each 10-year ISI interval. However, ASME Code Case N-702 proposes an alternative which reduces the inspection of RPV nozzle-to-vessel shell welds and nozzle inner radius areas from 100 percent to 25 percent of the nozzles for each nozzle type during each 10-year interval. The NRC has approved BWRVIP-108, the underlying technical basis document for ASME Code Case N-702. The December 19, 2007, SE regarding BWRVIP-108 specified the following plant-specific requirements to be satisfied by applicants using ASME Code Case N-702:
However, each licensee should demonstrate the plant-specific applicability of the BWRVIP-108 report to their units in the relief request by showing that all the following factors are less than 1.15:
(1) the temperature factor defined as (RPV heat up and cooldown rate/100
ºF/hour),
For the recirculation inlet nozzle, (2) the RPV pressure stress factor defined as [(RPV pressure)x(RPV inner radius)/(RPV thickness)]/[1000 psi x 110 inch/5.69 inch],
(3) the nozzle pressure stress factor defined as (pressure/1000 psi)x{[(nozzle outer radius)2 + (nozzle inner radius)2]/ [(nozzle outer radius)2 - (nozzle inner radius)2]}/{[(13.988 inch)2 + (6.875 inch)2]/ [(13.988 inch)2 - (6.875 inch)2]},
For the recirculation outlet nozzle, (4) the RPV pressure stress factor defined as [(RPV pressure)x(RPV inner radius)/(RPV thickness)]/[1000 psi x 113.2 inch/7.0 inch], and (5) the nozzle pressure stress factor defined as (pressure/1000 psi)x{[(nozzle outer radius)2 + (nozzle inner radius)2]/ [(nozzle outer radius)2 - (nozzle inner radius)2]}/{[(22.31 inch)2 + (12.78 inch)2]/ [(22.31 inch)2 - (12.78 inch)2]}.
This plant-specific information was required by the NRC staff to ensure that the probabilistic fracture mechanics (PFM) analysis documented in BWRVIP-108 applies to the RPV of the applicants plant.
3.0 TECHNICAL EVALUATION
3.1 Licensee Evaluation (Selected direct quotes under slightly different subtitles)
ASME Code Requirement for which Relief is Requested
[The licensee requested relief from the following requirements of ASME Code,Section XI, 2001 Edition, 2003 Addenda:]
Table IWB-2500-1 "Examination Category B-D, Full Penetration Welded Nozzle in Vessels - Inspection Program B" Class 1 nozzle-to-vessel weld and nozzle inner radii examination requirements are given in Item Number B3.90 "Nozzle-to-Vessel Welds" and B3.100 "Nozzle Inside Radius Section."
The method of examination is volumetric. All nozzles with full penetration welds to the vessel shell (or head) and integrally cast nozzles are examined each interval. All of the nozzle assemblies identified in Enclosure 2[1] are full penetration welds.
Component(s) for which Relief is Requested Code Class: 1 Component Numbers: N1, N2, N3, N5, N6, N7, N8, N11, N12, and N16 Nozzles (see Enclosure 2[1] for specific nozzle identifications)
Examination Category: B-D Item Number: B3.90 and B3.100 Licensees Proposed Alternative to the ASME Code Pursuant to 10 CFR 50.55a(a)(3)(i), relief is requested from performing the required examinations on 100 percent of the identified nozzle assemblies (see Enclosure 2[1]). As an alternative for all welds and [nozzle] inner radii except for the Recirculation Outlet welds, DAEC proposes to [volumetrically] examine a minimum of 25 percent of the nozzle-to-vessel welds and inner radius sections, including at least one nozzle from each system and nominal pipe size, in accordance with [ASME] Code Case N-702.
Licensees Bases for Alternative Electric Power Research Institute (EPRI) Technical Report 1003557, "BWRVIP-108:
Boiling-Water Reactor Vessel and Internals Project Technical Basis for the Reduction of Inspection Requirements for the Boiling-Water Reactor Nozzle-to-Vessel Shell Welds and
[1] Refers to Enclosure 2 from the licensees February 28, 2008, submittal. Enclosure 2 is not reproduced in this SE.
Nozzle Blend Radii," provides the basis for [ASME] Code Case N-702. The evaluation found that failure probabilities at the nozzle blend radius region and nozzle-to-vessel shell weld due to a Low Temperature Overpressure event are very low (i.e., <1 x 10-6 for 40 years) with or without ISI. The report concludes that inspection of 25 percent of each nozzle type is technically justified.
This EPRI report received an NRC SER dated December 19, 2007. In the SER, Section 5.0 "Plant-Specific Applicability" indicates that each licensee who plans to request relief from the ASME Code,Section XI requirements for RPV nozzle-to-vessel shell welds and nozzle inner radius sections may reference BWRVIP-108 report as the technical basis for the use of ASME Code Case N-702 as an alternative. However, each licensee should demonstrate the plant-specific applicability for the BWRVI P-1 08 report to its units in the relief request by showing that all the general and nozzle-specific criteria addressed below are satisfied (reference Enclosure 3[2]):
(1) [T]he maximum RPV heatup/cooldown rate is limited to less than 115°F per hour.
The DAEC surveillance that monitors reactor vessel heatup/cooldown (Surveillance Test Procedure 3.4.9-01) limits the rate to less than or equal to 100°F/hr for Curve B and less than or equal to 20°F/hr for Curve A.
(2) For the Recirculation Inlet Nozzles the following criteria must be met:
(a) (pr/t)/CRPV <1.15, the calculation for the DAEC N2 Nozzle results in 0.9748 which is less than 1.15/ and (b) [p(ro2 +ri2)/(ro2-ri2)]/C NOZZLE <1.15, the calculation for the DAEC N2 Nozzle results in 1.0923 which is less than 1.15.
(3) For the Recirculation Outlet Nozzles the following criteria must be met:
(a) (pr/t)/CRPV <1.15, the calculation for the DAEC N1 Nozzle results in 1.17 which is higher than 1.15, and (b) [p(ro2 +ri2)/(ro2-ri2)]/CNOZZLE <1.15, the calculation for the DAEC N1 Nozzle results in 0.87 which is less than 1.15.
Based upon the above information, all RPV nozzle-to-vessel shell welds and nozzle inner radii sections, with the exception of the recirculation outlet nozzles, meet the criteria and therefore [ASME] Code Case N-702 is applicable. However, the recirculation outlet nozzles do not meet all of the criteria and [ASME] Code Case N-702 would not be applied. See Enclosure 3[2] for details.
Therefore, use of [ASME] Code Case N-702 provides an acceptable level of quality and safety pursuant to 10 CFR 50.55a(a)(3)(i) for all RPV nozzle-to-vessel shell welds and nozzle inner radii sections, with the exception of the recirculation outlet nozzles.
[ 2 ] Refers to Enclosure 3 from the licensees February 28, 2008, submittal. Enclosure 3 is not reproduced in this SE.
3.2 Staff Evaluation The December 19, 2007, NRC SE on the BWRVIP-108 report specified five plant-specific criteria that licensees shall meet to demonstrate that the BWRVIP-108 report results apply to their plants. The five criteria are related to the driving force of the PFM analyses for the recirculation inlet and outlet nozzles. It was stated in the December 19, 2007, SE, that the nozzle material fracture toughness-related RTNDT values used in the PFM analyses were based on data from the entire fleet of BWR RPVs. Therefore, the BWRVIP-108 PFM analyses are bounding with respect to fracture resistance, and only the driving force of the underlying PFM analyses needs to be evaluated. It was also stated in the December 19, 2007, SE that, except for the RPV heatup/cooldown rate, the plant-specific criteria are for the recirculation inlet and outlet nozzles only because the probabilities of failure, P(FlE)s, for other nozzles are an order of magnitude lower.
The licensee provided in the submittal, DAECs plant-specific data and its evaluation of the five driving force factors, or ratios, against the criteria established in the December 19, 2007, SE.
The licensees evaluation indicated that the fourth criterion (related to recirculation outlet nozzles) was not satisfied. As a result, the reduced inspection requirements in accordance with ASME Code Case N-702 do not apply to DAEC RPV recirculation outlet nozzles. The NRC staff agrees with the licensees decision to exclude the DAEC RPV recirculation outlet nozzles from the scope of this request based upon the licensees evaluation. However, considering that the driving force factor for the recirculation outlet nozzles (1.17) is very close to the plant-specific criterion (1.15) and the P(FlE)s for other RPV nozzles are an order of magnitude lower than the recirculation outlet nozzles, the NRC staff determined that ASME Code Case N-702 applies to all other requested DAEC RPV nozzles. It should be noted that RPV feedwater nozzles and control rod drive return line nozzles are outside the scope of ASME Code Case N-702 and are, accordingly, outside the scope of this application.
It should be noted also that ASME Code Case N-702 permits a VT-1 visual examination of the nozzle inner radius without performing a sensitivity demonstration of detecting a 1-mil width wire or crack. This is not consistent with the NRC position established in Regulatory Guide 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, regarding ASME Code Case N-648-1, Alternative Requirements for Inner Radius Examinations of Class 1 Reactor Vessel Nozzles. However, since the licensee stated in the submittal that DAEC has no plans of using Code Case N-648-1 and volumetric examinations of all nozzle inner radii will be completed, the inconsistency between ASME Code Case N-702 and the NRC position regarding VT-1 is not an issue in this application.
4.0 CONCLUSION
The NRC staff has reviewed the submittal and finds that the DAEC RPV meets four of the five plant-specific criteria specified in the December 19, 2007, SE on the BWRVIP-108 report, which provides technical bases for use of ASME Code Case N-702. The only plant-specific criterion that was not met regarded the evaluation of the DAEC recirculation outlet nozzles, which were excluded from the scope of this request. Consequently, pursuant to 10 CFR 50.55a(a)(3)(i),
relief is granted through the end of the fourth 10-year ISI interval from the requirements of Table IWB-2500-1 (inspection Program B) of ASME Code,Section XI, pertaining to inspection of the RPV nozzle-to-vessel shell welds and inner radii for nozzles specified in the licensees submittal, and an alternative of using ASME Code Case N-702 is authorized because an
acceptable level of quality and safety can be maintained. This determination has considered the licensees intention to perform volumetric examinations for all the affected nozzle inner radii.
This relief from the ASME Code requirements and request for an alternative are authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest. All other requirements of the ASME Code, Sections III and XI, for which relief has not been specifically requested and approved, remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Simon Sheng Date: August 29, 2008