Letter Sequence Supplement |
---|
|
|
MONTHYEARL-PI-08-047, License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+ Fuel2008-06-26026 June 2008 License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+ Fuel Project stage: Request ML0822101322008-07-22022 July 2008 Email - Prairie Island Acceptance Review Questions for LAR to Allow Use of West. 14X14 Vantage+ Fuel (TACs MD9142/MD9143) Project stage: Acceptance Review ML0820605722008-07-28028 July 2008 Request for Supplemental Information, Acceptance Review of License Amendment Request Project stage: Acceptance Review L-PI-08-071, Supplement to License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+ Fuel2008-08-26026 August 2008 Supplement to License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+ Fuel Project stage: Supplement ML0822614492008-08-28028 August 2008 Acceptance of Requested Licensing Action Technical Specification Changes to Allow Use of Westinghouse 0.422-inch OD 14X14 Vantage+ Fuel Project stage: Acceptance Review ML0828106452008-10-17017 October 2008 Request for Additional Information Related to License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14X14 Vantage+Fuel (Tac No. MD9142, MD9143) Project stage: RAI L-PI-08-096, Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse. 0.422- Inch OD 14x14 Vantage + Fuel2008-11-14014 November 2008 Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse. 0.422- Inch OD 14x14 Vantage + Fuel Project stage: Response to RAI ML0833002102008-12-15015 December 2008 Request for Additional Information Related to License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14X14 Vantage + Fuel (TAC Nos. MD9142/9143) Project stage: RAI ML0835200472008-12-30030 December 2008 Request Withholding Information from Public Disclosure for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Tac Nos. MD9142 and MD9143) Project stage: Other ML0835800982009-01-12012 January 2009 Request for Additional Information Related to License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14X14 Vantage + Fuel (TAC Nos. MD9142/9143) Project stage: RAI L-PI-09-011, Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+ Fuel2009-01-30030 January 2009 Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+ Fuel Project stage: Response to RAI L-PI-09-022, Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+ Fuel2009-02-0909 February 2009 Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+ Fuel Project stage: Response to RAI ML0901403342009-02-11011 February 2009 RAI for TS Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+Fuel Project stage: RAI L-PI-09-025, Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch 14x14 Vantage+ Fuel2009-02-20020 February 2009 Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch 14x14 Vantage+ Fuel Project stage: Response to RAI L-PI-09-034, Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch 14x14 Vantage + Fuel2009-03-12012 March 2009 Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch 14x14 Vantage + Fuel Project stage: Response to RAI ML0907210882009-03-12012 March 2009 Enclosure 1, Non-Proprietary Responses to Requests for Additional Information License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 422V+ Fuel Project stage: Response to RAI ML0907102152009-03-25025 March 2009 Request for Withholding Information from Public Disclosure for Prairie Island Nuclear Generating Plant, Units 1 and 2 Project stage: Withholding Request Acceptance L-PI-09-066, 422V+Fuel Transition Project RAI Response-EMCB RAI-1(a)2009-04-27027 April 2009 422V+Fuel Transition Project RAI Response-EMCB RAI-1(a) Project stage: Other L-PI-09-065, Supplemental Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+Fuel2009-05-0404 May 2009 Supplemental Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14x14 Vantage+Fuel Project stage: Supplement ML0913103842009-05-0404 May 2009 Clarification of Response to Request for Additional Information Regarding License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch 14x14 Vantage+ Fuel Project stage: Response to RAI ML0914905612009-06-0808 June 2009 Request for Withholding Information from Public Disclosure for Prairie Island Nuclear Generating Plant, Units 1 and 2 Project stage: Withholding Request Acceptance ML0917402012009-06-25025 June 2009 Public Letter Draft Safety Evaluation for License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 Vantage+ Fuel Project stage: Draft Approval ML0914608092009-07-0101 July 2009 Issuance of Amendments Technical Specifications Changes to Allow Use of Westinghouse 0.422-Inch OD 14X14 Vantage + Fuel Project stage: Approval ML0922403322009-08-31031 August 2009 Correction to Safety Evaluation Supporting Amendment Nos. 192 and 181 Technical Specification Changes to Allow Use of Westinghouse 0.422-Inch OD 14 X 14 Vantage+ Fuel (TAC Nos. MD9142/MD9143) Project stage: Approval ML0925703672009-09-15015 September 2009 Correction to Technical Specifications (TAC Nos. MD9142 and MD9143) Project stage: Other 2009-02-11
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] |
Text
Committed to Nuclear Excellence Prairie Island Nuclear Generatinq Plant Operated by Nuclear Management Company, LLC L-PI-08-071 AUG 8 6 2008 I 0 CFR 50.90 10 CFR 50.46 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Supplement to License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 VANTAGE+ Fuel
{TAC Nos. MD9142 and MD9143)
Reference:
Letter from Nuclear Management Company, L.LC to Document Control Desk, "License Amendment Request for Technical Specifications Changes to Allow Use of Westinghouse 0.422-inch OD 14x14 VANTAGE+ Fuel", dated June 26,2008 (ADAMS Accession ML081820137)
On June 26,2008, Nuclear Management Company, LLC (NMC) requested amendments to the Operating Licenses and associated Technical Specifications (TS) for Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, in support of the transition from 0.400-inch outer diameter (OD) VANTAGE+ fuel to Westinghouse 0.422-inch OD VANTAGE+ (hereafter referred to as 422V+) fuel (Reference). This transition is planned beginning with Cycle 26 (Fall 2009) for Unit 1 and Cycle 26 (Spring 2010) for Unit 2 and will extend over three cycles for each Unit (Cycles 26 through 28).
NMC wishes to clarify the Significant Hazards Consideration Analysis submitted with the reference license amendment request. Specifically, the responses to Question 1, "Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?" and Question 2, "Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?" include the following:
1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1121
Document Control Desk Page 2 "Further, all design basis accidents and transients affected by the fuel upgrade were re-analyzed or evaluated, and the results for the existing fuel remain bounding for the transition to 422V+ fuel." (emphasis added).
The existing 400V+ and proposed 422V+ fuels are compatible for use in transition cores. The intent was not to imply that 400V+ specific limiting parameters would also be applied to 422V+ fuel, only that the results for the existing 400V+ fuel remain bounded by its acceptance criteria during the transition. To clarify, the sentence should be revised to read:
"Further, all design basis accidents and transients affected by the fuel upgrade were re-analyzed or evaluated using representative core designs and the results for each fuel type show all acceptance criteria will continue to be met."
In addition, the response to Question 2 includes the following sentence:
"No equipment additions or modifications are included with the proposed change, and no changes to plant operating procedures are proposed."
To the extent revisions are needed to reflect the changes requested in the referenced license amendment, plant operating procedures will be updated.
However, actual plant operations will not be materially affected as a result of the requested changes. The sentence should be revised to read:
"No equipment additions or modifications are included with the proposed change."
The above changes do not affect the conclusions of the Significant Hazards Consideration Analysis.
The revised Significant Hazards Consideration Analysis reflecting the changes described above is enclosed.
Document Control Desk Page 3 Summarv of Commitments This letter contains no new commitments and no revisions to existing commitments.
NMC continues to request approval of this license amendment request by June 30,2009 with 90 days to implement the associated changes on Unit 1 to support the Unit 1 Cycle 26 refueling outage.
If you have any questions or require additional information regarding this request, please contact Mr. Lenny Sueper at (612) 330-6917, Leonard.Sueper@xenuclear.com.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on AuG .% 6 2008 Michael D. Wadley d
Site Vice President, Prairie lslan Nuclear Generating Plant, Units 1 and 2 Nuclear Management Company, LLC Enclosure cc: NRC Regional Administrator NRC Project Manager NRC Resident Inspector(s)
State of Minnesota
Enclosure Revised Significant Hazards Consideration Analysis 4.3 Significant Hazards Consideration Analysis The proposed amendment would make changes the Technical Specifications that are conforming or related to a change in fuel type from Westinghouse 0.400-inch OD Vantage+ fuel (400+) to Westinghouse 0.422-inch OD Vantage+ (422V+) fuel.
NMC has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The requested amendment is related to a change in the reload fuel design.
The design criteria for the reload fuel are consistent with those for the existing fuel and ensure that the reload fuel is compatible on the basis of coolant flow and neutronic characteristics, as well as DNB and peak cladding temperature requirements. The reload fuel design also ensures mechanical compatibility with the existing fuel, reactor core, control rods, steam supply system, and fuel handling tools and system. The reactor fuel and its analysis are not accident initiators. Therefore, the change in reload fuel design does not affect accident or transient initiation.
The minimum boron accumulator concentration is also not an accident initiator. The proposed change to the minimum accumulator boron concentration Technical Specification limit ensures that the plant will continue to operate in a manner that provides acceptable levels of protection for health and safety of the public. Further, all design basis accidents and transients affected by the fuel upgrade were re-analyzed or evaluated using representative core designs and the results for each fuel type show all acceptance criteria will continue to be met.
Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
Use of the 422V+ fuel is consistent with current plant design bases and does not adversely affect any fission product barrier, nor does it alter the safety function of safety significant systems, structures and components or their roles in accident prevention or mitigation. The operational characteristics of 422V+ fuel are bounded by the safety analyses Page 1 of 2
(Attachment 4). The 422V+ fuel design performs within existing fuel design limits.
The proposed change to the minimum accumulator boron concentration Technical Specification limit ensures that the plant will continue to operate in a manner that provides acceptable levels of protection for health and safety of the public. Further, all design basis accidents and transients affected by the fuel upgrade were re-analyzed or evaluated using representative core designs and the results for each fuel type show all acceptance criteria will continue to be met.
No equipment additions or modifications are included with the proposed change.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The proposed changes do not alter the manner in which applicable design basis limits are determined, nor do they result in exceeding existing design basis limits. Thus, all licensed safety margins are maintained.
Therefore, the proposed changes do not involve a significant reduction in the margin of safety.
Based on the above, NMC concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
Page 2 of 2