L-09-105, Response to Order EA-09-073

From kanterella
Revision as of 07:30, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to Order EA-09-073
ML091210081
Person / Time
Site: Perry, 07200069  FirstEnergy icon.png
Issue date: 04/24/2009
From: Bezilla M
FirstEnergy Nuclear Generation Corp
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
EA-09-073, L-09-105
Download: ML091210081 (2)


Text

FENOC Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear OperatingCompany

  • Perry,Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 SECURITY-RELATED' NFORMATION-: WITHHOLD-UNDER 10 CFR 2.390 April 24, 2009 L-09-105 10 CFR 2.202 10 CFR 72.212 10 CFR 73.55 ATTN: Document Cbhtrol Desk Director, Division of Spent Fuel Storage an d Transportation:

Office of Nuclear-,Material Safety and Safeguards -

Washington, DC 20555-0001

Subject:

Perry Nuclear Power Plant Unit No. 1 Docket No. 50-440, License No. NPF-58 Response to Order EA-09-073 In a letter dated April 7,2009, the Nuclear Regulatory Commission (NRC) issued Order EA-09-073, which Modifies the FirstEnergy Nuclear Operating Company (FENOC) general license forthe proposed Independent Spenit"Fuel Storage Installation (ISFSI) for the Perry Nuclear Power:Plant (PNPP). The modification to the general license requires additional security measures for the physical protection of the proposed PNPP ISFSI.

Attachment 1 provides the required 20-day response to Order EA-09-073, in which FENOC consents to the order but requests a relaxation of the 180-day implementation period: .Since it contains security related information, please withhold Attachment 1 from disclosure, pursuant to 10 CFR 2.390(a)(1)(i).

Regulatory If there are commitments any questions associated with information or if additional this submittal are included in Attachment 2.

is required, please contact,..,

Mr. Thomas. A,.Lentz, Manager. Fleet Licensing, .at (330) 7616071.

Note: Attachment 1 to this letter contains security related information and must be protected accordingly. Upon separation of Attachment 1 this document is decontrolled.

Perry Nuclear Power Plant Unit No.1 L-09-105 Page 2 SECURITY RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 I declare under penalty of perjury that the foregoing is true and correct. Executed on April 24, 2009.

Sincerely, Mark B. Bezilla Attachments:

1. Response to Order EA-09-O73 For The Perry Nuclear Power Plant
2. Regulatory Commitment List cc: NRC Region III Administrator NRC Resident Inspector NRR Project Manager Secretary, Office of Secretary of the Commission Note: Attachment 1 to this letter contains security related information and must be protected accordingly. Upon separation of Attachment 1 this document is decontrolled.