NL-09-1773, Withdrawal of Request to Revise Technical Specification 3.7.8, Service Water System (Sws).

From kanterella
Revision as of 01:44, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Withdrawal of Request to Revise Technical Specification 3.7.8, Service Water System (Sws).
ML093100311
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/05/2009
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-09-1773
Download: ML093100311 (2)


Text

SOllthern Nuel':liF Operatiny Company IIlL:

SOUTHERN A.

COMPANY November 5,2009 Docket No.: 50-348 NL-09-1773 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Unit 1 Withdrawal of Request to Revise Technical Specification 3.7.8, "Service Water System (SWS)"

Ladies and Gentlemen:

In letter (NL-09-1676) dated October 21,2009 Southern Nuclear Operating Company (SNC) submitted a proposed revision to the Technical Specifications (TS), Appendix A to Facility Operating License Number NPF-2 for the Joseph M.

Farley Nuclear Plant Unit 1. The proposed revision was for limited time changes for Unit 1, to prevent an unnecessary Unit shutdown for the repair or replacement of SWS seismic support ring assemblies. Subsequent inspection of the SWS seismic support ring assemblies indicated satisfactory condition and no need for repair or replacement. Therefore, SNC hereby withdraws the subject TS revision package.

U. S. Nuclear Regulatory Commission NL-09-1773 Page 2 Mr. M. J. Ajluni states he is Nuclear Licensing Manager of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.

This letter contains no NRC commitments. If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY

~~Of-:

M. J. Ajluni Nuclear Licensing Manager n to and subscribed before me this .CJ'th day of ~~Ju..i ,2009.

My commission expires: z..~ -dI.o 1;1..

MJAlTDH/lac cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Ms. P. M. Marino, Vice President - Engineering RTYPE: CFA04.054 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R E. Martin, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley Alabama Department of Public Health Dr. D. E. Williamson, State Health Officer