Assignment Report (AR) 00996823 Report
ML101550542
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 11/21/2009
From:
- No Known Affiliation
To:
NRC Region 1
References
AR 00996823, FOIA/PA-2010-0118
Download: ML101550542 (29)


Text

-. " NAR -Assignment Report Page 1 of 29 0 Go back Print INew Search Home AR 00996823 Report Aft Fac: Three Mile AR Type: CR Status: APPROVED Island Aft Unit: 01 Owed To: Ar531CAP Due Date: 03/18/2011 Aft System: 153 Event Date: 11/21/2009 CR 2/A Disc Date: 11/21/2009 Level/Class:

How H01 Orig Date: 11/21/2009 Discovered:

WR/PIMS AR: Component #:

A*.n& Da. ua~ fl~niC

Subject:

TIR18-CP: UNEXPECTED AIRBORNE RAD ACTIVITY IN THE RB

Description:

Originator: BRADLEY C SHUMAKER Supv Contacted: T. Roberts Condition

Description:

An unexpected increase in airborne radioactive activity occurred in the Reactor Building. Local air monitors alarmed alerting Radiation Protection personnel who evacuated personnel from the RB. Many exiting personnel were unable to pass screening through the automated contamination monitors.

Airflow from the RB passed through the Personnel Hatch as well, impacting the RP Control Point personnel in the Auxiliary Building.

Operations secured RB Purge Ventilation supply flow to maximize purge ventilation exhaust and reduce air flow out of the RB hatches and OTSG construction opening.

EP-AA-1009 was reviewed for impact on EALs and no criteria were exceeded.

Assessment of the cause and the recovery plan are being developed.

Immediate actions taken:

Evacuated personnel from the RB.

Recommended Actions:

Prompt investigation of cause.

RB recovery plan to support resumption of work.

Address personnel contamination issues.

What activities, processes, or procedures were involved?

To be developed during the prompt investigation Why did the condition happen?

Uncertain at this time.

What are the consequences?

Critical path and near critical path work has stopped inside the Reactor Building.

Were there any adverse physical conditions?

See detail above.

List of knowledgeable individuals:

T. Roberts, J. Goldman, J. Heishman 6-11q

AR.- Assignment Report Page 2 0"f,29 ,

Operable Basis:

Reportable Basis:

Reviewed by operations for reportability. The Exelon Reportability Reference Manual decision tree was reviewed, and no immediate reportability requirements were identified for the occurrence of the airborne radioactivity. The event is not reportable under SAF 1.1, RAD 1.1, PAD 1.2, RAD 1.3, RAD 1.5, RAD 1.21, or RAD 1.22. The event needs to be evaluated for reportability under RAD 1.8, but there are no immediate reportability requirements under this section (30 day report). While the airborne activity event did not result in any immediate reportability requirements, media interest in the event did result in issuing a press release and an event of potential public interest (EPPI) per LS-MA-1254 TMI-02. As a result, it is reportable under SAF 1.9 (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />). A report the NRC Operations Center via the ENS line was made at 01:13 on 11/22/09 (EN# 455144) after issuing the EPPI at 22:45 on 11/21/09.

SOC Reviewed by: CRYSTAL A WARLOW 11/25/2009 09:56:23 CST SOC Comments:

SL3 as a result of meeting the following criteria contained in LS-AA-120, Att 2: "Contamination, airborne radioactivity, or radiation levels significantly above normal levels resulting from unplanned events.

(HM Langley, TMI RP, 11/21/09)

This event also meets SL3 due to > 1 day outage impact on critical path.

Follow up to Prog Eng to document PINV (Hass 11/23/09)

Per the Corp RP.Sr RP Technical Lead (G. McCarty), the highest dose assigrned to this event does not meet the 24-hour reporting criteria in 10CFR20.2202 (RRM Section RAD 1.2)

Follow-up to RP to document PINV results (HM Langley, TMI RP, 11/23/09) (SOC 11/23/09)

Root cause-related actions initiated 11/23. PINV assignment now in "COMPLT" status with six (6) interim actions to be initiated but no assignment owners or due dates noted. Actions can not be initiated until such time that assignment owners and due dates are determined and the actions accepted. Issue discussed with the PINV owner who accepted the responsibility to determine the assignment owners and due dates.

Follow-up to RP to allow PINV owner to determine assignment owners and due dates.

(HM Langley, TMI RP, 11/24/09) (SOC 11/24/09)

Per Ops SOC rep, PINV interim actions 1 and 2 have been completed by Ops.

Assignments created for PINV interim actions 3, 4, 5, and 6.

(HM Langley, TMI RP, 11/24/09)

SL2 due to potential cost to corporation. Close to comments, actions taken, and actions created.

(HM Langley, TMI RP, 11/25/09) (SOC 11/25/09)

Reviewed by: BRADLEY A PARFITT 11/22/2009 02:42:02 CST Reviewer Comments:

Reviewed by Operations for Operability. This issue has no impact on the ability to safely operate the plant, to achieve or maintain the plant in a safe shutdown condition, or to mitigate the effect of any accident condition. This issue does not identify an equipment deficiency that affects operability of any SSC. There are no Operability concerns. See reportability basis for reportability determination.

Based on bounding calculations performed by Rad Protection, any airborne release from the Reactor Building was a small fraction of the criteria of EAL RU1. Nor did the event meet any of the criteria for entry into EAL RU2. No entry into the Emergency Plan was required. This was reviewed and concurred by corporate and site Emergency Planning.

1~tr*Ino- onhnanrrr,/I- ~ nlaiI n~l A VQ-d,,ot1?)I'flC 1 /1) Q/*1)1

AR_'-Assignment Report Page 3 of 29 A prompt investigation has been initiated as this is a significant radiological event as defined in RP-AA-1004.

All notifications per OP-AA-106-101 have been completed.

Action needs be generated to evaluate reportability under LS-AA-1110 RAD 1.8.

Reviewed by: HARRISON M LANGLEY JR 11/23/2009 16:04:40 CST Reviewer Comments:

Worked with site CAPCO and RCE team member to establish dates for assignments.

IR removed from follow-up (HM Langley, TMI RP, 11/23/09)

Reviewed by: HARRISON M LANGLEY JR 11/25/2009 07:29:20 CST Reviewer Comments:

Actions created for RCA and PINV. IR removed from follow-up (HM Langley, TMI RP, 11/25/09)

CAP QUALTY REJECT: 4 DEPT RESET: 05531 MRC SCREEN DATE: 20091209 STATION RESET: TMI Trendý Codes.~ *' f~I~'.i .

TC1 TC2 TC3 Proc Org Rank ERP102 *

  • RP20 RP ERP103 *
  • RP15 RP F-RP R-REC
  • RP20 RP 3D 4SD 5SN RP20 RP 3H 4WE 5HR RP20 RP 3P 4NU RP20 VNDR 3P 4NU 5UN RP20 RP 3P 4WI 5IS RP20 RP P Assignments IIII'1  ;>

Assign #: 01 Assigned To: Status: COMPLETE Aff Fac: Three Mile Prim Grp: ACAPALL Due Date: 11/26/2009 Island Assign Type: TRKG Sec Grp: Orig Due Date:

Priority:

Schedule Ref:

Unit Condition:

Subject/Description: TIR18-CP: UNEXPECTED AIRBORNE RAD ACTIVITY IN THE RB Assign #: 02 Assigned To: U998RG0 Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5551NESPR Due Date: 11/23/2009 Island I .. ' 11 I I- . - ý I

AR - Assignment Report Page 4 6f Assign Type: PINV Sec Grp: Orig Due Date: 11/23/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Unexpected Airborne Activity in RB Assign #: 03 Assigned To: U999LKW Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5532CHEM Due Date: 12/04/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/04/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Evaluate Reportability under LS-AA-1110, RAD 1.8 Assign #: 04 Assigned To: T941DLO Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5532CHEM Due Date: 12/02/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/02/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Document Independent 3rd Party review of Dose Estimate Assign #: 05 Assigned To: U997J8G Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5501RAPR Due Date: 12/04/2009 Island Assign Type: NNOE Sec Grp: Orig Due Date: 11/25/2009 Priority:

Schedule Ref:

Unit Condition:

Create NNOE for this event IAW LS-AA-115-1004 Prepare and distribute NNOE for Subject/Description: 996823 Assign #: 06 Assigned To: U998RG0 Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5551NESPR Due Date: 11/25/2009 Island Assign Type: RCCH Sec Grp: Orig Due Date 11/25/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Per LS-AA-125: Develop an RCA charter for MRC approval (R . Green) 1 I')Q1')11)1(

-,AR-- Assignment Report Page 5 of 29 Assign #: 07 Assigned To: U998RG0 Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5551NESPR Due Date: 11/25/2009 Island Assign Type: MRC Sec Grp: Orig Due Date: 11/25/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Per LS-AA-125: Present the RCA charter to MRC for approva I (R. Green)

Assign #: 08 Assigned To: UOOOBYO Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5551NESPR Due Date: 11/30/2009 Island Assign Type: MRC Sec Grp: Orig Due Date: 11/30/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Per LS-AA-125: Conduct an RCA status meeting with the MR C (R. Green)

Assign #: 09 Assigned To: U998RGO Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5551NESPR Due Date: 12/07/2009 Island Assign Type: RCR Sec Grp: Orig Due Date: 12/07/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Per LS-AA-125: Complete t e Root Cause Report for this ev ent (R. Green) k ýV Assign #: 10 Assigned To: U998RG0 Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5551NESPR Due Date: 12/14/2009 Island Assign Type: MRC Sec Grp: Orig Due Date: 12/14/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Per LS-AA-125: Present the RCR to MRC (R. Green)

Assign #: 11 Assigned, To: U998AWM Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5501RAPR Due Date: 12/07/2009 Island Assign Type: SDP Sec Grp: Orig Due Date: 12/07/2009 Priority:

Schedule Ref:

I -_ ..... . II 1 ,l'lr* , /=1*"1 '1

  • AR - Assignment Report Page 6 6f,20, Unit Condition:

Subject/Description: Perform an SDP for this event (A. Miller)

Assign #: 12 Assigned To: U999PLF Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5530NESSC Due Date: 12/21/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/21/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Ensure trend codes in PASSPORT match those in the MRC-app roved RCR (P. Fink)

Assign #: 13 Assigned To: MMCGV Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5566PM Due Date: 11/27/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 11/27/2009 Priority:

Schedule Ref:

Unit Condition:

Inventory all vacuums and HEPA equipment used for breac hing orworking on the RCS to Subject/Description: ensure that the correct equipment is being used and is in proper working orde r (D.

Merchant)

Assign #: 14 Assigned To: UOOOCGH Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5566PM Due Date: 12/04/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/04/2009 Priority:

Schedule Ref:

Unit Condition:

Perform a review of all work packages used for breach o f the RCS, ALARA plans, and Subject/Description: RWP's to ensure that the appropriate engineered controls (including HEPA's and vacuum's) are defined. (D. Merchant)

Assign #: 15 Assigned To: UOOOCGH Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5566PM Due Date: 12/04/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/04/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Reinforce the proper use of Rad work practices and Engine ering controls with plant workers for all work that breach the RCS (D. Merchant)

Assign #: 16 Assigned To: U999LKW Status: ACC/ASG I, ttn. 1/-on------. ---- -n,/n/'rr tD,~r A V Q-drn 1 /1)0/,(1"(1 1flI)fl

-AR - Assignment Report Page 7 of 29 Aff Fac: Three Mile Prim Grp: A5532CHEM Due Date: 05/01/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 05/01/2010 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Include ab normal release in ARERR Assign #: 17 Assigned To: U777MGC Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/31/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/31/2009 Priority:

Schedule Ref:

Unit Condition:

Rad Shipping - Process samples for vendor analysis (hard to detect nuclides e.g gross Subject/Description: alpha, Sr 89 / 90). Coordinate with ODCM specialists for which samples need additional analyses.

Assign #: 18 Assigned To: U998RG0 Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5551NESPR Due Date: 01/07/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 01/07/2010 Priority:

Schedule Ref:

Unit Condition:

As current or anticipated operational liabilities allow ( RCS back intact prior to attempting Subject/Description: to replicate, if possible, flow conditions on 11/21), work with Ops to perform air flow surveys in the RB D-rings with and without RB purge operating (R. Green)

Assign #: 19 Assigned To: T941DLO Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5532CHEM Due Date: 01/06/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 01/06/2010 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Document Independent 3rd Party review of Dose Estimate revs.

Assign #: 20 Assigned To: DAVIRL Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/30/2009 Island Assign Type: CAPR Sec Grp: Orig Due Date: 12/30/2009 Priority:

1- - //

AR - Assignment Report Page 8 of.29, Schedule Ref:

Unit Condition:

CAPR: Davis - Document with CAPR closeout. (CAPR) - Change Procedure RP-TM-500-1005 Rev 0 to add the requirement that only vacuums with HEPA filters are allowed in Subject/Description: radiological controlled areas. (Complete) Document the issuance of procedure RP-TM-500-1005 Rev 1 and the changes contained within using a CAPR closeout form.

Assign #: 21 Assigned To: DAVIRL Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/22/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 12/31/2009 Priority:

Schedule Ref:

Unit Condition:

CA - Davis Verify compliance with procedure (CA) - Verify TMI Radiological Controls are in compliance with RP-TM-500-1005 Rev 1 by reviewing the wording in the procedure Subject/Description: against current practices. Brief all RP techs on actions necessary to remain in compliance with this procedure.

Assign #: 22 Assigned To: U997REM Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 03/10/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 02/10/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT - McDonald: Benchmark best practices (ACIT) - Benchmark industry for best Subject/Description: practices regarding control and use of RCA vacuums. Contact INPO for assistance.

Submit results to Corporate Radiological Engineering Manager.

Assign #: 23 Assigned To: U002GPM Status: ACC/PRI Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 02/25/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 02/25/2010 Priority:

Schedule Ref:

Unit Condition:

CA - McCarty: Imlement Fleet Procedure (CA) - RP Fleet Peer Group to implement fleet-Subject/Description: standardized controlled vacuum cleaner procedure that prohibits use of non-HEPA filtration equipped vacuums in an RCA and incorporate industry best practices.

Assign #: 24 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/04/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 12/31/2009 Priority:

Schedule Ref:

I---L-./II- II- 1I I'~OI~fllfl

/110 PI A I rN

"AR - Assignment Report Page 9 of 29 Unit Condition:

CA-Myers: Verify HEPA performance (CA) - Visually inspect all radiologically controlled vacuums under the purview of TMI RP/Rad Waste and verify each vacuum: 1. Is equipped with a HEPA filter. 2. Has a validcertification sticker attached in accordance Subject/Description: with RP-TM-500-1005 and RP-AA-602. 3. Has no physical damage. Any vacuum not meeting above criteria shall be immediately removed from service until procedurally compliant or permanently disabled and disposed.

Assign #: 25 Assigned To: CSCRF Status: COMPLETE Aft Fac: Three Mile Prim Grp: -A5566PM Due Date: 12/31/2009 Island Assign Type: CA Sec Grp: Orig Due Date: 12/31/2009 Priority:

Schedule Ref:

Unit Condition:

CA - Merchant: Verify Performance of HEPA filters (CA) - Visually inspect all radiologically controlled vacuums under the purview of SGRP project RP/Decon and verify each vacuum: 1. Is equipped with a HEPA filter. 2. Has a valid certification sticker attached in Subject/Description: accordance with RP-TM-500-1005 and RP-AA-602. 3. Has no physical damage. Any vacuum not meeting above criteria shall be immediately removed from service until procedurally compliant or permanently disabled and disposed. (Merchant) Action #

996823-25 Assign #: 26 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 03/25/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT - Davis: Review T&RMs (ACIT) Review TMI specific T&RM's that are not TMI component or systems specific for deviation from corporate standards or industry Subject/Description: standards if applicable. Examples of exemptions include TMI-2, TMI-1 System Operation, and processes unique to TMI-1. Document gaps within the'CAP system.

Assign #: 27 Assigned To: U998J8G Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5520MAINT Due Date: 03/25/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT - Heishman: Review T&RMs (ACIT) Review .TMI specific T&RM's that are not TMI component or systems specific for deviation from corporate standards or industry Subject/Description: standards if applicable. Examples of exemptions include TMI-2, TMI-1 System Operation, and processes unique to TMI-1. Document gaps within the CAP system.

Assign #: 28 Assigned To: CARSWB Status: NTFY/PRI Aft Fac: Three Mile Prim Grp: A5550APR Due Date: 03/25/2010 Island

AR - Assignment Report Page 10 of 29.

Assign Type: ACIT Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT - Carsky: Review T&RMs (ACIT) Review TMI specific T&RM's that are not TMI component or systems specific for deviation from corporate standards or industry Subject/Description: standards if applicable. Examples of exemptions include -tMI-2, TMI-1 System Operation, and processes unique to TMI-1. Document gaps within the CAP system.

Assign #: 29 Assigned To: U999E8H Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A5510APR Due Date: 03/25/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT - Sallade: Review T&RMs (ACIT) Review TMI specific T&RM's that are not TMI component or systems specific for deviation from corporate standards or industry Subject/Description: standards if applicable. Examples of exemptions include TMI-2, TMI-1 System Operation, and processes unique to TMI-1. Document gaps within the CAP system.

Assign #: 30 Assigned To: U999RSC Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A5540APR Due Date: 03/25/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT- Campbell: Review T&RMs (ACIT) Review TMI specific T&RM's that are not TMI component or systems specific for deviation from corporate standards or industry Subject/Description: standards if applicable. Examples of exemptions include TMI-2, TMI-1 System Operation, and processes unique to TMI-1. Document gaps within the CAP system.

Assign #: 31 Assigned To: U999MSR Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5561APR Due Date: 03/25/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Richards: Review T&RMs (ACIT) Review TMI specific T&RM's that are not TMI component or systems specific for deviation from corporate standards or industry Subject/Description: standards if applicable. Examples of exemptions include TMI-2, TMI-1 System Operation, and processes unique to TMI-1. Document gaps within the CAP system.

Assign #: 32 Assigned To: U997REM Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 02/26/2010 Island I-- - . I I I- -. ý - -- - - A" ý

,.AR - Assignment Report Page 11 of 29 Assign Type: AC-IT Sec Grp: Orig Due Date: 01/15/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-McDonald: complete needs analysis form (ACIT) - RP CRC perform needs analysis Subject/Description: of new corporate procedure (996823-23) on the control of RCA vacuums. Ensure impact on Initial Training, Continuing Training and supplemental RPTs is addressed.

Assign #: 33 Assigned To: T902HML Status: COMPLETE Aff Fac: Three Mile Prim Grp: A5531APR Due Date: 01/15/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 01/15/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Davis: reinforce fundamentals (ACIT) - Reinforce the RP fundamentals on the need Subject/Description: to communicate changes in actions or requests regarding the communications breakdown surrounding the purchase of SGRP project wet vacs.

Assign #: 34 Assigned To: U998DWR Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5510APR Due Date: 03/26/2010 Island Assign Type: CA Sec Grp: A5510PROC Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

CA-Sallade: change ventilation ops procedure/s (CA) - Revise RCA related ventilation Subject/Description: operating procedures to require a review of RCS work in progress and notify RP prior to operating or manipulating ventilation equipment.

Assign #: 35 Assigned To: U002GPM Status: ACC/PRI Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 03/25/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

CA-McCarty: Revise RP-AA-401 (CA) - Revise the corporate ALARA Review procedure RP-AA -401, "Operational ALARA Planning and Controls" to require a review of ventilation Subject/Description: induced air flows and impact when a task has the potential for generating high contamination that may become airborne.

Assign #: 36 Assigned To: DAVIRL Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/22/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 12/31/2009

AR - Assignment Report Page 12 of Priority:

Schedule Ref:

Unit Condition:

CA-Davis: Review procedure importance (CA) - Review the importance of following Subject/Description: procedures with RP Techs. Discuss how this event could have been avoided if the procedure had been followed.

Assign #: 37 Assigned To: DAVIRL Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/22/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 12/30/2009 Priority:

Schedule Ref:

Unit Condition:

CA-Davis: review PJB expectations (CA) - Reinforce expectations with RP supervision to Subject/Description: perform Pre-Job Briefs with RP techs per HU-AA-1211.

Assign #: 38 Assigned To: DAVIRL Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/30/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/30/2009 Priority:

Schedule Ref:

Unit Condition:

ACIT-Davis: Reinforce worker briefings (ACIT) Worker briefings are required for all Subject/Description: T1R18 ALARA plan activities within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of task per RP-AA-401, "Operational ALARA Planning and Controls". Reinforce this requirement with all RP personnel.

Assign #: 39 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/30/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/30/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: ACIT-Davis: RPT vendor FMS (ACIT) Document the performance of the RP technician in vendor FMS.

Assign #: 40 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/30/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/30/2009 Priority:

Schedule Ref:

Unit Condition:

ý -

'AR - Assignment Report Page 13 of 29 Subject/Description: ACIT-Davis: RP supervision vendor FMS (ACIT) Document the performance of the RP supervision in vendor FMS. I Assign #: 41 Assigned To: DAVIRL Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/22/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 12/30/2009 Priority:

Schedule Ref:

Unit Condition:

CA-Davis: Communicate expectations on vacs with RPT (CA) - Communicate Subject/Description: expectations for the requirements for RP technicians to inspect vacuum cleaners prior to use at RCA job site.

Assign #: 42 Assigned To: U997DFM Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5561APR Due Date: 01/27/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 01/27/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Moyer: Update guide for NGET (ACIT) - Add this event as OPEX (IR# 996823) to Subject/Description: the revision list for the Exelon Common Site-Specific Study Guide for incorporation into the next revision of NGET.

Assign #: 43 Assigned To: UOOOCEK Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5461TR Due Date: 03/25/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 03/25/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Knox: Revise Rad Worker Training (ACIT) Attain Approval and Incorporate the following topical issue to the corporately owned radiation worker training modules: 1.)

Stress the procedural requirement for all vacuum cleaners in an RCA to be equipped with Subject/Description: HEPA filtration.2.) Stress the requirement that no vacuum cleaner or vacuuming device can be substituted for an RP approved HEPA filtration equipped' vacuum.3.) Stress the importance of NOT altering or repairing vacuum cleaners used in an RCA without RP concurrence and oversight.

Assign #: 44 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 02/10/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 02/10/2010 Priority:

Schedule Ref:

Unit Condition:

I -l' I .. I I

AR - Assignment Report Page 14 d 129', -

ACIT-Davis: review OE10640 (ACIT) - Formerly review the 1999 Farley event described Subject/Description: in OE 10640 for significance to TMI. If additional actions are necessary, create an IR to document the actions taken.

Assign #: 45 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 02/10/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 02/10/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Davis: review OE18825 (ACIT) - Formerly review the 2004 Browns Ferry event Subject/Description: described in OE 18825 for significance to TMI. If additional actions are necessary, create an IR to document the actions taken.

Assign #: 46 Assigned To: - DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 02/10/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 02/10/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Davis: review OE 27851 (ACIT) - Formerly review the 2008 Vermont Yankee event Subject/Description: described in OE 27851 for significance to TMI. If additional actions are necessary, create an IR to document the actions taken.

Assign #: 47 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 02/10/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 02/10/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Davis: review OE 14512 (ACIT) - Formerly review the 2002 Vermont Yankee event Subject/Description: described in OE 14512 for significance to TMI. If additional actions are necessary, create an IR to document the actions taken.

Assign #: 48 Assigned To: MMCGV Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5566PM Due Date: 01/08/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/31/2009 Priority:

Schedule Ref:

Unit Condition:

ACIT-Davis: Formally review OE 23581 (ACIT) - Formerly review the 2006 Seabrook event described in OE 23581 for significance to TMI. This event is relevant to the TMI Subject/Description:

RCS refill with dry internal RCS. If additional actions are necessary, create an IR to AD Q---1-+ 1 I'/O1 1[t1 l (

AR - Assignment Report Page 15 of 29 document the actions taken.

Assign #: 49 Assigned To: DAVIRL Status: ACC/ASG Aff Fac: Three Mile Prim Grp: A5531APR Due Date: 03/19/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 03/19/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Davis: review root cause with RPTs (ACIT) - Review Root Cause Evaluation Subject/Description: (996823-09) with RP Techs to stress the value of questioning attitudes, independent thinking, and RP fundamentals.

Assign #: 50 Assigned To: UOOOWOH Status: CANCELED Aft Fac: Three Mile Prim Grp: ACCAPRP Due Date: 12/30/2009 Island Assign Type: ACIT Sec Grp: Orig Due Date: 12/30/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: ACIT-Harris: Review root cause for NER application (ACIT) - Review Root Cause (996823-09) and evaluate for NER distribution on the TMI RB Contamination Event.

Assign #: 51 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 02/12/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 02/12/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps during outage (EFRS) - Measure of Effectiveness includes the following (outage): 1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the remainder of T1R18. 2) Perform one targeted Subject/Description: observation of 100% of TMI RCAs per week for the remainder of the TIR18 outage beginning the week of 12/14/2009 and completing one week following breaker closure.

Document occurrences of RP-TM-500-1005 violations via the CAP system.

Assign/Sub #: 51/01 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/21/2009 Island Assign Type: EFRS Sec Grp: Orig Due Date: 12/21/2009 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps during outage (Wk 12/14/09) (EFRS) - Measure of Effectiveness includes the following (outage): 1) Zero occurrences of non-HEPA filtered vacuum cleaners Used in radiological controlled areas during the remainder of T1R18. 2) 11 .- II I . .... 1 _. - ... . . .. I_ .,

AR - Assignment Report Page 16 o -f 2q, - - - ',

Perform one targeted observation sweep per week for the remainder of the TiR18 Subject/Description: outage beginning the week of 12/14/2009 and completing one week following breaker closure. Document occurrences of RP-TM-500-1005 violations via the CAP system.

Assign/Sub #: 51/02 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/27/2009 Island Assign Type: EFRS Sec Grp: Orig Due Date: 12/27/2009 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps during outage (Wk 12/21/09) (EFRS) - Measure of Effectiveness includes the following (outage): 1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the remainder of T1R18. 2)

Subject/Description: Perform one targeted observation sweep per week for the remainder of the TIR18 outage beginning the week of 12/14/2009 and completing one week following breaker closure. Document occurrences of RP-TM-500-1005 violations via the CAP system.

Assign/Sub #: 51/03 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/08/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 01/04/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps during outage (Wk 12/28/09) (EFRS) - Measure of Effectiveness includes the following (outage):1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the remainder of TIR18. 2)

Subject/Description: Perform one targeted observation sweep per week for the remainder of the T1R18 outage beginning the week of 12/14/2009 and completing one week following breaker closure. Document occurrences of RP-TM-500-1005 violations via the CAP system.

Assign/Sub #: 51/04 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/11/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 01/11/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps during outage (Wk 01/04/10) (EFRS) - Measure of Effectiveness includes the following (outage): 1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the remainder of T1R18. 2)

Subject/Description: Perform one targeted observation sweep per week for the remainder of the TIR18 outage beginning the week of 12/14/2009 and completing one week following breaker closure. Document occurrences of RP-TM-500-1005 violations via the CAP system.

Assign/Sub #: 51/05 Assigned To: T902HML Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/19/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 01/19/2010 1-~1-tn. IInnrnnnnnr~ ronn mn, Ic.nnIoor~,lotIl? or.nrt A P (~crxlot 11 /")

I1QflA1C~

Qr/1)l()

, AR Assignment Report Page 17 of 29 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps during outage (Wk 01/11/10) (EFRS) - Measure of Effectiveness includes the following (outage):1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the remainder of T1R18. 2)

Subject/Description: Perform one targeted observation sweep per week for the remainder of the TIR18 outage beginning the week of 12/14/2009 and completing one week following breaker closure. Document occurrences of RP-TM-500-1005 violations via the CAP system.

Assign/Sub #: 51/06 Assigned To: DAVIRL Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 01/25/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 01/25/2010 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: EFRS-Davis: Targeted sweeps during outage (Wk 01/18/10)

Assign/Sub #: 51/07 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 02/01/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 02/01/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps during outage (Wk 01/25/10) (EFRS) - Measure of Effectiveness includes the following (outage):1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the remainder of T1R18. 2)

Subject/Description: Perform.one targeted observation sweep per week for the remainder of the T1R18 outage beginning the week of 12/14/2009 and completing one week following breaker closure. Document occurrences of RP-TM-500-1005 violations via the CAP system.

Assign #: 52 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/03/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 12/02/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps at power (EFRS) - Measure of Effectiveness includes the following (power operations): 1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the time frame of January 1, 2010 to Subject/Description: November 12, 2010. 2) Perform one targeted observation of 100% of TMI RCAs every three months for the monitoring period after the completion of T1R18 beginning in February. Document occurrences of RP-TM-500-1005 violations via the CAP system.

Status: ACC/ASG Assigned To: DAVIRL Assign/Sub #:

  1. 52/01 52/01 Assigned To: DAVIRL Status: ACC/ASG I- - - 1 11

AR - Assignment Report Page 18 of 29'.

Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 04/30/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 04/30/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps at power (2/10 to 4/10) (EFRS) - Measure of Effectiveness includes the following (power operations): 1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the time frame of January Subject/Description: 1, 2010 to November 12, 2010. 2) Perform one targeted observation sweep every three months for the monitoring period after the completion of T1R18 beginning in February.

Document occurrences of RP-TM-500 -1005 violations via the CAP system.

Assign/Sub #: 52/02 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 07/30/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 07/30/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps at power (4/10 to 7/10) (EFRS) - Measure of Effectiveness includes the following (power operations):1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the time frame of January Subject/Description: 1, 2010 to November 12, 2010. 2) Perform one targeted observation sweep every three months for the monitoring period after the completion of T1R18 beginning in February.

Document occurrences of RP-TM-500 -1005 violations via the CAP system.

Assign/Sub #: 52/03 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 10/29/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 10/29/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps at power (7/10 to 10/10) (EFRS) - Measure of Effectiveness includes the following (power operations): 1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the time frame of Subject/Description: January 1, 2010 to November 12, 2010. 2) Perform one targeted observation sweep every three months for the monitoring period after the completion of T1R18 beginning in February. Document occurrences of RP-TM-500 -1005 violations via the CAP system Assign/Sub #: 52/04 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 12/03/2010 Island Assign Type: EFRS Sec Grp: Orig Due Date: 12/03/2010 Priority:

Schedule Ref:

Unit Condition:

EFRS-Davis: Targeted sweeps at power (10/10 to 12/10) (EFRS) - Measure of 1 /10in ir

AR f Assignment Repo)rt Page 19 of 29 Effectiveness includes the following (power operations):1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological controlled areas during the time frame of Subject/Description: January 1, 2010 to November 12, 2010. 2) Perform one targeted observation sweep every three months for the monitoring period after the completion of TIR18 beginning in February. Document occurrences of RP-TM-500 -1005 violations via the CAP system Assign #: 53 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 12/13/2010 Island Assign Type: MRC Sec Grp: Orig Due Date: 12/13/2010 Priority:

Schedule Ref:

Unit Condition:

EFR-Davis: Collective EFR of CAPR/CA/EFR (EFR) Perform a collective effectiveness Subject/Description: review of the root cause CAPR 996823-20, 996823-21, CA 996823-23, CA 996823-24, CA 996823-25, EFRS 996823-51, EFRS 996823-52 Assign #: 54 Assigned To: DAVIRL Status: CANCELED Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 02/26/2010 Island Assign Type: EFR Sec Grp: Orig Due Date: 02/26/2010 Priority:

Schedule Ref:

Unit Condition:

EFR-Davis: Interim EFR on outage sweeps checkin with MRC (EFR) Interim EFRS MRC Action:Present results of assignment 996823-51 to MRC (interim check-in on effectiveness review):(EFRS) - Measure of Effectiveness includes the following (outage):1) Zero occurrences of non-HEPA filtered vacuum cleaners used in radiological Subject/Description: controlled areas during the remainder of T1R18. 2) Perform one targeted observation sweep per week for the remainder of the T1R18 outage beginning the week of 12/14/2009 and completing one week following breaker closure. Document weekly results on outage scorecards or in the FMS.

Assign #: 55 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 12/27/2010 Island Assign Type: MRC Sec Grp: Orig Due Date: 12/27/2010 Priority:

Schedule Ref:

Unit Condition:

MRC-Davis: Final EFR Final EFR MRC Action:Present results of EFR assignment 996823-Subject/Description: 53 to MRC.(MRC) 996823-55 Assign #: 56 Assigned To: UOOOWOH Status: COMPLETE Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 12/16/2009 Island Assign Type: NER Sec Grp: Orig Due Date: 12/16/2009 Priority:

I- - - - I I. I . -

AR - Assignment Report Page 20 of 29 Schedule Ref:

Unit Condition:

Review Completed RCR to Evaluate Need for Fleet-Wide Actions Document the screening of the completed Root Cause Report (RCR) and determine if any fleet-wide corrective Subject/Description: actions are required based on the RCR findings. Consult the SFAMs and SME, as necessary. If additional actions are required, issue a Red or Yellow NER, as appropriate, in accordance with LS-AA-115-1004, "Processing of NERs and NNOEs."

Assign #: 57 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 02/01/2010 Island Assign Type: NNOE Sec Grp: Orig Due Date: 02/01/2010 Priority:

Schedule Ref:

Unit Condition:

Subjruect/Descripion: ACIT - Davis: Final NNOE Create and Distribute a final NNOE on the TMI RB Contamination Event.

Assign #: 58 Assigned To: MMCGV Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5566PM Due Date: 01/29/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 01/29/2010 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: ACIT - Merchant: Document Immediate Actions (ACIT) - Document, in detail, actions completed under the immediate actions table as described in in-progress notes.

Assign #: 59 Assigned To: MMCGV Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5566PM Due Date: 02/12/2010 Island Assign Type: MRC Sec Grp: Orig Due Date: 02/12/2010 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: MRC-Merchant: Present #58 to MRC (MRC) - Present the results of Action # 996823-58 to the MRC.

Assign #: 60 Assigned To: U998R3H Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5510APR Due Date: 01/29/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 01/29/2010 Priority:

Schedule Ref:

Unit Condition:

ACIT-Deboer: Document immediate actions taken (ACIT) - Document, in detail, actions L++-. ____ A D Q-,1-+ 1 /I)OlQ 1('tI(

AR - Assignment Report Page 21 of 29 Subject/Description: completed under the immediate actions table as described in In-progress notes.

Assign #: 61 Assigned To: U000DD4 Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A5510APR Due Date: 02/12/2010 Island Assign Type: MRC Sec Grp: Orig Due Date: 02/12/2010 Priority:

Schedule Ref:

Unit Condition:

MRC-Deboer: Present action 60 to MRC (MRC) - Present the results of Action # 996823-Subject/Description: 60 to the MRC Assign #: 62 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 01/29/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 01/29/2010 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: ACIT-Davis: document immediate actions taken (ACIT) - Document, in detail, actions completed under the immediate actions table as described in the in-progress notes.

Assign #: 63 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531APR Due Date: 02/12/2010 Island Assign Type: MRC Sec Grp: Orig Due Date: 02/12/2010 Priority:

Schedule Ref:

Unit Condition:

MRC-Davis: Present action 62 to MRC (MRC) - Present the results of Action # 996823-62 Subject/Description: to the MRC.

Assign #: 64 Assigned To: U002GPM Status: ACC/PRI Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 02/25/2010 Island Assign Type: ACIT Sec Grp: Orig Due Date: 02/25/2010 Priority:

Schedule Ret:

Unit Condition:

ACIT-McCarty: Review fleet posting procedure (ACIT) - Review fleet posting procedure to ensure non-HEPA vacs are removed from an RCA when posted. (MRC was concerned Subject/Description: that a non-HEPA equipped vacuum could end up in an RCA when a new RCA was created while the vacuum was stored in that area. The fleet review is to ensure there is a warning or instruction to be aware of this potential.)

Status: ACC/ASG Assigned To: UOO2GPM Assign #:

Assign #: 65 65 Assigned To: U002GPM Status: ACC/ASG I .. 11

AR - Assignment Report Page 22 of ý,9 Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 04/15/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 04/15/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP - McCarty: Talking Points in RP-AA-350 (LLIP) - Incorporate talking points (Q&A)

Subject/Description: into the Personnel Contamination Event procedure (RP-AA-350) to pass out to workers following a WBC (Whole Body Count) or internal contamination event.

Assign #: 66 Assigned To: U999DWE Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date- 02/26/2010 Island Assign Type: LLI P Sec Grp: Orig Due Date: 02/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP - Ethridge: WBC Wait Improvement (LLIP) - Develop a backup method to determine if workers are externally contaminated or have internal contamination. This Subject/Description: determination will enable workers to leave the site and come back .in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for a WBC instead of waiting for multiple hours for a WBC when dealing with large groups.

Assign #: 67 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP - Davis: More Techs for WBC to CRC (LLIP) - Review a management proposal within the RP CRC (Curriculum Review Committee) to qualify more RP Technicians on WBC Subject/Description: equipment. This is to enable the use of the backup WBC equipment when multiple workers require a WBC to minimize wait time.

Assign #: 68 Assigned To: UOO2GPM Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 04/15/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 04/15/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP - McCarty: Release from RCA in RP-AA-350 (LLIP) - Develop criteria in the Personnel Contamination Event procedure (RP-AA-350) to allow workers to be released Subject/Description: from the RCA without passing a Personnel Contamination Monitor (PCM) or PM-7 (Personnel Monitor Model 7) to use the restroom with an RP escort.

Status: ACC/ASG 69 Assigned To: UOO2GPM Assign Assign-#: #: 69 Assigned To: U002GPM Status: ACC/ASG 1-- . //--- ___ __ ____ ___ /___ /__-1 -M ___- An 0- I /n 0 11) t1%I fA

AR Assignment Report Page 23 of 29 Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 06/01/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 06/01/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP - McCarty: Develop Triage Procedure (LLIP) - Develop a corporate RP triage procedure. This procedure will provide actions when dealing with a large number of personnel contamination events or workers with internal contamination. Considerations within the procedure should include: creature comforts, alternate screening methods to release workers from the RCA without a WBC, corporate and site notifications, and the establishment of a log to track workers. This procedure should also include an evaluation Subject/Description: for bringing in additional RPM's and RP Technical Support Managers to explain WBC printout sheets to workers prior to release from site while alarming a PM-7. Examples include: Ingestion versus inhalation potential, best estimate for elimination based on ingestion and inhalation flowpaths, biological and effective half-life. The procedure should also contain an evaluation for additional RPM support following large scale refueling outage contamination events to support the site RPMs continued direct oversight and focus on refueling outage activities.

Assign #: 70 Assigned To: TSNJK Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Harris: Cost Benefit for NaI to HPGe (LLIP) - Perform a cost benefit analysis for Subject/Description: changing NaI WBC's at Exelon plants to HPGe in order to provide more accurate and timely assessments of worker internal dose.

Assign #: 71 Assigned To: DRE01 Status: NTFY/PRI Aff Fac: Three Mile Prim Grp: A8931RP Due Date: 03/26/2010 Island Assign Type: LLI P Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Moser: Validate WBC Libraries (LLIP) - Validate that WBC libraries are appropriately Subject/Description: established based on both on-line and shutdown isotopes.

Assign #: 72 Assigned To: ZONF1 Status: ACC/ASG Aff Fac: Three Mile Prim Grp: A8831RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Thompson: Validate WBC Libraries (LLIP) - Validate that WBC libraries are

AR - Assignment Report Page 24 of 29 Subject/Description: appropriately established based on both on-line and shutdown isotopes.

Assign #: 73 Assigned To: QDCMZ Status: COMPLETE Aff Fac: Three Mile Prim Grp: A8431RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Collins: Verify WBC Libraries (LLIP) - Validate that WBC libraries are appropriately Subject/Description: established based on both on-line and shutdown isotopes.

Assign #: 74 Assigned To: BRZGV Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A8631RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Leasure: Validate WBC Libraries (LLIP) - Validate that WBC libraries are Subject/Description: appropriately established based on both on-line and shutdown isotopes.

Assign #: 75 Assigned To: U001NJH Status: COMPLETE Aft Fac: Three Mile Prim Grp: A5231RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Lyate: Validate WBC Libraries (LLIP) - Validate that WBC libraries are appropriately Subject/Description: established based on both on-line and shutdown isotopes.

Assign #: 76 Assigned To: U777KGW Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A5331RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Renda: Validate WBC Libraries (LLIP) - Validate that WBC libraries are appropriately Subject/Description: established based on both on-line and shutdown isotopes.

Assign #: 77 Assigned To: UOOORH2 Status: NTFY/PRI Aft Fac: Three Mile Prim Grp: A5431RP Due Date: 03/26/2010 Island 1_-__ _- -- __ __ I_ /__1 -M __ _- A TIC' ---- I - 1 11%0 11- fl '

AR -' Assignment Report Page 25 of 29 Assign Type: LL.IP Sec Grp: Orig Due Date: 03/26/2010 1 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: LL

. .IP-Holmes: Validate WBC Libraries (LLIP) - Validate that WBC libraries are

'-1-ppropriately established based on both on-line and shutdown isotopes.

Assign #: 78 Assigned To: STOVJM Status: ACC/PRI Aft Fac: Three Mile Prim Grp: AS131RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Stovall: Validate WBC Libraries (LLIP) - Validate that WBC libraries are Subject/Description: appropriately established based on both on-line and shutdown isotopes.

Assign #: 79 Assigned To: GLICDA Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A8331RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Bush: Validate WBC Libraries (LLIP) - Validate that WBC libraries are appropriately Subject/Description: established based on both on-line and shutdown isotopes.

Assign #: 80 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Davis: Validate WBC Libraries (LLIP) - Validate that WBC libraries are appropriately Subject/Description: established based on both on-line and shutdown isotopes.

Assign #: 81 Assigned To: TSNJK Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

I- - _ 1 - , /1 - . . .. , A rý T I 1

Ug f.

AR - Assignment Report Page 26 ot"29.:-

LLIP-McCarty: Delete MDA from WBC Prints (LLIP) - Review in the RP RTE peer group the Subject/Description: lesson learned for deleting Minimal Detectable Activity (MDA) values on WBC printouts in order to not confuse workers who read their own WBC printouts.

Assign #: 82 Assigned To: DRE01 Status: NTFY/PRI Aft Fac: Three Mile Prim Grp: A8931RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Moser: RPM review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 83 Assigned To: ZONF1 Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A8831RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Thompson: RPM review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological Subject/Description: events to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 84 Assigned To: ZONUC Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A8431RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Collins: RPM review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 85 Assigned To: BRWQU Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A8631RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

1 /1" 0 "IA 1A

AR - Assignment Report Page 27 of 29 LLIP-Leasure: RPM review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 86 Assigned To: U002MAL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5231RP Due Date: 03/26/2010 Island Assign Type: LLI P Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Lyate: RPM Review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 87 Assigned To: U998J3R Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5331RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Renda: RPM Review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 88 Assigned To: UOOORH2 Status: NTFY/PRI Aft Fac: Three Mile Prim Grp: A5431RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Holmes: RPM Review of RP Communications (LLIP) - Take'action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 89 Assigned To: STOVJM Status: ACC/PRI Aft Fac: Three Mile Prim Grp: A5131RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

AR - Assignment Report Page 28 Of 29.

LLIP-Stovall: RPM Review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 90 Assigned To: DRDI3 Status: NTFY/PRI Aft Fac: Three Mile Prim Grp: A8331RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Bush: RPM Review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 91 Assigned To: DAVIRL Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 03/26/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 03/26/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Davis: RPM Review of RP Communications (LLIP) - Take action to ensure that the site RP Manager reviews all external Exelon communications involving radiological events Subject/Description: to validate accuracy of the information that is being released external to Exelon.

Document actions taken / create actions as necessary.

Assign #: 92 Assigned To: TSNJK Status: NTFY/ASG Aft Fac: Three Mile Prim Grp: A8077RP Due Date: 04/15/2010 Island Assign Type: LLIP Sec Grp: Orig Due Date: 04/15/2010 Priority:

Schedule Ref:

Unit Condition:

LLIP-Kucznski: RP-AA-220 review for WBC printout release (LLIP) - Review the addition of procedural guidance in the Bioassay Procedure (RP-AA-220) for release of WBC Subject/Description: printout sheets to workers following an intake with the RP RTE peer group. This will improve worker trust in the RP organization.

Assign #: 93 Assigned To: T902HML Status: ACC/ASG Aft Fac: Three Mile Prim Grp: A5531RP Due Date: 04/22/2010 Island Assign Type: CA Sec Grp: Orig Due Date: 04/22/2010 Priority:

Schedule Ref:

Unit Condition:

1 /no( I'/n , 1/

.'AR Assignment Report Page 29 of 29 Subject/Description: Ensure RPT BLC Compl Read & Sign, IR 996823, CAs 21,36,41 I- - .- . I I I . - . I - - . 1. .