Notification of Turkey Point Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 05000250-11-08 & 05000251-11-008
ML111240445
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/03/2011
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Nazar M
Florida Power & Light Co
References
IR-11-008
Download: ML111240445 (6)


See also: IR 05000250/2011008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 3, 2011

Mr. Mano Nazar

Executive Vice President

and Chief Nuclear Officer

Florida Power and Light Company

P.O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT: NOTIFICATION OF TURKEY POINT NUCLEAR PLANT - COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000250 &

251/2011008

Dear Mr. Nazar:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Turkey Point Nuclear

Power Plant during the weeks of July 11 - 15, July 25 - 29 and August 8 - 12, 2011. The

inspection team will be led by David Jones, a Senior Reactor Inspector from the NRC's Region

II Office. This inspection will be conducted in accordance with the baseline inspection

procedure, Procedure 71111.21, Component Design Bases Inspection, issued December 6,

2010.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected risk significant components and operating experience items.

During a telephone conversation on April 20, 2011, Mr. Jones confirmed with Mr. R. Everett of

your staff, arrangements for an information gathering site visit and the three-week onsite

inspection. The schedule is as follows:

  • Information gathering visit: Week of June 27 - July 1, 2011
  • Onsite weeks: July 11 - 15, July 25 - 29 and August 8 - 12, 2011

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor

Analyst, will accompany Mr. Jones during the information gathering visit to review probabilistic

risk assessment data and identify risk significant components which will be examined during the

inspection.

The enclosure lists documents that will be needed prior to the information gathering visit.

Please provide the referenced information to the Region II office by June 6, 2011. Contact

FPL 2

Mr. Jones with any questions concerning the requested information. The inspectors will try to

minimize your administrative burden by specifically identifying only those documents required

for inspection preparation.

Additional documents will be requested during the information gathering visit. The additional

information will need to be made available to the team in the Region II office prior to the

inspection teams preparation week of July 5. Mr. Jones, will also discuss the following

inspection support administrative details: availability of knowledgeable plant engineering and

licensing personnel to serve as points of contact during the inspection; method of tracking

inspector requests during the inspection; licensee computer access; working space;

arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Jones at (404) 997-4631 or me at

(404) 997-4519.

Sincerely,

/RA/

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-250 & 251

License Nos.: DPR - 31 & 41

Enclosure:

Information Request for Turkey Point Nuclear Plant - Component Design Bases Inspection

cc w/enc/: (See page 3)

___ML111240445______________________ G SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME DJONES BDESAI

DATE 5/3/2011 5/3/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

FPL 3

cc w/encl: Ruben D. Almaguer

Alison Brown Director

Nuclear Licensing Division of Emergency Preparedness

Florida Power & Light Company Department of Community Affairs

Electronic Mail Distribution Electronic Mail Distribution

Larry Nicholson Mano Nazar

Director Executive Vice President and Chief Nuclear

Licensing Officer

Florida Power & Light Company Nuclear Division

Electronic Mail Distribution Florida Power & Light Company

P.O. Box 14000

Michael Kiley Juno Beach, FL 33408

Site Vice President

Turkey Point Nuclear Plant Senior Resident Inspector

Florida Power and Light Company Turkey Point Nuclear Generating Station

Electronic Mail Distribution U.S. Nuclear Regulatory Commission

9762 SW 344th St.

Niel Batista Florida City, FL 33035

Emergency Management Coordinator

Department of Emergency Management Attorney General

and Homeland Security Department of Legal Affairs

Electronic Mail Distribution The Capitol PL-01

Tallahassee, FL 32399-1050

Robert J. Tomonto

Licensing Manager Mike A. Shehadeh, P.E.

Turkey Point Nuclear Plant City Manager

Florida Power & Light Company City of Homestead

Electronic Mail Distribution Electronic Mail Distribution

Paul Rubin County Manager of Miami-Dade County

Plant General Manager 111 NW 1st Street, 29th Floor

Turkey Point Nuclear Plant Miami, FL 33128

Florida Power and Light Company

Electronic Mail Distribution Gene St. Pierre

Vice President, Fleet Support

Mitch S. Ross Florida Power & Light Company

Vice President and Associate General Electronic Mail Distribution

Counsel

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi

Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

William A. Passetti

Chief

Florida Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

INFORMATION REQUEST FOR TURKEY POINT NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use.

1. From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4. Contact information for a person to discuss PRA information prior to the information

gathering trip (name, title, phone number, and e-mail address)

5. List of time critical operator actions with a brief description of each action.

6. List of Emergency and Abnormal Operating Procedures revised (significant) since January

1, 2008 with a brief description of each revision.

7. List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or

calculations.

8. List of station operating experience evaluations/reviews performed and documented in the

stations corrective action program for industry events and safety-related equipment

failures/vulnerabilities [as communicated by NRC generic communications, industry

communications, 10 CFR part 21 notifications, etc.] since January 1, 2008.

9. List and brief description of safety-related SSC design modifications implemented since

January 1, 2008.

10. List and brief description of common-cause component failures that have occurred since

January 1, 2008.

11. Operability Determination Procedure(s)

12. List and brief description of operability evaluations completed since January 1, 2008.

Enclosure

2

13. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list and summaries (if available)

of your plans to address the issue(s).

14. List and brief description of equipment currently in degraded or nonconforming status as

described in RIS 05-020.

15. List and reason for equipment classified in maintenance rule (a)(1) status since January 1,

2008 to present.

16. Copy of UFSAR(s)

17. Copy of Technical Specification(s)

18. Copy of Technical Specifications Bases

19. Copy of Technical Requirements Manual(s)

20. Corrective Action Program Procedure(s)

21. Condition reports associated with findings from NRC Inspection Report 2008006

22. List and brief description of Root Cause Evaluations that have been performed since

January 1, 2008.

23. In-service Testing Program Procedure(s)

24. Copies of System Descriptions (or the like) for safety-related systems (mechanical &

electrical)

25. Design bases documents for safety-related systems (mechanical & electrical)

26. Primary AC calculation(s) for safety-related buses

27. Primary DC calculation(s) for safety-related buses

28. One line diagram of electrical plant (electronic and full size)

29. Index and legend for electrical plant one-line diagrams

30. PI&Ds for ECCS systems (electronic and 1/2 size)

31. Index and Legend for PI&Ds

Enclosure