ML11235A630

From kanterella
Revision as of 15:46, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2011-08 DRAFT-Outline Comments
ML11235A630
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/26/2011
From:
Office of Nuclear Reactor Regulation
To:
References
50-313/11-08
Download: ML11235A630 (2)


Text

DRAFT OUTLINE COMMENTS Facility: AN1 First Exam Date: August 26, 2011 Written Exam Outline (Sent June 9, 2011)

Comment Resolution On the ES-401-4 (RO Exam), the Discussed, no issue needing a corrective second item (062 AA1.05) says that action document.

there isnt any procedural guidance on how to address CCW system (ICW at 1

ANO U1) effects/perturbations as a result of loss of Nuclear Service Water.

Is there a corrective action document to track resolving this issue?

In the SRO outline, there were two items Copy submitted with draft exam corrected where the K/A topic described didnt these issues.

match the K/A number provided. The K/A number should be the one randomly selected in the outline building process, and the description should match it.

- Tier 2, Group 1: 007 Pressurizer 2

Relief/Quench Tank, says K/A is A2.01, but one described is A2.02

- Tier 2, Group 2: 045 Main Turbine Generator, says K/A is A2.07, but one described is A2.17 Administrative JPM Outline (Sent June 9, 2011)

Comment Resolution On the ES-301-1, the descriptions need The licensee expanded the text to provide a to provide information that describing the description of the JPMs in the ES-301-1 JPM. The K/A is re-written, but no forms.

1 description to correlate to the K/A statement is provided. The 2010 exam outlines provide an example.

Control Room / In-Plant System JPM Outline (Sent June 9, 2011)

Comment Resolution (Editorial) For Simulator JPM a, fill in the Resolved based on revisions made during 1

Importance Rating for SROs. exam development process.

2 On the ES-301-2, it says that there are 2 Resolved based on revisions made during OBDI 202 - IOLE Process

Emergency or Abnormal In-Plant JPMs. exam development process.

JPM i is the E classified one to meet this. JPM d would not meet this.

Simulator Scenario Outline Comments (Sent June 9, 2011)

Comment Resolution 1

2 3

4 5 OBDI 202 - IOLE Process