ML12060A266

From kanterella
Revision as of 07:27, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Letter to APS Third 10-Year Interval, First Period: Owner'S Activity Report Number U1R16
ML12060A266
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/07/2012
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06469-TNW/CJS
Download: ML12060A266 (5)


Text

10 CFR 50.55a LAMS Palo Verde Nuclear A subsidiaryof Pinnacle West CapitalCorporation Thomas N. Weber Department Leader Tel. 623-393-5764 Mail Station 7636 PO Box 52034 Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 102-06469-TNW/CJS February 07, 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, Docket No. STN 50-528 Third 10-Year Interval, First Period:

Owner's Activity Report Number U1 R16 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report '1 (Form OAR-I) for Unit 1 refueling outage 16 (U1 R1 6). The outage ended on November 28,2011.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, uj4q , -

TNW/RAS/CJS/gat

Enclosure:

Unit 1 Sixteenth Refueling Outage Owner's Activity Report, Report U1R16 cc: E. E. Collins Jr. NRC Region IV Regional Administrator B. K. Singal NRC NRR Project Manager for PVNGS J. R. Hall NRC NRR Senior Project Manager L. K. Gibson NRC NRR Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Cý)

Callaway 0 Comanche Peak

  • Diablo Canyon 0 Palo Verde
  • San Onofre 0 South Texas 0 Wolf Creek

ENCLOSURE Unit I Sixteenth Refueling Outage Owner's Activity Report Report UIRI6

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 1R16 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 1 Commercial service date: Jan 28, 1986 Refueling Outage No.: 16 (if applicable)

Current inspection interval 3rd (1", 2'", 3"', 4 'v, other)

Current inspection period _ 1st (1E' 2rao 3an)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans 09/14/2011 - Revision 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used: N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made inthis report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 1R16 conform to the requirements of Section XI.

(refueling outage number)

- Digitally signed by Bayless, John Bayless, John 1 D(Z07652)

<DN: cn=Bayless, John D(Z07652)

Signed D(Z07652) --Reason: I prepaired this document Date: 2012.01.26 14:01:42 -07'00' Date:

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB CT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Hogstrm,  ::(YH2450) fý Digitally signed by Hogstrom, Robert H ogstrom, ,DN: cn=Hogstrom, Robert (YH2450)

Robert Robet*. ,--,,*-/*curmont (YH2450)" Rason: I have reviewed this Date: 2012.01.2614:08:32 -07'00' D" Commissions NB 9685 "A, N, I, C" Az 264 (Inspector's Signature) National Board, State, Province, and Endorsements Date: _

PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 16 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description

....... None 2

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 16 Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number IJSIAPSV0469 - A Train Shutdown 1/51 1 Replace 3/4" PSV nozzle & disc to correct seat leakage 10/25/11 Work Order # 3445578 Cooling Relief Valve to Reactor Drain Tank 2 1PSGEL005 - Feedwater line to Steam Generator 2 Replace piping and fittings due to FAC 11/19/11 Work Order # 3048670 3 1MDGAE05 - Diesel Generator A Jacket Water Cooler Base metal repair DG Jacket Water Heat Exchanger .10/26/11 Work Order# 3537930

'I- 1- *1-

- *1- + *1-