ML13032A132

From kanterella
Revision as of 22:52, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
8:30 Am Daily Reactor Oversight Coordination Meeting
ML13032A132
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/23/2012
From:
NRC/RGN-I/DRP/PB5
To:
References
FOIA/PA-2013-0045
Download: ML13032A132 (3)


Text

9 V 8:00 AM Reactor Oversight Coordination Meeting - August 23, 2012 Date Added Lead Branch Plant/Issue/Status

/ P MS- U2 Tech Spec required shutdown due to ultimate heat sink.exceeding temp Events, Significant limit of 75 degrees, Mode 3 Safety Issues, and 8/13/12 1PB6 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Operational 8/23/12 PB6 TMI - TS shutdown PZR Heater Leakage; Rx trip for high RCS pressure Challenges 8/13/12 PB6 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IM(C 0309 Reviews 6/21/12 PB1 NMP - U1 AL3 UIL 0.34 gpm Plant Status Items 8/07/12 PB4 S - U1 UIL 0.39 gpm (first 90 days) 5 ofInterest 8/13/12 i 8/20/12 f PB4 1PB2 LM- U1 LP Turbine Blade Inspection 8/31 IP - U2 21CP Freeze Seal/Operator Performance HC - CDBI 7/30, 8/13, 8/27 Salem/HC - 95002 8/27 Team Inspections OC - PI&R 8/13 & 8/27 MS- 95001 9/10 SB - ASR resolution: 1) CAL Follow-up INSP in progress; 2) Working group priority 1/03/12 EB1/PB3 Issues: TIA, deviation memo, technical issues position papers High Profile 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Coordination 7/12/12 PB1 C!.C - Magwood visit to site 8/23 Activities 7/31/12 PB2 IP - Magwood visit 9/13 8/02/12 DRM Region - Chairman visit 9/13 G:\DRP\MorninR MeetinR, Files\New Format 2012\June 2012\06-14-2012.docx

ýý Y

Official Use Only- Pre-Decisional 8/16/12 PB1 CC - GAO visit to site 9/25 8/16/12 PB4 PB --Apostolakis visit 10/3 8/21/12 PB4 MS- Lou Barletta visit 8/24; licensee sponsored visit 8/23/12 PB2 IP - Chairman visit 10/9 Daily Notes & One- PN for TMI Shutdown 8/23/12 Week Look Aheads FOIA Requests 2515/177 ECCS Gas Accumulation - 96% complete, pending at BV Due 1/1 12/31/12

~Due 12/31/12 2515/185 Follow-up on Industry's Groundwater Protection Initiative Due TI Status 2516/001 Review of License Renewal Activities (IP2) 12/31/13 (1 st Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns Due 12/31/13 Due 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 12/31/13 Review of the Implementation of the Industry Initiative to Control Degradation of Due 2515/182 Underground Piping and Tanks -50% 06/30/14 General Announcements and Other Items of Interest G:\DRP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx

Official Use Only - Pre-Decisional Weekend Coverage (Thursdoys) DRP: Clifford DRS: Miller. SLO: RDO: Cook PAO: Screnci 10/2011 PB6 TMI - Flood evaluation review (PI&R sample)

Long-Term Items of 5/29/12 PB4 LM & S. - Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP - ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussed if there 7/31/12 " PB2 FP - Increasing tritium in RB perimeter sump; TI inspection in August are updates) 8/16/12 PSB2 NMP - UL1 Tritium leak, no identified source 9 NRR/OpE o Off-line security issues Following the meeting please select file and send email to Georaqe.Wilson(&Dnrc.cov G:\DRP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx