ML13289A226

From kanterella
Revision as of 13:26, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
6.a.ii.13 SQN Hours of Operation Annual Air Report 2011
ML13289A226
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/10/2012
From: John Carlin
Tennessee Valley Authority
To: Frazier J
Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A226 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384~2000 May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff.

Si *ce President Sequoyah Nuclear Plant Enclosure

SEQUOYAH NUCLEAR PLANT- HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)

Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2