ML13289A226
Text
Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384~2000 May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416
Dear Mr. Frazier:
SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff.
Si
- ce President Sequoyah Nuclear Plant Enclosure
SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2