ML14261A389

From kanterella
Revision as of 00:07, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Staff Update for Sept 2014 Pursuant to Scheduling Order
ML14261A389
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/18/2014
From: Mizuno B
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-327-LR, 50-328-LR, ASLBP 13-927-01-LR-BD01, RAS 26514
Download: ML14261A389 (2)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket Nos. 50-327-LR & 50-328-LR

)

(Sequoyah Nuclear Plant, Units 1 and 2) )

)

NRC STAFF MONTHLY STATUS REPORT The Atomic Safety and Licensing Board, in its Initial Scheduling Order, dated August 26, 2013 (Initial Scheduling Order), ordered the staff of the Nuclear Regulatory Commission (Staff) to file a monthly status report on its best estimate of the dates for issuance of the Draft Supplemental Environmental Impact Statement (DSEIS), Final Supplemental Environmental Impact Statement (FSEIS), Safety Evaluation Report (SER) with open items, and the final SER. The Staff published the DSEIS on July 31, 2014. In accordance with the Initial Scheduling Order, the Staff reported, in the Revised Monthly Status Report that it filed on August 21, 3014, that it expects to publish the SER with open items in January 2015, the final SER in May 2015, and the FSEIS in March 2015.

There have been no changes to these dates. In accordance with the Boards Initial Scheduling Order, the Staff will apprise the Board of any change to the estimated publication dates.

Respectfully submitted,

/Signed (electronically) by/

Beth Mizuno Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15-D21 Washington, DC 20555-0001 Telephone: (301) 415-3122 E-mail: beth.mizuno@nrc.gov Dated at Rockville, Maryland this 18th day of September, 2014

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket Nos. 50-327-LR & 50-328-LR

)

(Sequoyah Nuclear Plant, Units 1 and 2) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing NRC STAFF MONTHLY STATUS REPORT, dated September 18, 2014, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 18th day of Septmeber, 2014.

/Signed (electronically) by/

Beth N. Mizuno Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15-D21 Washington, DC 20555-0001 Telephone: (301) 415-3122 E-mail: beth.mizuno@nrc.gov