ML13290A555

From kanterella
Jump to navigation Jump to search
NRC Staff Monthly Status Report
ML13290A555
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/17/2013
From: Mizuno B
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-327-LR, 50-328-LR, ASLBP 13-927-01-LR-BD01, RAS 25250
Download: ML13290A555 (2)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket Nos. 50-327-LR & 50-328-LR

)

(Sequoyah Nuclear Plant, Units 1 and 2) )

)

NRC STAFF MONTHLY STATUS REPORT In accordance with the Atomic Safety and Licensing Boards Initial Scheduling Order, dated August 26, 2013, the staff of the Nuclear Regulatory Commission (Staff) is filing this monthly status report on the best estimate of the dates when it expects to issue the Draft Supplemental Environmental Impact Statement (DSEIS), Final Supplemental Environmental Impact Statement (FSEIS), Safety Evaluation Report (SER) with open items, and the final SER.

By letter dated July 31, 2013, the Staff reported that it expects to publish the SER with open items in March 2014, the final SER in October 2014, the DSEIS in February 2014, and the FSEIS in October 2014. There have been no changes to these date estimates.

Respectfully submitted,

/Signed (electronically) by/

Beth N. Mizuno Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15-D21 Washington, DC 20555-0001 Telephone: (301) 415-3122 E-mail: Beth.Mizuno@nrc.gov Dated at Rockville, Maryland this 17th day of October, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket Nos. 50-327-LR & 50-328-LR

)

(Sequoyah Nuclear Plant, Units 1 and 2) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing NRC STAFF MONTHLY STATUS REPORT, dated October 17, 2013, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 17th day of October, 2013.

/Signed (electronically) by/

Beth N. Mizno Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15-D21 Washington, DC 20555-0001 Telephone: (301) 415-3122 E-mail: Beth.Mizuno@nrc.gov