Ltr. 06/23/15 Duane Arnold Energy Center - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000331/2015003 (Axd)
ML15175A065
Person / Time
Site: Duane Arnold  NextEra Energy icon.png
Issue date: 06/23/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Vehec T
NextEra Energy Duane Arnold
References
IR 2015003
Download: ML15175A065 (9)


See also: IR 05000331/2015003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

June 23, 2015

Mr. Thomas A. Vehec

Vice President

NextEra Energy Duane Arnold, LLC

3277 DAEC Road

Palo, IA 52324-9785

SUBJECT: DUANE ARNOLD ENERGY CENTER - NOTIFICATION OF AN NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

INSPECTION REPORT 05000331/2015003

Dear Mr. Vehec:

On August 24, 2015, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site

portion of the Triennial Heat Sink Performance Inspection at your Duane Arnold Energy

Center. This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.07.

In order to minimize the impact that the inspection has on the site, and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than July 14, 2015.

  • The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the Residual Heat Removal heat

exchanger, should be available at the Regional Office no later than August 12, 2015.

This information should be separated based on the item numbers identified on the

enclosed list, especially if provided electronically (e.g., folder with I.1, I.2, etc.). During

the in-office preparation activities, the inspector may identify additional information

needed to support the inspection.

  • The last group includes the additional information above as well as plant-specific

reference material. This information should be available on-site to the inspector on

August 24, 2015. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

All requested documents are to be for the time period from the on-site inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the on-site inspection.

T. Vehec -2-

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our

regulatory contact for this inspection is Mr. Robert Murrell of your organization. If there are

questions about the material requested, or the inspection, please call Mr. Andrew Dunlop at

(630) 829-9726. Please send the information via electronic media, or to the following e-mail

address Andrew.Dunlop@nrc.gov. A hard-copy with the required information is also an

acceptable option.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-331;72-032

License No. DPR-49

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc w/encl: Distribution via LISTSERV

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000331/2015003

Inspection Dates: August 24-28, 2015

Inspection Procedure: IP 71111.07, Heat Sink Performance

Inspectors: Andrew Dunlop Lionel Rodriguez

(630) 829-9726 (630) 829-9609

Andrew.Dunlop@nrc.gov Lionel.Rodriguez@nrc.gov

I. Information Requested By July 14, 2015:

1. Copy of heat exchanger performance trending data tracked for both Residual

Heat Removal (RHR) heat exchangers (A/B).

2. List of Corrective Action Program (CAP) documents, with a short description,

associated with the RHR heat exchangers (A/B), heat sinks, silting, corrosion,

fouling, or heat exchanger testing, for the previous 3 years, or since the last CAP

document list was sent to the NRC for the previous Heat Sink Performance

Inspection. The list should include all CAP documents not on the last CAP

document list.

3. Copy of any self-assessment done on any of Generic Letter (GL) 89-13 heat

exchangers.

4. Last two System Health Report(s) and maintenance rule system notebooks for

the RHR heat exchangers (A/B), and the GL 89-13 Program, as applicable.

5. List of engineering-related operator workarounds, with a short description,

associated with the RHR heat exchangers (A/B) initiated in the past 3 years.

6. List of permanent and temporary modifications, with a short description,

associated with the RHR heat exchangers (A/B) initiated in the past 3 years.

II. Information Requested By August 12, 2015:

1. Copies of the GL 89-13 responses.

2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to

the GL 89-13 Heat Exchanger Program.

3. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g. the GL 89-13 Heat Exchanger Program description).

4. Copies of the selected CAP documents.

Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

5. For the RHR heat exchanger A:

a. Copies of the UFSAR sections applicable for the RHR heat exchanger A.

b. Copy of system description and design basis document for the RHR heat

exchanger A (as applicable).

c. Provide a list of calculations (with a short description) which currently

apply to the RHR heat exchanger A:

i. establish the limiting design basis heat load required to be

removed by the RHR heat exchanger A;

ii. demonstrate the RHR heat exchanger A capacity to remove the

limiting heat load;

iii. correlate surveillance testing and/or inspection results from the

RHR heat exchanger A with design basis heat removal capability

(e.g., basis for surveillance test and/or inspection acceptance

criteria);

iv. evaluate the potential for water hammer in the RHR heat

exchanger A or associated piping; and

v. evaluate excessive tube vibration in the RHR heat exchanger A.

d. Copy of any operability determinations or other documentation of

degradation associated with the RHR heat exchanger A or the systems

that support the operation for the heat exchanger.

e. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable

for the RHR heat exchanger A.

f. Copies of normal, abnormal, and emergency operating procedures

associated with the RHR heat exchanger A.

6. For the ultimate heat sink (UHS) and the safety-related service water system

(or equivalent):

a. Copies of the applicable UFSAR sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of

degradation associated with the UHS, and the safety-related service

water system.

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual)

that states the maximum cooling water system inlet temperature limit that

still allows full licensed power operation of the nuclear reactor.

e. Copy of system description and design basis document (as applicable).

2

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

f. Copy of the construction code and Design Specification.

g. Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems,

including procedures for loss of these systems.

h. Copy of any operability determinations or other documentation of

degradation associated with the UHS and the safety-related service water

system.

i. Copies of corrective action documents associated with waterhammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

j. If available, provide an electronic copy of piping and instrumentation

diagrams (P&IDs) for the service water system, including the intake

structure.

k. Provide a list of calculations (with a short description), which currently

apply to UHS and service water system.

l. Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

m. Provide a list of any design change (with a short description) performed

on the UHS or safety-related service water system since the last heat sink

performance inspection.

7. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the on-site portion

of the inspection.

III. Information Requested to be Available on First Day of Inspection, August 24, 2015

1. For the RHR heat exchanger A:

a. Copy of the calculation which correlates surveillance testing results with

design basis heat removal capability (e.g. basis for surveillance test

acceptance criteria).

b. Copies of the two most recent completed tests and evaluation data

confirming thermal performance which are performance tested.

c. Documentation and procedures that identify the types, accuracy, and

location of any special instrumentation used for the two most recently

completed thermal performance tests for RHR heat exchanger A

(e.g., high accuracy ultrasonic flow instruments or temperature

instruments). Include calibration records for the instruments used

during these tests.

d. Information regarding any alarms which monitor on-line performance.

3

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

e. Copy of the document describing the inspection results of the RHR heat

exchanger A.

f. The cleaning and inspection maintenance schedule for the RHR heat

exchanger A for the next 5 years.

g. Copy of the design specification and heat exchanger data sheets for the

RHR heat exchanger A.

h. Copy of the vendor manuals including component drawings for the RHR

heat exchanger A.

i. Copy of the calculation which establishes the limiting (maximum) design

basis heat load which is required to be removed by the RHR heat

exchanger A.

j. Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

k. Copy of the calculations or documents which evaluate the potential for

water hammer in the RHR heat exchanger A or associated piping.

l. Copy of the calculations that evaluate excessive tube vibration in the

RHR heat exchanger A, and the documents that describe the controls

that prevent heat exchanger degradation due to excessive flow induced

vibration during operation.

m. Copy of the periodic flow testing at or near maximum design flow.

n. Copy of the document which identifies the current number of tubes in

service for the RHR heat exchanger A, and the supporting calculation

which establishes the maximum number of tubes which can be plugged in

the RHR heat exchanger A.

o. Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in the RHR heat exchanger A.

p. Copies of the documents that verify the structural integrity of the RHR

heat exchanger A (e.g. eddy current summary sheets, ultrasonic testing

results, and visual inspection results).

q. Copies of those documents that describe the methods taken to control

water chemistry in the RHR heat exchanger A.

2. For the review of the performance testing of the safety-related service water

system (or equivalent) and the UHS:

a. Copies of the last two performance tests, such as the ASME in-service

test, for the pumps, valves, tower fans in the safety-related service water

system. If the components are not performance tested, please provide

documentation verifying performance by the methods actually used.

4

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

b. Copies of the documents that demonstrate that flow balance testing was

performed during the last 3 years. If the last flow test was performed

longer than 3 years, then provide the last flow test.

c. Copies of the documents that demonstrate that flow balance testing will

continue to be periodically done in the future.

d. Copies of procedures used to monitor interface valves between the safety

related section of the service water system and the non-safety related

section and the associated results.

e. Copies of the procedures that verify the performance of risk significant

non-safety functions and the associated results.

3. For the review associated with the system walkdown of the service water intake

structure:

a. Copies of corrective maintenance for the last 6 years, associated with

service water strainers, traveling screens and trash racks.

b. Copies of the last two inspections and/or surveillances, associated with

service water strainers, traveling screens and trash racks.

c. List of preventive maintenance, including frequency, associated with

service water strainers, traveling screens and trash racks.

d. Copies of abnormal procedures for the traveling screens and service

water strainers.

e. Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to

corrosion). For example, inspections for the mounts for the service water

pumps, service water strainers, traveling screens and trash racks.

f. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

g. Copies of surveillance procedures and testing results performed on the

service water pump bay water level instruments.

h. Copies of procedures associated with operating during adverse weather

conditions (e.g., icing, high temperatures, or low level).

i. Copy of the evaluation for the potential effects of low flow/level on

underwater weir walls intended to limit silt or sand intake, if applicable.

If the information requested above will not be available, please contact Mr. Andrew Dunlop as

soon as possible at (630) 829-9726, or e-mail Andrew.Dunlop@nrc.gov.

5

T. Vehec -2-

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our

regulatory contact for this inspection is Mr. Robert Murrell of your organization. If there are

questions about the material requested, or the inspection, please call Mr. Andrew Dunlop at

(630) 829-9726. Please send the information via electronic media, or to the following e-mail

address Andrew.Dunlop@nrc.gov. A hard-copy with the required information is also an

acceptable option.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-331;72-032

License No. DPR-49

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

DISTRIBUTION:

See next page

ADAMS Accession Number ML15175A065

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME ADunlop:cl CLipa

DATE 06/17/15 06/23/15

OFFICIAL RECORD COPY

Letter to Thomas A. Vehec from Christine A. Lipa dated June 23, 2015

SUBJECT: DUANE ARNOLD ENERGY CENTER - NOTIFICATION OF AN NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

INSPECTION REPORT 05000331/2015003

DISTRIBUTION:

Kimyata MorganButler

RidsNrrDorlLpl3-1 Resource

RidsNrrPMDuaneArnold Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu