ML15334A486
ML15334A486 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 11/30/2015 |
From: | Vincent Gaddy Operations Branch IV |
To: | Cortopassi L Omaha Public Power District |
References | |
IR 2015301 | |
Download: ML15334A486 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 November 30, 2015 Lou Cortopassi, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT 1 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000285/2015301
Dear Mr. Cortopassi:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Fort Calhoun Station.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to E. Linzer, Licensed Operator Initial Training Supervisor. Note that any examination waivers and application denials have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, on December 14, 2015. The NRC staff will administer the operating tests during the week of December 7, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Clyde Osterholtz, at (817) 200-1269, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Vincent Gaddy, Chief Operations Branch Division of Reactor Safety
Omaha Public Power District Docket: 50-285 License: DPR-40
Enclosure:
ES-201-4 cc w/enclosure:
E. Linzer, Supervisor Licensed Operator Initial Training Omaha Public Power District 9610 Power Lane Mail Stop FC-3-1 Blair, NE 68008 cc w/o enclosure:
Distribution via ListServ for Fort Calhoun
Omaha Public Power District Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)
X SUNSI Review ADAMS X Publicly Available X Non-Sensitive Keyword:
By: lah X Yes No Non-Publicly Available Sensitive NRR-079 OFFICE RIV:DRS:OB SOE:OB C:OB NAME LAHurley COsterholtz VGaddy SIGNATURE /RA/ /RA/ /RA/
DATE 11/23/15 11/25 /15 11/30/15 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 November 30, 2015 Lou Cortopassi, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT 1 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000285/2015301
Dear Mr. Cortopassi:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Fort Calhoun Station.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to E. Linzer, Licensed Operator Initial Training Supervisor. Note that any examination waivers and application denials have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, on December 14, 2015. The NRC staff will administer the operating tests during the week of December 7, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Clyde Osterholtz, at (817) 200-1269, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Vincent Gaddy, Chief Operations Branch Division of Reactor Safety
Omaha Public Power District Docket: 50-285 License: DPR-40
Enclosure:
ES-201-4 cc w/enclosure:
E. Linzer, Supervisor Licensed Operator Initial Training Omaha Public Power District 9610 Power Lane Mail Stop FC-3-1 Blair, NE 68008 cc w/o enclosure:
Distribution via ListServ for Fort Calhoun
Omaha Public Power District Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)
X SUNSI Review ADAMS X Publicly Available X Non-Sensitive Keyword:
By: lah X Yes No Non-Publicly Available Sensitive NRR-079 OFFICE RIV:DRS:OB SOE:OB C:OB NAME LAHurley COsterholtz VGaddy SIGNATURE /RA/ /RA/ /RA/
DATE 11/23/15 11/25 /15 11/30/15 OFFICIAL RECORD COPY