ML19274C656

From kanterella
Revision as of 12:49, 25 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
from Operating to Decommissioning a Resident Inspector Perspective - Elizabeth Andrews 2019 National State Liaison Officer Conference Presentation
ML19274C656
Person / Time
Issue date: 10/01/2019
From: Andrews L
NRC Region 1
To:
RAKOVAN L/NMSS/MSST
Shared Package
ML19274C654 List:
References
Download: ML19274C656 (7)


Text

Liz Andrews Decommissioning, ISFSI, and Reactor HP Branch

Reactors Certification Materials of Permanent Fuel Removal Reactor Oversight Program Decom Oversight Program 2 Resident Inspectors Decision Permanent Fuel Decommissioning 1 Resident to Cease Cessation Offloaded Staff (3 months)

Operations of Power to Spent Operations Fuel Pool Major Abandon Systems, Decommissioning Staff Changes, and/or Revisions of Procedures Storage Activities PSDAR Submittal within 2 years of permanent cessation of power

Operating Reactor Inspection Plan Resident Inspector: eyes and ears Inspection Manual Chapter 2515 Baseline inspections

Areas Potentially Impacted Deferral of maintenance and tests Reduction in use of corrective action program Decreased emphasis on radiation protection Reduction in staffing levels and craft skill

Changes to the Inspection Plan Cancelled inspections Modified inspections Focused inspections

Resident Observations Corrective action program Overall morale and staff concerns Staffing levels