ML17234A528
From kanterella
Revision as of 00:11, 18 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17234A528 | |
Person / Time | |
---|---|
Site: | Limerick ![]() |
Issue date: | 08/25/2017 |
From: | V Sreenivas Plant Licensing Branch 1 |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
Sreenivas V, NRR/DORL/LPL1, 415-2596 | |
References | |
CAC MF9873, CAC MF9874 | |
Download: ML17234A528 (3) | |
Similar Documents at Limerick | |
---|---|
Category:Acceptance Review Letter
MONTHYEARML23086A0822023-03-27027 March 2023
[Table view]Acceptance of Requested Licensing Action for Exemption Request to Support Digital Modernization Project Installation ML22339A0642022-12-0909 December 2022 Generation Station, Unit Nos. 1 and 2 Acceptance of Requested Licensing Action Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML22320A1132022-11-21021 November 2022 Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests ML22112A2152022-03-28028 March 2022 Limerick_Acceptance Review TS Change to Correct Nonconservative Technical Specification Table 3.3.3-1 ML21140A0842021-05-19019 May 2021 Acceptance of Requested Licensing Action Revision to Appendix C License Conditions in Accordance with the Requirements of 10 CFR 50.69 (E-mail) ML21111A0312021-04-20020 April 2021 Application to Modify 50.69 Categorization to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML20304A1432020-10-30030 October 2020 Acceptance Review: Relocation of Pressure and Temperature Limit Report ML20273A1582020-09-29029 September 2020 Acceptance Review: to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20268B2362020-09-24024 September 2020 Acceptance Review: Relief Requesting Residual Heat Removal Heat Exchanger Category C-A and C-B Examinations ML20092G8352020-04-0101 April 2020 Acceptance Review - TS Change 3.10.8, Inservice Leak - TSTF-484 ML20091N0492020-03-27027 March 2020 Acceptance Review: TS Change for Testing of the SRVs to Retain the Frequency and Associated Relief Requests in the IST Program (EPIDs L-2020-LLA-0052 and L-2020-LLA-0043) ML19357A0892019-12-23023 December 2019 Acceptance Review: Technical Specification 40.5 Requirements to Reflect the Allowance Provided in 10 CFR 50.69(b)(1)(v) to Perform Alternative Treatement of SSC J(Epid: L-209-LLA-263) ML19248B7322019-09-0505 September 2019 Letter to R. Libra Alternative Request Pertaining to Dry Shielded Canisters Equipped with Boral Neutron Absorber Plates - Accepted for Review ML19239A1552019-08-26026 August 2019 Acceptance Review for Limerick - Relocation of Chlorine and Toxic Gas Detection System TSs License Amendment Request ML19030A1472019-01-30030 January 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action to Adopt Risk-Informed Completion Times in Accordance with TSTF-505, Revision 2 ML18295A5312018-10-22022 October 2018 Acceptance Review: Relief Request I4R-08, Revision 1 for the Fourth Inservice Inspection Interval of Limerick Generating Station (LGS) Units 1 and 2 ML18052B0762018-02-21021 February 2018 Acceptance Review: Revise Technical Specifications to Lower the Minimum Standby Liquid Control System Pump Flowrate ML17234A5282017-08-25025 August 2017 Acceptance of Requested Licensing Action Adoption of Title 10 of the Code of Federal Regulations Section 50.69 ML17137A1542017-05-16016 May 2017 Acceptance Review for Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs ML17009A3792017-01-0909 January 2017 Acceptance of Requested Licensing Action Regarding Amendment-Partial Length Fuel Rod Burn-up ML17009A2932017-01-0909 January 2017 Acceptance of Requested Licensing Action Regarding Amendment-Partial Length Fuel Rod Burn-up ML17003A3292017-01-0303 January 2017 Acceptance Review - Limerick Unit 2 - Safety Limit Minimum Critical Power Ratios ML16319A1262016-11-14014 November 2016 Acceptance Review - Limerick 1 and 2 - Relief Request GVRR-8 ML16237A0362016-08-24024 August 2016 Acceptance Review: Limerick 1 & 2 - TS ISI and IST Program Requirements (CACs MF8193 and MF8194) ML16055A3692016-02-24024 February 2016 Acceptance Review: Limerick 1 & 2 - Reduce Steam Dome Pressure Amendment Request (CACs MF7263 and MF7264) ML15341A0232015-12-0707 December 2015 Acceptance Review for CAC MF7101 - Limerick Unit 1 - Safety Limit Minimum Critical Power Ratio ML15120A0812015-04-30030 April 2015 Acceptance Review for TACs MF6094 & MF6095 - Limerick Units 1 and 2 - Submittal of Relief Request to Use Code Case OMN-18 ML14329B2982014-11-25025 November 2014 Email- Acceptance Review for TACs MF5133 & MF5134 - Limerick Units 1 and 2 - Add New LCOs 3.0.5 and 3.0.6 ML14212A3802014-07-31031 July 2014 Acceptance Review for TACs MF4412 & MF4413 - Limerick Units 1 and 2 - TSTF-523, Generic Letter 2008-01 - Managing Gas Accumulation ML13101A0482013-04-11011 April 2013 Acceptance Review for TACs ME1399 & ME1400 - Limerick Units 1 and 2 - Eliminate Certain TS Reporting Requirements ML12331A0382012-11-26026 November 2012 Acceptance Review for License Amendment Request to Relocate MOV TOL Protection to TRM ML1119403082011-07-13013 July 2011 Acceptance Review of License Amendment Request to Include an Alternate Method of Verifying Drywell Leakage - TAC Nos ME6521 & ME6522 ML1116804112011-06-17017 June 2011 Acceptance Review for Exelon Threshold Determination Request (TAC ME6269 - ME6287) ML1113101262011-05-11011 May 2011 Acceptance Review of Limerick License Amendment Request Regarding TSTF-514, RCS Leakage Detection Instrumentation, TAC Nos. ME5993 & ME5994 ML1021502822010-08-0303 August 2010 Acceptance Review of Limerick LAR Regarding HPCI Dt Isolation Setpoint Change - TACs ME4171/ME4172 ML1008800852010-07-21021 July 2010 Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5 ML1005400432010-02-22022 February 2010 Acceptance Review of Limerick Relief Request I3R-13, Pressure Testing of Primary Containment Gas Piping ML0924700432009-09-0303 September 2009 3 Acceptance Review Results Request to Use Specific Provisions from a Later Edition of the ASME Boiler and Pressure Vessel Code 2023-03-27 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17234A528&oldid=194459"