Letter Sequence Acceptance Review |
---|
EPID:L-2017-LLA-0376, COL Docs - Draft RAI #1 for LAR-17-039, Unqualified Service Level 1 Coatings Program (Approved, Closed) |
|
MONTHYEARML18054A0232018-02-23023 February 2018 COL Docs - Draft RAI #1 for LAR-17-039, Unqualified Service Level 1 Coatings Program Project stage: Request ML18060A3962018-03-0101 March 2018 COL Docs - Final RAI #1 for LAR-17-039, Unqualified Service Level 1 Coatings Program Project stage: Request ND-18-0347, Supplement to Request for License Amendment and Exemption Regarding Unqualified Service Level I Coatings Program2018-03-28028 March 2018 Supplement to Request for License Amendment and Exemption Regarding Unqualified Service Level I Coatings Program Project stage: Supplement ML18094B0642018-04-0404 April 2018 COL Docs - Final Audit Plan for LAR-17-039 Unqualified Service Level 1 Coatings Program Project stage: Request ML18142B4822018-05-31031 May 2018 Us NRC Audit Report Related to License Amendment Request (LAR) 17-039 Unqualified Service Level 1 Coatings Program Project stage: Other ML18158A3132018-07-10010 July 2018 Safety Evaluation, Vogtle Electric Generating Plant, Units 3 and 4 LAR-17-039 Project stage: Approval ML18158A3052018-07-10010 July 2018 Issuance of Amendments and Granting of Exemptions Unqualified Service Level I Coatings Program (LAR 17-039) Project stage: Request ML18158A3122018-07-10010 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 LAR-17-039 Project stage: Acceptance Review ML18158A3112018-07-10010 July 2018 Amendment No. 130 - Vogtle Electric Generating Plant, Unit 4 LAR-17-039 Project stage: Other ML18158A3102018-07-10010 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 3 LAR-17-039 Project stage: Acceptance Review ML18158A3092018-07-10010 July 2018 Amendment No. 131 - Vogtle Electric Generating Plant, Unit 3 LAR-17-039 Project stage: Other ML18158A3082018-07-10010 July 2018 Exemption - Vogtle Electric Generating Plant, Unit 4 LAR-17-039 Project stage: Other ML18158A3072018-07-10010 July 2018 Exemption - Vogtle Electric Generating Plant, Unit 3 LAR-17-039 Project stage: Other ML18158A3062018-07-10010 July 2018 Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4 LAR-17-039 Service Level 1 Coatings Program Amendment No. 131/130 Project stage: Other 2018-03-28
[Table View] |
|
---|
Category:License-Combined License (COL) (New/Renewal/Amendments) DKT 52
MONTHYEARML23243B0542023-12-19019 December 2023 VEGP Unit 4 Amendment No. 193 - Enclosure 2 ML23243A9682023-12-19019 December 2023 VEGP Unit 3 Amendment No. 197 - Enclosure 1 ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action ML23159A0972023-07-31031 July 2023 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 23-001) ML23072A2722023-05-0101 May 2023 Enclosure 1 - LAR 22-005 Amendment No. 191 Vogtle Unit 3 ML23072A2732023-05-0101 May 2023 Enclosure 2 - LAR 22-005 Amendment No. 188 Vogtle, Unit 4 ML23072A2762023-05-0101 May 2023 Attachment to Enclosure 2 - VEGP U4 Amendment 188 LAR-22-005 ML23037A0892023-02-0808 February 2023 Amendment - Vogtle Unit 3 Amendment No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML20290A2822022-08-0303 August 2022 Finding That Acceptance Criteria in the Combined License Are Met (10 CFR 103g - Finding) ML21237A2342021-10-15015 October 2021 Amendment Unit 3 - Vogtle Electric Generating Plant LAR 21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2352021-10-15015 October 2021 Attachment Unit 3 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2372021-10-15015 October 2021 Attachment Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2362021-10-15015 October 2021 Amendment Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21217A0242021-09-17017 September 2021 Amendment No. 187 - Vogtle Electric Generating Plant Unit 3 ML21217A0252021-09-17017 September 2021 Amendment No. 185 - Vogtle Electric Generating Plant Unit 4 ML21217A0272021-09-17017 September 2021 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment No. 185 ML21217A0262021-09-17017 September 2021 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment No. 187 ML20314A0132020-12-0707 December 2020 License Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 20-005) ML20314A0142020-12-0707 December 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 184 (LAR-20-005) ML20314A0112020-12-0707 December 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 186 (LAR-20-005) ML20314A0102020-12-0707 December 2020 License Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-005) ML20247J4612020-10-14014 October 2020 Amendment 183 - Vogtle Electric Generating Plant Unit 4 (LAR 20-004) ML20247J4592020-10-14014 October 2020 Amendment 185 - Vogtle Electric Generating Plant Unit 3 (LAR 20-004) ML20237F4922020-09-24024 September 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 184 (LAR-20-003) ML20237F4942020-09-24024 September 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 182 (LAR-20-003) ML20237F4932020-09-24024 September 2020 Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 20-003) ML20237F4912020-09-24024 September 2020 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-003) ML20196L6772020-08-11011 August 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 183 for LAR-20-002 ML20196L6782020-08-11011 August 2020 Amendment 181 - Vogtle Electric Generating Plant Unit 4 for LAR 20-002 ML20196L6792020-08-11011 August 2020 Attachment - Vogtle Electric Generating Plant Unit 4 for Amendment 181 for LAR-20-002 ML20132A0762020-08-0404 August 2020 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR 20-001) ML20059N7792020-05-12012 May 2020 Amendment 181 - LAR-19-010: Auxiliary Building Room Heatup ML20059N7822020-05-12012 May 2020 Amendment 180 - LAR-19-010: Auxiliary Building Room Heatup ML20106F1632020-05-12012 May 2020 Attachment to Amendment 180 - LAR-19-010: Auxiliary Building Room Heatup ML20106F1622020-05-12012 May 2020 Attachment to Amendment 181 - LAR-19-010: Auxiliary Building Room Heatup ML20120A0072020-04-30030 April 2020 Attachment for Amendment 178 Cyber Security Plan Changes (LAR-19-020) ML20106F1592020-04-30030 April 2020 Attachment for Amendment 179 Cyber Security Plan Changes (LAR-19-020) ML20057E1172020-04-30030 April 2020 Amendment 178 - Issuance of Amendments for Cyber Security Plan Changes (LAR-19-020) ML20057E1062020-04-30030 April 2020 Amendment 179 - Issuance of Amendments for Cyber Security Plan Changes (LAR-19-020) ML20064E6682020-03-23023 March 2020 Enclosure 4: Supplemental Attachment to License Amendment No. 148 for COL No. NPF-91 ML20064E6802020-03-23023 March 2020 Enclosure 5: Supplemental Attachment to License Amendment No. 147 for COL No. NPF-92 ML20064E5722020-03-23023 March 2020 Supplemental Attachment to License Amendment No. 36 for COL No. NPF-92 ML20064E6122020-03-23023 March 2020 Enclosure 2: Supplemental Attachment to License Amendment No. 125 for COL No. NPF-91 ML20064E6282020-03-23023 March 2020 Enclosure 3: Supplemental Attachment to License Amendment No. 124 for COL No. NPF-92 ML20013G6882020-02-0303 February 2020 Amendment - Vogtle Electric Generating Plant Unit 4 ML19350C7142020-01-28028 January 2020 Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 19-015) ML19350C6862020-01-28028 January 2020 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 19-015) ML19350C7002020-01-28028 January 2020 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR 19-015).d 2023-07-31
[Table view] |
Text
ATTACHMENT TO LICENSE AMENDMENT NO. 131 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO.52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-91 REMOVE INSERT 7 7 Appendix C to Facility Combined License No. NPF-91 REMOVE INSERT C-137 C-137
(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b) SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 131, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program
- 1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 131
Table 2.2.3-4 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Design Commitment Inspections, Tests, Analyses Acceptance Criteria 195 2.2.03.08c.x 8.c) The PXS provides RCS makeup, x) Inspections will be conducted x) A report exists and boration, and safety injection during of the as-built nonsafety-related concludes that the coatings design basis events. coatings or of plant records of used on these surfaces have a the nonsafety-related coatings dry film density of used inside containment on 100 lb/ft3. If a coating is walls, floors, ceilings, and used that has a lower dry film structural steel except in the density, a report must exist CVS room. Inspections will be and conclude that the coating conducted of the as-built non- will not transport. A report safety-related coatings or of exists and concludes that plant records of the non-safety- inorganic zinc coatings used related coatings used on on these surfaces are Safety -
components below the maximum Service Level I or have been flood level of a design basis quantified and justified in a LOCA or located above the program for management of maximum flood level and not unqualified coatings to inside cabinets or enclosures. demonstrate the unqualified coatings are acceptable for use.
Inspections will be conducted on A report exists and concludes caulking, tags, and signs used that tags and signs used in inside containment below the these locations are made of maximum flood level of a design steel or another metal with a basis LOCA or located above the density 100 lb/ft3. In maximum flood level and not addition, a report exists and inside cabinets or enclosures. concludes that caulking used in these locations or coatings used on these signs or tags have a dry film density of 100 lb/ft3. If a material is used that has a lower density, a report must exist and conclude that there is insufficient water flow to transport lightweight caulking, signs, or tags.
Inspections will be conducted of A report exists and concludes ventilation filters and fiber- that the ventilation filters and producing fire barriers used fire barriers in these locations inside containment within the have a density of 100 lb/ft3.
ZOI or below the maximum flood level of a design basis LOCA.
196 2.2.03.08c.xi 8.c) The PXS provides RCS makeup, xi) Inspection of the as-built xi) The CMT inlet diffuser boration, and safety injection during CMT inlet diffuser will be has a flow area 165 in2.
design basis events. conducted.
C-137 Amendment No. 131