ML18267A319

From kanterella
Revision as of 15:16, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Second Draft Safety Evaluation of Pressurized Water Reactor Owners Group-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (Cac No. MF8075; EPID: L-2016-TOP-0006)
ML18267A319
Person / Time
Site: 99902028
Issue date: 03/25/2019
From: Dennis Morey
NRC/NRR/DLP/PLPB
To: Pimentel F
Nuclear Energy Institute
Holonich J, NRR/DLP/PLPB, 415-7297
References
CAC MF8075, EPID L-2016-TOP-0006
Download: ML18267A319 (3)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION March 25, 2019 Ms. Frances Pimentel, Sr. Project Manager, Risk and Technical Support Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004

SUBJECT:

SECOND DRAFT SAFETY EVALUATION OF PRESSURIZED WATER REACTOR OWNERS GROUP-15060, "PUMP SUCTION GAS ACCUMULATION OPERABILITY CRITERIA GUIDANCE" (CAC NO. MF8075; EPID: L-2016-TOP-0006)

Dear Ms. Pimentel:

By letters dated May 5 and 9, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML16147A079 and ML16147A123, respectively), the Nuclear Energy Institute (NEI) and Pressurized Water Reactor Owners Group (PWROG) submitted nonproprietary and proprietary versions of topical report (TR) PWROG-15060, "Pump Suction Gas Accumulation Operability Criteria Guidance. The U.S. Nuclear Regulatory Commission (NRC) staff transmitted its draft safety evaluation (SE) via letter dated June 25, 2018 (ADAMS Accession No. ML18072A002).

On August 30, 2018, the NRC staff met with representatives from NEI and the PWROG to discuss the PWROG comments on the initial draft SE for PWROG-15060 (ADAMS Package Accession No. ML18232A071). Following that meeting, the PWROG sent a letter dated September 10, 2018 (ADAMS Accession No. ML18297A054) to the NRC asking the NRC staff to hold the review of PWROG-15060 in abeyance until the PWROG could transmit its comments on the draft SE. A second letter dated September 20, 2018, provided the PWROG comments on the draft SE (ADAMS Accession No. ML18290A513).

Based on the discussions held at the August 30, 2018, meeting and the comments provided by the PWROG, the NRC staff has prepared a revised draft SE. Pursuant to Title 10 of the Code of Federal Regulations Section 2.390 (10 CFR 2.390), the NRC staff has determined that the enclosed revised draft SE may contain proprietary information. If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. Twenty working days are provided for NEI and the PWROG to comment on any proprietary information, factual errors, or clarity concerns contained in the revised draft SE.

The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff disposition of your comments on the revised draft SE will be discussed in the final SE.

NOTICE: The enclosure transmitted herewith contains Proprietary Information. When separated from the enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION F. Pimentel To facilitate the NRC staff review of your comments, please provide a marked-up copy of the revised, draft SE showing proposed changes and provide a summary table of the proposed changes as an appendix in the revised, draft SE.

If you have any questions, please contact the Project Manager for the review, Joseph J. Holonich at 301-415-7297 or by electronic mail at Joseph.Holonich@nrc.gov.

Sincerely,

/RA/

Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99902028

Enclosure:

Draft SE OFFICIAL USE ONLY - PROPRIETARY INFORMATION

ML18267A311 (Package);

ML18267A319 (Letter/Public);

ML18267A326 (Draft SE/Non-Public); *concurrence via e-mail NRR-106 OFFICE DLP/PLPB/PM* DLP/PLPB/LA* DSS/SRXB/BC* DLP/PLPB/BC NAME JHolonich DHarrison JWhitman DMorey DATE 03/12/2019 03/12/2019 03/15/2019 03/25/2019