Letter Sequence Other |
---|
|
|
MONTHYEARML19141A0292019-06-13013 June 2019 U.S. Nuclear Regulatory Commission Verification Letter for Electric Power Research Institute Report 3002013039, EPRI MOV Performance Prediction Program: Addendum 10 to EPRI 103237 R2: PPM Version 4.0 Software Changes Project stage: Other 2019-06-13
[Table View] |
|
---|
Category:Letter
MONTHYEARML20205L6042020-07-23023 July 2020 Endorsement of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with the Balance of Plant, Dated July 2020, by August 30, 2020 ML20199M3682020-07-17017 July 2020 NRC Review of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with Safety-Related and Important-to-Safety Functions, Dated July 2020 ML20154K5662020-06-0101 June 2020 Availability of NEI 20-09, Performance of PRA Peer Reviews Using the Asme/Ans Advanced Non-LWR Standard, for NRC Review and Endorsement ML20141L7882020-05-20020 May 2020 NEI - Comments on Draft Micro-Reactor Applications COL-ISG-029, Environmental Considerations Associated with Micro-Reactors ML20134J0332020-05-13013 May 2020 Submittal of Response to Request for Additional Information (RAI) for NEI 14-05A, Revision 1, Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services ML20115E4132020-04-24024 April 2020 Endorsement of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with the Balance of Plant, Dated April 2020 ML20100G9022020-04-0909 April 2020 NEI - Submittal of NEI 15-03, Revision 3, Licensee Actions to Address Nonconservative Technical Specifications ML20065N1592020-03-0505 March 2020 NEI - Recommendations for Streamlining Environmental Reviews for Advanced Reactors ML19318F1682020-01-0606 January 2020 Verification Letter for Technical Reports Benchmarks for Quantifying Fuel Reactivity Depletion Uncertainty - Revision 1-A and Utilization of the EPRI Depletion Benchmarks for Burnup Credit Validation - Revision 2-A ML19351D2742019-12-17017 December 2019 NEI - Request for NRC Review and Endorsement of NEI 00-01, Guidance for Post Fire Safe Shutdown Circuit Analysis, Revision 4, and NEI 04-02, Guidance for Implementing a Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 5 ML19330G0982019-11-26026 November 2019 NEI - Endorsement of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with the Balance of Plant, Dated November 2019 ML19316C6572019-11-12012 November 2019 Fee Exemption Request for Activities Performed for NRC Review and Endorsement of NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 1 ML19316C7142019-11-12012 November 2019 (Nei), NRC Review and Endorsement of NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 1 ML19269E0562019-09-26026 September 2019 Transmittal of EPRI Benchmark Revision 1-A, Utilization Revision 2, Utilization Revision 2-A, and NEI 12-16, Revision 4 ML19261C4702019-09-18018 September 2019 NEI - Review and Endorsement of NEI 18-11, Maintaining 10 CFR Part 95 Facility Clearances for Voluntary Program Participants, Revision 1, Dated September 2019 ML19134A2892019-07-31031 July 2019 Final Proprietary Safety Evaluation for Radics Topical Report ML19189A1122019-07-19019 July 2019 Final Safety Evaluation Cover Letter to EPRI Topical Reports 3002010613 and 3002010614 ML19196A2922019-07-15015 July 2019 NEI Comments on Draft Regulatory Guide (Dg), DG-1356, Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments, 84 Fed. Reg. 25077; Docket Id NRC-2019-0086 ML18184A4092019-06-19019 June 2019 Final Proprietary Safety Evaluation of PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (CAC No. MF8075; EPID L-2016-TOP-0006) ML19141A0292019-06-13013 June 2019 U.S. Nuclear Regulatory Commission Verification Letter for Electric Power Research Institute Report 3002013039, EPRI MOV Performance Prediction Program: Addendum 10 to EPRI 103237 R2: PPM Version 4.0 Software Changes ML19123A2372019-05-0303 May 2019 Fee Exemption Request for Activities Performed for the NEI Composite Adversary Force ML19196A2772019-04-11011 April 2019 NEI Letter Re Industry Review of the NRC Draft Comment Disposition Table ML19109A1272019-04-11011 April 2019 Industry Review of the NRC Draft Comment Disposition Table ML18267A3192019-03-25025 March 2019 Second Draft Safety Evaluation of Pressurized Water Reactor Owners Group-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (Cac No. MF8075; EPID: L-2016-TOP-0006) ML19196A2732019-01-31031 January 2019 NEI Letter Providing Draft SE Comments to EPRI Topical Reports 3002010613 and 3002010614 ML19058A2602019-01-29029 January 2019 PWR & BWR Knowledge and Abilities Master Catalogs ML18365A0372019-01-25025 January 2019 Staff Evaluation of Electric Power Research Institute Report 3002013039, EPRI MOV (Motor Operated Valve) Performance Prediction Program: Addendum 10 to EPRI 103237-R2: PPM (Performance-Prediction Model) Version 4.0 Software Changes ML18352A8152018-12-18018 December 2018 Fee Exemption Request for NEI 18-11, Maintaining 10 CFR Part 95 Facility Clearances for Voluntary Program Participants, Dated November 2018 ML18348B2102018-12-14014 December 2018 Endorsement of Addendum 7 to NEI 08-09, Evaluating and Documenting Use of Alternative Cyber Security Controls / Countermeasures, Revision 6 Dated April 2010 ML18331A1562018-12-14014 December 2018 Acknowledgement of Receipt of Industry Initiative on Open Phase Condition, Revision 2 ML18289A7742018-12-10010 December 2018 Denial of Fee Exemption Request for Charges Incurred in Review of a Special Project Related to NEI ML18312A2732018-11-0808 November 2018 Follow-Up on Request for Additional Information on EPRI MOV Performance Prediction Program: Addendum 10 to EPRI 103237-R2: PPM Version 4.0 Software Changes ML18275A3872018-11-0505 November 2018 Requests for Withholding of EPRI MOV Performance Prediction Program: Addendum 10 to EPRI 103237-R2: PPM Version 4.0 Software Changes ML18234A0382018-08-21021 August 2018 Disputes Fees Described in Invoice Lfb 18-5202 ML18072A0022018-06-25025 June 2018 U.S. Nuclear Regulatory Commission Staff Safety Evaluation of PWROG-15060-P, Pump Suction Gas Accumulation Operability Criteria Guidance (Letter) ML18121A2462018-05-31031 May 2018 Draft Safety Evaluation for the Electric Power Research Institute (EPRI) Topical Report 3002010613, Benchmarks for Qualifying Fuel Reactivity Depletion Uncertainty Revision 1 and Topical Report 3002010614, Utilization of the EPRI Depletion 2020-07-23
[Table view] |
Text
June 13, 2019 Mr. Timothy Riti Senior Project Manager, Regulatory Affairs Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004
SUBJECT:
U.S. NUCLEAR REGULATORY COMMISSION VERIFICATION LETTER FOR ELECTRIC POWER RESEARCH INSTITUTE REPORT 3002013039, EPRI MOV PERFORMANCE PREDICTION PROGRAM: ADDENDUM 10 TO EPRI 103237 R2: PPM VERSION 4.0 SOFTWARE CHANGES (EPID: L-2019-TOP-0013)
Dear Mr. Riti:
By letter dated May 17, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19142A251), the Nuclear Energy Institute submitted for the U.S. Nuclear Regulatory Commission (NRC) staff review EPRI [Electric Power Research Institute] MOV [motor-operated valve] Performance Prediction Program: Addendum 10 to EPRI 103237-R2: PPM Version 4.0 Software Changes-A. Also attached to the May 17, 2019, letter was a May 6, 2019, letter providing a May 7, 2019, affidavit executed by Neil Wilmshurst, Vice President and Chief Nuclear Officer, EPRI. The affidavit requested that the information contained in the proprietary version of the EPRI 103237-R2 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390.
A nonproprietary copy (ADAMS Accession No. ML19142A252) has been placed in the NRCs Public Document Room and added to the NRC Library in ADAMS.
The -A version of the topical reports, incorporate the NRC staffs letter accepting the Addendum 10 changes, the request for additional information (RAI) questions, and the RAI responses. Based on its review of the changes documented in the EPRI 103237-R2, the NRC staff has determined that the -A reports are acceptable to the extent delineated in the NRC staffs original letter, dated January 25, 2019 (ADAMS Accession No. ML18365A037).
With respect to the request for withholding the information in proprietary version of the report, EPRI detailed the reasons in its affidavit.
The NRC staff has reviewed the application and the material in accordance with the requirements of 10 CFR 2.390. Based on the statements in the affidavit, the NRC staff has determined that the submitted information contains proprietary, commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure under 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
T. Riti Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the agency may send copies of this information to its consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public inspection, you should promptly notify the NRC staff.
You also should understand that the NRC staff may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions or require any additional information, please feel free to contact the Project Manager for this topical report, Joseph Holonich, at 301-415-7297 or joseph.holonich@nrc.gov.
Sincerely,
/RA/
Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99902028
ML19141A029 NRR-106 OFFICE NRR/DLP/PLPB/PM* NRR/DLP/PLPB/LA* NRR/DE/EMIB/BC* NRR/DLP/PLPB/BC NAME JHolonich DHarrison SBailey KHsu(for) DMorey DATE 05/31/2019 05/30/2019 05/31/2019 06/13/2019