Category:CONSTRUCTION PERMITS-APPLICATION & AMENDMENTS TO APP
MONTHYEARML19220B2291978-05-19019 May 1978 Withdrawal of Application for Amend of CP ML19220B2321978-05-19019 May 1978 Withdrawal of Application for Amend ML19206A5271977-08-15015 August 1977 Amend 1 to Application for Amend to CP ML19206A8881974-09-20020 September 1974 Amend 20 to Application for CP & Ol,Revising FSAR Re Seismic,Geological & Foundation Aspects.Certificate of Svc Encl ML19206A2441974-07-25025 July 1974 Amend 19 to CP & Ol.Certificate of Svc Encl ML19206A8701974-06-27027 June 1974 Application for CP & Ol.Certificate of Svc Encl ML19206A9721974-05-0303 May 1974 Amend 14 to CP & Ol,Incorporating Revisions to FSAR ML19256D8801971-11-22022 November 1971 Application to Amend 670503 CP Application,Revising Completion Dates.Estimates 720930 & 730930 as Earliest & Latest Completion Dates,Respectively.Cites 11 Wk Const Strike as Major Contributor to Delay ML19256D9931971-10-26026 October 1971 Application to Amend 670503 CP Application,Revising Completion Dates.Estimates Earliest & Latest Completion Dates as 730831 & 740228,respectively ML19326D2641971-04-0202 April 1971 Amend 20 to Application for CP & Ol,Providing for Liquid Waste,Except Laundry Waste,Recycle & Reuse During Normal Plant Operation.Gaseous Release 30-day Hold Period Specified ML19220B9501970-12-21021 December 1970 Amend 11 to CP Application ML19206A9171969-10-0101 October 1969 Suppl to Summary Description of Application for CP & OL ML19206A9421969-09-0303 September 1969 Summary Description of Application for CP & OL ML19206A2071969-06-0404 June 1969 Amend 10 to CP Application Adding Info Re Reactor Coolant Pump Flywheel,Preoperational Environ Surveys,Fire Protection in Class I Bldgs & Core Internals Earthquake Design Criteria ML19206A2011969-05-0707 May 1969 Amend 9 Changing Organizational Structure & Placing Full Responsibility for Engineering,Design,Const,Operation & Maint of TMI-2 on Util ML19220B6131969-05-0202 May 1969 Amend 9 Re Organizational Changes to Project,Placing Full Responsibility for Engineering,Design,Const,Operation & Maint of TMI on Metropolitan Edison ML19206A1931969-04-16016 April 1969 Amend 8 Correcting FSAR & Adding Supplementary Info Re Containment Integrity Proof Tests,Quality Control Functions, Flywheel Problem Identification & 1968 Financial Repts ML19220B4111969-03-13013 March 1969 Amend 7 Correcting PSAR & Adding Suppl 6 W/Info Re Plant Primary Sys & Proposed Method for Assuring That Unexpected Gross Deterioration Has Not Occurred ML19206A2521969-03-11011 March 1969 Amend 7 Correcting PSAR Suppl Info Re Surveillance of Primary Sys & Proposed Method to Assure No Gross Deterioration of Prestressing Sys Occurred ML19220C0011969-03-10010 March 1969 Amend 6 to Application for CP & OL ML19220B2141968-11-26026 November 1968 Amend 5 Adding Suffix a to Second Set of Questions to Differentiate Them from First Set.W/O Encl ML19220A4681968-11-26026 November 1968 Amends Answering Questions in AEC That Were Not Answered by Amend 4 ML19206A2261968-10-30030 October 1968 Amend 4 to CP Application Changing Control Rod Drive Mechanism,Adding Emergency Plan,Geological Info & Changing Containment Ventillation & Cooling Sys ML19206A1231968-09-0303 September 1968 Amend 3 to CP Application Supplementing Info Re Probable Max Hurricane Flood Height.Certificate of Svc Encl ML19206A1281968-06-26026 June 1968 Amend 2 Revising Pages for PSAR Section 5 & Furnishing Addl Info Re Grouted Tendons for Prestressing of Containment Structure ML19220A4581968-05-22022 May 1968 Amend 1 to Application for Cp.Restates Initial & Ultimate Thermal Power Levels in Terms of Reactor Power Level ML19220C0501968-04-22022 April 1968 Application for CP & OL ML19319E1611968-01-26026 January 1968 Amend 1 to CP Application,Updating Util PSAR to Conform W/Met Eds PSAR 1978-05-19
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212F8231999-09-23023 September 1999 Corrected TS Page 4-45 for Amend 215 to License DPR-50. Revised Pages Corrects Error Contained in 990729 Suppl to 990202 Application ML20211D1321999-08-20020 August 1999 Application for Amend to License DPR-50 to Revise TS Bases Re Degraded Undervoltage Relay Setpoint Calibration Frequency & Degraded Voltage Relay Tolerance Rev ML20211B1751999-08-19019 August 1999 Amend 214 to License DPR-50,revising TMI-1 TS Figure 2.1-1 & Figure 2.1-3 to Reflect Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of TMI-1 Facility with Average of 20 Percent of SG Tubes Plugged ML20210J0941999-07-29029 July 1999 Suppl TS Change Request 274 to License DPR-50,revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance Tss,As Result of NRC Generic Concerns Re CR Habitability Issues ML20209D6651999-07-0808 July 1999 Corrected TS Pages 3-21,4-5a,4-9,4-38 & 6-3 to Amends 211 & 212 to License DPR-50.Pages Failed to Reflect Previously Approved Changes Granted in Amends 203 & 204 in Case of Amend 211 & 207 in Case of Amend 212 ML20196K5901999-06-29029 June 1999 LAR 285 for License DPR-50,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls Can Continue to Be Moved ML20209C0551999-06-29029 June 1999 LAR 77 for License DPR-73,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matl May Continue to Be Moved ML20212H8991999-06-21021 June 1999 Amend 212 to License DPR-50,incorporating Changes to More Accurately Reflect Current Plant Design,Adopting Changes in SRs Consistent with Std Ts,Identifying Changes to Plant Sys & Revs to TS Sys Descriptions Not Involving LCOs ML20195E3341999-06-0404 June 1999 TS Change Request 265 to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20209B5891999-05-26026 May 1999 LAR 281 to License DPR-50,revising TMI-1 UFSAR Chapters 5 & 14 to Permit Use of Conservative Deterministic Failure Margin Methodology for Seismic Analysis of Portions of Auxiliary Steam Line.Rept 240046-R-001 Encl.Rept Withheld ML20206R1111999-05-13013 May 1999 Application for Amend to License DPR-50,requesting That License Sections 2.a.(3) & 2.c.(7) & TS Section 3.1.1 Be Revised to Incorporate Administrative Updating & Changes to Bases Statement ML20205Q6061999-04-15015 April 1999 Amend 210 to License DPR-50,approving Rev to TMI-1 UFSAR for Use of Revised Atmospheric Dispersion Factors by Determining Chapter 14 Postulated Accident Analysis Radiological Dose Consequences at TS 5.1.1 Defined Exclusion Area Boundary ML20205Q5931999-04-13013 April 1999 Amend 209 to License DPR-50,approving Requested Surveillance TSs Related to Once Through Steam Generator Inservice Insps to Be Completed During 13R Refueling Outage in Fall 1999 ML20205H0691999-04-0101 April 1999 TS Change Request 262 to License DPR-50,revising TS by Adding LCO Action Statements & Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0421999-02-0202 February 1999 TS Change Request 274 to License DPR-50,expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems ML20196G4401998-12-0303 December 1998 LAR 278 to License DPR-50,requesting Consent to Transfer & Authorize Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License.Supporting Documentation,Encl ML20196H9751998-12-0303 December 1998 LAR 279 to License DPR-50,reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G7671998-11-25025 November 1998 TS Change Request 277 to License DPR-50,changing Surveillance Specs for OTSG ISIs for TMI-1 Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only ML20195C6811998-11-12012 November 1998 Amend 52 to License DPR-73,relocating Audit Frequency Requirements from TMI-2 to TMI-2 Post Defueling Monitored Storage QA Plan & Extends Max Allowed Interval Between Certain Audits from 12 Months to 24 Months ML20154Q6201998-10-19019 October 1998 TS Change Request 248 to License DPR-50,adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18, Remote Shutdown Sys ML20154P8441998-10-19019 October 1998 Application for Amend to License DPR-50,providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage.Proprietary & non- Proprietary Calculation,Encl.Proprietary Info Withheld ML20154M3691998-10-15015 October 1998 Application for Amend to License Amend Request 276 to License DPR-50 Revising UFSAR Chapter 14 Accident Analysis Atmospheric Dispersion Factors.Ufsar Revised Pages Encl ML20154F8401998-10-0505 October 1998 Amend 208 to License DPR-50,revising TS 3.1.2 of TMI-1 TS to Incorporate New P/T Limits for Rv Pressurization Heatup, Cooldown & Inservice Leak & Hydrostatic Test,To Be Effective for Period of 17.7 EFPYs ML20249B2391998-06-11011 June 1998 TS Change Request 273 to License DPR-50,incorporating Alternate High Radiation Area Control Consistent W/Reg Guide 8.38 ML20217K4761998-04-24024 April 1998 Amend 207 to License DPR-50,revises FOL & TSs in Response to Application & Suppl on 970911 & 980325,to Reflect Change in Legal Name of Operator of TMI-1 from Gpu Nuclear Corp to Gpu Nuclear,Inc ML20217E5131998-03-23023 March 1998 Application for Amend to License DPR-50,revising TS Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 Efpy.Request Also Submitted in Response to NRC ML20198K2181997-10-16016 October 1997 Amend 206 to License DPR-50,changing TSs That Authorize Use of Alternate Tube Repair Criteria for once-through SG ISI for Cycle 12 ML20217G0161997-10-0303 October 1997 Suppl to License Amend Request 268 to License DPR-50, Replacing Pages 4-80 & 4-81 Previously Submitted w/TMI-1 License Amend Request 268 on 970812 ML20211G8501997-10-0202 October 1997 Amend 204 to License DPR-50,revising TMI-I Which Decreases Max Allowable Dose Equivalent I-131 Limit in Reactor Primary Coolant from 1.0 Uci/Gm to 0.35 Uci/Gm ML20211C3211997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re License Amend Request 269 Submitted on 970814.Suppl Includes Addl Change to TS Section 3.1.4 & Proposed Page Rev Clarifying That UFSAR Analysis Is More Conservative ML20211C2221997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re TS Change Request 266.Supplement Provides for Phased Review & Issuance of License Amends & Involves Administrative Correction to TS Decay Heat Removal Sys Leakage Rate ML20217Q7281997-08-27027 August 1997 Amend 203 to License DPR-50,reduces Required Volume of Borated Water in Each Core Flood Tank from 1,040 Ft to 940 Ft ML20210J9951997-08-14014 August 1997 Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J3981997-08-12012 August 1997 Tech Spec Change Request 268 for License DPR-50,revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operations ML20217K6851997-08-12012 August 1997 Amend 202 to License DPR-50,incorporating Into TMI-1 TS NRC Approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20198E7871997-07-30030 July 1997 TS Change Request 266 to License DPR-50,incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 ML20141L9521997-05-27027 May 1997 Amend 201 to License DPR-50,revising Plant TS to Premit Use of 10CFR50,App J,Option B,performance-based Containment Leakage Rate Testing ML20141E1311997-05-0808 May 1997 Application for Amend to License DPR-50,consisting of Change Request 264,incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2351997-04-21021 April 1997 Application for Amend to License DPR-50,requesting Rev to TS 3.3 Re Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Systems ML20134M1111997-02-0707 February 1997 Application for Amend to License DPR-50,incorporating Certain Improvements from Revised STS for B&W Plants, NUREG-1430 & Addl Changes as Described in Encl TS ML20133D2651996-12-24024 December 1996 Application for Amend to License DPR-50,requesting Reinstatement of Auxiliary & Fuel Handling Bldg Ventilation Sys TS ML20132F3221996-12-16016 December 1996 Application for Amend to License DPR-50,consisting of Change Request 260,reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135C5201996-12-0202 December 1996 TS Change Request (Tscr) 75 to License DPR-73,relocating Audit Frequency Requirements to Pdms QA Plan ML20134D7761996-10-24024 October 1996 Amend 51 to License DPR-73,revising TS to Extend Surveillance Interval for Demonstrating Operability of Containment Airlock ML20128K1831996-10-0808 October 1996 Amend 50 to License DPR-73,revising TS to Incorporate Improvement from Administrative Controls Section of Revised STS for B&W Plants ML20117H0181996-08-29029 August 1996 Application for Amend to License DPR-50,consisting of TS Change Request 257,incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1901996-06-28028 June 1996 Application for Amend to License DPR-50,consisting of Change Request 259,allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8751996-05-24024 May 1996 Errata to Application for Amend to License DPR-50,consisting of TS Change Request 243,replacing Pages for App a ML20101R1361996-04-10010 April 1996 Application for Amend to License DPR-50,consisting of Change Request 243,revising Addl Group of Surveillances in Which Justification Has Been Completed Following Receipt of 930623 Application ML20101F3141996-03-21021 March 1996 Amend 200 to License DPR-50,revising TS to Incorporate Several Improvements from Revised STS for Plant 1999-09-23
[Table view] |