ML18230B478

From kanterella
Revision as of 13:16, 16 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
4 Environmental Report, Figure 3.11-11, Harris Richmond: Area Under Study for Proposed Line Route
ML18230B478
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/18/2018
From:
Carolina Power & Light Co
To:
US Atomic Energy Commission (AEC)
References
Download: ML18230B478 (1)


Text

cQ NARROW CORRIDORS INDI CA TE EXISTING LINES TO BE REBUILT WIDE CORRIDORS INDICATE AREAS UNDER STUDY FOR NEIrv LINE SECTIONS SCALE: R INCH=I MILE 0 I 2 3 4 0 re O t frs, s,e'f.5/0'I~Et 0 700'00'+r-';4~'I 0/0 0 I 4 r Oe Ie ee rtx err 0 5-rer 535&p p (Q r I@~Jv 0'0 Je 0 e/0 0 Cr r 0/ffnle vf Q 5 ts ,et~t), Sf 0!0 tree HM ON Orre COT LA/55, o(e 0 I.,sts p'2/P e I 5 Lr'st-t(l't,':b 0/I>>-r 50 tr (se g Sr I e p II.pe'.~pt s tJ I oe't I A I/r 0't t Y s 5!p,i,'l I r;r ttL 5't Itr r'.5 t (//r't+~<<r'es 5-ree sss er J 00 ref gJ,rf t rf I I/r f 0 ri/I ,rle 0)r r (5'e 5/LII/'j/i i ep'Cg i I C CAROLINA POWER a LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1,2,38t4 Environmental Report HARRIS-RICHMOND:

AREA UNDER STUDY FOR PROPOSED LINE ROUTE 3.11-11