ML11161A148
ML11161A148 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 06/10/2011 |
From: | Robert Daley Engineering Branch 3 |
To: | Pacilio M Exelon Nuclear Generation Corp, Exelon Nuclear |
Loretta Sellers | |
References | |
IR-11-008 | |
Download: ML11161A148 (8) | |
See also: IR 05000456/2011008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532
-4352 June 10, 2011
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: BR AIDWOOD STATION, UNITS
1 AND 2 - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59
(MOD/50.59) BASELINE
INSPECTION
05000 456/201 1008; 05000 457/201 1008 Dear Mr. Pacilio
- On September 12, 2011
, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59 baseline inspection at the Braidwood Station, Units
1 and 2. This inspection
wi ll be performed in accordance
with the NRC baseline Inspection Procedure
(IP) 71111.17. The onsite portion of the inspection will take place on September 12
- 16 and September 26 - 30, 2011. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request
for documents needed for the inspection. These documents have been divided into three groups.
The first group
of information
is necessary to ensure that the inspection team
is adequately prepared for the
inspection. This information should be made available via compact disc
and delivered to the regional office no later than July 15, 2011. The inspection team will review this information by July 29, 2011 , and will request
specific items that should be provided for review in the regional office by August 26, 2011
. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within this group, i.e., Item (1), will be requested for review in the regiona
l office prior to the inspection
by August 26, 2011, as identified above.
The remaining documents should be available by the first day of the onsite inspection, September 12, 2011. The third group lists information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. The remaining documents in group three should be available by the first day
of onsite inspection, September 12, 2011. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
M. Pacilio
-2- The lead inspector for this inspection is Dariusz Szwarc. We understand that our regulatory contact for this inspection is Mr. Ja mes Gerrity of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA by R. A. Langstaff For/
Robert C. Daley, Chief Engineering Branch 3
Division of Reactor Safety
Docket Nos.
50-456; 50-457 License Nos.
Modification and 50.59 Inspection Document Request
cc w/encl:
Distribution via ListServ
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
Enclosure 1 Inspection Report
- 05000456/201 1 008; 05000 457/20 1 1 008 Inspection Dates
- September 12
- 16 and September 26
- 30, 2011 Inspection Procedure
- IP 71111.17 , "Evaluation
s of Changes, Tests, or Experiments and Permanent Plant Modifications
" Lead Inspector(630) 829-9803 : Dariusz Szwarc
Dariusz.Szwarc@nrc.gov
I. Information Requested for
i n-Office Preparation Week
The following information is requested by
July 15, 2011, or sooner, to facilitate the selection of
specific items that will be reviewed during the onsite inspection week. The inspection team will select
specific items from the information requested below and submit a list to your staff by
July 29, 2011. We will request that certain items be made available to the regional office prior to the inspection by
August 26, 2011. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should identify the associated system
and cover the time frame from the receipt of information for the last inspection
on February 23, 2007
, to the present.
The required information identified below should be provided on compact disc (CD).
Please provide three copies of
each CD submitted (i.e., one for each inspector). The preferred file format is a searchable "pdf" file. The CDs should be indexed and hyper
-linked to facilitate ease of use, if possible.
If you have any questions regarding this information, please call
the inspection team leader as soon as possible.
1. List of "permanent plant modifications" to systems, structures, or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.) The list should contain the number of each document, the title, the revision
(or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.
2. List of all 10
CFR 50.59 completed evaluations involving (a)
calculations, (b) procedure revisions, (c)
changes to the facility (modifications), (d)
non-routine operating configurations, or (e)
departures in methods of analyses. This list should include 50.59
evaluations for the following:
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
Enclosure 2 a. Changes that have been made under the provisions of 10
CFR 50.59 that have been updated in accordance with 10
CFR 50.71(e)(4) since February 23, 2007
- b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.
3. A list of all 10
CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c)
changes to
the facility (modifications); (d)
non-routine operating configurations; or (e) departures in methods of analyses.
The list should contain the number and title of each document, a brief descriptio
n
of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
4. A list of any modifications, procedure revisions, or UFSAR changes where it was determined that 10
CFR 50.59 did not apply.
5. A list of calculation changes that have been issued for use.
6. A list of corrective action documents (open and closed) that address permanent
plant modifications or 10 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
7. Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post
-modification testing, 10
CFR 50.59 evaluation
s and screenings, and UFSAR updates.
8. UFSAR updates submitted in accordance with 10
CFR 50.71(e)(4). Provide copies of the complete submittal.
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
Enclosure 3 9. Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last 10
CFR 50.71(e)(4) submittal.
10. Electronic copy of the UFSAR
and technical specificati
ons, if available.
11. Name(s) and phone numbers for the regulatory and technical contacts.
12. Current management and engineering organizational chart.
II. Information Requested to be Available Prior to Inspection (Request will be made by July 29, 2011
for availability of documents by August 26, 2011) or on First Day of Inspection (September 12, 2011
) 1. Copies of all selected items from Section I. This includes copies 2. Copies of these documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access to them.
of associated
documents such as calculations, post
-modification test packages, 10 CFR 50.59 evaluations, or screenings, and any corrective action documents.
a. Updated Final Safety Analysis Report, if not previously provided
- b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided
- g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The latest 10 CFR 50.59 UFSAR Update Submittal.
3. Please ensure that other supporting documents for the selected items
have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59
evaluation.
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
Enclosure 4 4. Assessment and Corrective Actions:
a. The most recent MOD/50.59 Quality Assurance
(QA) audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 Quality Assurance (QA) audit and/or self
-assessment.
III. Information Requested to be provided throughout the inspection
1. Copies of any corrective action documents generated as a result of the
inspection
team's questions or queries during this inspection.
2. Copies of the list of questions submitted by the inspection team member
s and the status/resolution of the information requested (provide daily
during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team leader.
M. Pacilio -2- The lead inspector for this inspection is Dariusz Szwarc. We understand that our regulatory contact for this inspection is Mr. James Gerrity of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9803 or via e
-mail at Dariusz.Szwarc@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA by R. A. Langstaff For/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos.
50-456; 50-457 License Nos.
Modification and 50.59 Inspection Document Request
cc w/encl:
Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress
\Ltr 061011 Braidwood Mod50 59 RFI DXS.docx
Available -Publicly Available
-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII NAME DSzwarc RDaley DATE 06/10/11 06/10/11 OFFICIAL RECORD COPY
Letter to Mr. Michael J. Pacilio from Mr. Robert C. Daley
dated June 10, 2011. SUBJECT: BR AIDWOOD STATION, UNITS
1 AND 2 - INFORMATION REQUEST FOR AN NRC TRIENNIAL
PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000 456/201 1008; 05000 457/201 1008 DISTRIBUTIONRidsNrrDorlLpl3
-2 Resource
RidsNrrPMBraidwood Resource
RidsNrrDirsIrib Resour
ce Cynthia Pederson
DRPIII DRSIII Carole Ariano
Patricia Buckley
ROPreports Resource