Notification of NRC Retake Operator Licensing Examination Approval 05000528/2018302; 05000529/2018302; 05000530/2018302
ML18200A170
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/18/2018
From: Vincent Gaddy
NRC Region 4
To: Bement R
Arizona Public Service Co
References
IR 2018302
Download: ML18200A170 (3)


See also: IR 05000528/2018302

Text

July 18, 2018

Mr. Robert S. Bement

Executive Vice President Nuclear/

Chief Nuclear Officer

Arizona Public Service Company

P.O. Box 52034, MS 7602

Phoenix, AZ 85072

-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION APPROVAL 05000528/2018 302; 05000529/2018 302; 05000530/2018 302

Dear Mr. Bement: In a telephone conversation

on July 11, 2018, between John Rodgers, Senior Operations Training Instructor, and Daniel Bacon , Chief Examiner, arrangements were made for the administration of a retake licensing examination at

Palo Verde Nuclear Generating Station, Units 1, 2, and 3

during the week

of September 24, 2018.

As agreed during the telephone conversation, your staff

will prepare the retake examination

(operating examination for two senior reactor operator applicants)

based on the guidelines in

NUR EG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.

The NRC's regional office will discuss with your staff any changes that might be necessary before the examination

is administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating examination

outline by July 27, 2018

. The operating examination and supporting reference

materials identified in Attachment 3 to ES-201 will be due by August 17, 2018. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline

and examination

before they are submitted to the NRC for review and approval. All materials shall be complete

and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination

and reference materials, or the submittal of inadequate or incomplete materials, may cause the examination

to be rescheduled.

In order to conduct the requested operating examination, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-302. In addition, Appendix E to NUREG

-1021 contains a number of NRC policies and guidelines that will be

in effect while the written examination

is being administered.

UNITED STATES NUCLEAR REGULATORY

COMMISSION

REGION IV 1600 EAST LAMAR BOULEVARD

ARLINGTON, TEXAS 76011-4511

R. Bement 2 To permit timely NRC review and evaluation, your staff should submit

signed applications certifying that all training has been completed

by September 10, 2018. If the final signed applications are not received by that date, a postponement may be necessary. This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018 , which expires on June 30, 2019. The public reporting burden for

this collection of information is estimated to average

50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including

the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T

-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555

-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with Title 10 of the Code of Federal Regulations

(CFR) 2.390 of the NRC's

"Agency Rules of Practice

and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading

-rm/adams.html

. Thank you for your cooperation in this matter.

Mr. Rodgers has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Daniel Bacon

at 404-997-4518, or myself at 817

-200-1 159. Sincerely, /RA/ Vince nt G. Gaddy, Chief Operations Branch

Division of Reactor Safety

Docket Nos.

50-528, 50-529, and 50

-530 License Nos.

NPF-41, NPF-51, and NPF

-74

ML18200A170 SUNSI Review:

ADAMS: Non-Publicly Available

Non-Sensitive Keyword: By: VGaddy Yes No Publicly Available

Sensitive

RGN-002 OFFICE OE:OB SOE:OB C:OB NAME MDoyle DBacon VGaddy SIGNATURE /RA/ /RA by email/ /RA/ DATE 07/17/18 07/1 7/1 8 07/18/18