TSTF-09-28, Technical Specifications Task Force (Tstf), Updated TSTF Membership and Distribution

From kanterella
Revision as of 15:23, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Technical Specifications Task Force (Tstf), Updated TSTF Membership and Distribution
ML093560423
Person / Time
Site: Technical Specifications Task Force
Issue date: 12/22/2009
From: Croft W, Gregoire D, Raidy T, Schrader K
Babcock & Wilcox, BWR Owners Group, PWR Owners Group, Technical Specifications Task Force
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TSTF-09-28
Download: ML093560423 (3)


Text

11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Administration by EXCEL Services Corporation TECHNICAL SPECIFICATIONS TASK FORCE A JOINT OWNERS GROUP ACTIVIT Y TSTF December 22, 2009 TSTF-09-28 PROJ0753

U. S. Nuclear Regulatory Commission Attn: Document Control Desk

Washington, DC 20555-0001

SUBJECT:

Updated TSTF Membership and Distribution

Dear Sir or Madam:

The Technical Specifications Task Force (TSTF) would like to inform the NRC of changes to the TSTF membership and provide an updated distribution list. As of December 1, the TSTF membership is: Kenneth Schrader Representing Westinghous e NSSS plants and the Pressurized Water Reactor Owners Group (PWROG). Mr. Schrader is the Chairman of the PWROG Licensing Subcommittee. Donald Gregoire Representing boiling water reactors and the Boiling Water Reactors Owners' Group (BWROG). Mr. Gregoire is the Chairman of the BWROG Technical Specification Issues Coordination Committee (TSICC). Wendy Croft Representing Babcock & Wilcox NSSS plants and the PWROG. Thomas Raidy Representing Combustion Engineering NSSS plants and the PWROG. Brian Mann Technical coordinator for the TSTF and a non-voting member. Mr. Mann is a vice president of Excel Services Corporation.

The updated distributi on list is attached.

TSTF 09-28 December 22, 2009 Page 2 Should you have any questions, please do not hesitate to contact us.

Kenneth J. Schrader (PWROG/W) Donald W. Gregoire (BWROG)

Thomas W. Raidy (PWROG/CE) Wendy E. Croft (PWROG/B&W)

Enclosure

cc: Robert Elliott, Technical Specifications Branch, NRC Michelle Honcharik, Special Projects Branch, NRC

Technical Specifications Task Fo rce (TSTF) Distribution List Effective December 1, 2009 Technical Specifications Task Force 11921 Rockville Pike

Suite 100 Attention: Donald Hoffman

Rockville, MD 20852

Telephone: 301-984-4400 E-mail: donaldh@excelservices.com

Kenneth Schrader

Diablo Canyon Power Plant

Building 104/5/21A

P.O. Box 56 Avila Beach, CA 93424

Telephone: 805-545-4328 E-mail: kjse@pge.com

Donald W. Gregoire

Energy Northwest Columbia Generating Station Mail Drop PE20

PO Box 968

Richland, WA 99352-0968

Telephone: 509-377-8616 E-mail: dwgregoire@energy-northwest.com Thomas Raidy Southern California Edison Mail Stop D-3-E P.O. Box 128 San Clemente, CA 92672

Telephone: 949-368-7582 E-mail: Tom.Raidy@sce.com Wendy E. Croft Exelon Nuclear

200 Exelon Way, Suite 340

Kennett Square, PA 19348

Telephone: 610-765-5726 E-mail: Wendi.Croft@exeloncorp.com Brian Mann EXCEL Services Corporation 11921 Rockville Pike, Suite 100

Rockville, MD 20852

Telephone: 301-984-4400 E-mail: brianm@excelservices.com