RA-11-006, Onsite Property Insurance Coverage

From kanterella
Revision as of 22:09, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Onsite Property Insurance Coverage
ML110610398
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  Duke Energy icon.png
Issue date: 02/23/2011
From: Mccabe B
Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-11-006
Download: ML110610398 (2)


Text

Progress Energy 10 CFR 50.54(w)(3)

PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: RA- 11-006 February 23, 2011 ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 ONSITE PROPERTY INSURANCE COVERAGE Ladies and Gentlemen:

Pursuant to 10 CFR 50.54(w)(3) regarding onsite property damage insurance, Carolina Power& Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., (PEC), and Florida Power Corporation (FPC), now doing business as Progress Energy Florida, Inc., (PEF), hereby submit information regarding the present level and source of onsite property damage insurance for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2; the Shearon Harris Nuclear Power Plant, Unit No. 1; the H. B. Robinson Steam Electric Plant, Unit No. 2;and the Crystal River Unit 3 Nuclear Generating Plant. This information is required to be submitted to the United States Nuclear Regulatory Commission by April 1 of each year.Insured Site -Brunswick Company: Policy No.: Limits: Company: Policy No.: Limits: Nuclear Electric Insurance Limited P 10-003 (renewal date April 1, 2011)$500,000,000 (Primary)Nuclear Electric Insurance Limited X10-004 (renewal date April 1, 2011)$750,000,000 (Excess)Insured Site -Crystal River Company: Policy No.: Limits: Company: Policy No.: Limits: Nuclear Electric Insurance Limited P10-081 (renewal date April 1, 2011)$500,000,000 (Primary)Nuclear Electric Insurance Limited X 10-015 (renewal date April 1, 2011)$750,000,000 (Excess)0 cý ýQ CC United States Nuclear Regulatory Commission RA- 11-006 Page 2 Insured Site -Shearon Harris Company: Policy No.: Limits: Company: Policy No.: Limits: Nuclear Electric Insurance Limited P 10-004 (renewal date April 1, 2011)$500,000,000 (Primary)Nuclear Electric Insurance Limited X10-070 (renewal date April 1, 2011)$750,000,000 (Excess)Insured Site -Robinson Company: Policy No.: Limits: Company: Policy No.: Limits: Nuclear Electric Insurance Limited P 10-005 (renewal date April 1, 2011)$500,000,000 (Primary)Nuclear Electric Insurance Limited X10-005 (renewal date April 1, 2011)$750,000,000 (Excess)Insured Sites -Brunswick, Crystal River, Harris, Robinson Company: Policy No.: Limits: Nuclear Electric Insurance Limited BX 10-004 (renewal date April 1, 2011)$1,000,000,000 (Blanket Excess)No new regulatory commitments have been made in this submittal.

If you have additional questions, please call me at (919) 546-4579.Sincerely, Brian McCabe Manager -Nuclear Regulatory Affairs BCM/adz c: V. M. McCree, USNRC Regional Administrator

-Region II F. E. Saba, NRR Project Manager -BSEP, Unit Nos. 1 and 2; CR3 B. L. Mozafari, NRR Project Manager -SHNPP, Unit No. 1; HBRSEP, Unit No. 2 USNRC Resident Inspector

-BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector

-CR3 USNRC Resident Inspector

-SHNPP, Unit No. 1 USNRC Resident Inspector

-HBRSEP, Unit No. 2 E. S. Finley, Jr. -Chairman -North Carolina Utilities Commission R. Vance -North Carolina Utilities Commission S. Watson -North Carolina Utilities Commission W. L. Cox, III -Section Chief, North Carolina Department of Environment and Natural Resources