ML111290772

From kanterella
Revision as of 20:40, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Notification of NRC Initial Operator Licensing Examination 05000528/2012301; 05000529/2012301; 05000530/2012301
ML111290772
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/05/2011
From: Mark Haire
Operations Branch IV
To: Edington R
Arizona Public Service Co
References
05-530/12-301, 50-528/12-301, 50-529/12-301
Download: ML111290772 (4)


See also: IR 05000528/2012301

Text

May 5, 2011

Randall K. Edington, Executive

Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION,, UNITS 1, 2 AND 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000528/2012301; 05000529/2012301; 05000530/2012301

Dear Mr. Edington:

In a telephone conversation on April 20, 2011 between Messrs. Warren Potter and Gabriel Apger, Chief Examiner, arrangements were made for the administration of licensing examinations at Palo Verde Nuclear Generating Station, Units 1, 2 and 3 during the week of March 19, 2012.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will

discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 6, 2012. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by January 20, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of February 13, 2012. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125

Palo Verde Nuclear Generating Station 2

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Palo Verde Nuclear Generating Station 3

Thank you for your cooperation in this matter. Mr. Potter has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Apger at 817-276-6508, or myself at 817-860-

8159.

Sincerely,

/RA/

Mark S. Haire, Chief Operations Branch Division of Reactor Safety

Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74

DISTRIBUTION:

Distribution via ListServ for Palo Verde Nuclear Generating Station

Palo Verde Nuclear Generating Station 4

File located: ML SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GWAPublicly Avail Yes No Sensitive Yes No Sens. Type Initials OE:OB C:OB GApger MSHaire

/RA/ /RA/ 5/5/11 5/5/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax