ML12065A214

From kanterella
Revision as of 03:22, 29 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Final Status Survey Report, Attachment 15, Open Land Areas within Restricted Area and Outside Buffer Area, for the Plum Brook Reactor Facility
ML12065A214
Person / Time
Site: Plum Brook
Issue date: 02/23/2012
From: Kolb P
US National Aeronautics & Space Admin (NASA)
To:
Document Control Desk, NRC/FSME
References
Download: ML12065A214 (3)


Text

National Aeronautics and Space Administration John H. Glenn Research Center 4A Lewis Field Plum Brook Station Sandusky, OH 44870 February 23, 2012 QD Reply to Attn of: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Final Status Survey Report, Attachment 15, Open Land Areas within Restricted Area and Outside Buffer Area, for the Plum Brook Reactor Facility, Licenses Nos.TR-3, Docket No. 50-30 and R-93, Docket No, 50-185 Enclosed for your review is Attachment 15 to the Final Status Survey Report supporting eventual termination of the licenses for the Plum Brook Reactor Facility.The complete Final Status Survey Report will consist of a series of Attachments, each addressing an individual survey area or group of survey areas or environmental areas as described in our NRC approved Final Status Survey Plan. The final submission will be the main body of the Final Status Survey Report which will consolidate and summarize the details presented in the Attachments.

This Attachment addresses the Final Status Survey of the facility's Open Land Areas within Restricted Area and Outside Buffer Area. It supports our conclusion that radiological remediation of the structures and pads has been completed and the areas meet the criteria for unrestricted release specified in 10 CFR 20.1402.Should you have any questions or need additional information, please contact me a NASA Plum Brook Station, 6100 Columbus Avenue, Sandusky, Ohio 44870, or by telephone at (419) 621-3242.N Aec C. Kolb NASA Decommissioning Program Manager5'-' 5A . Plum Brook Reactor Facility Final Status Survey Report, Attachment 15, Open Land Areas within Restricted Area and Outside Buffer Area, revision 0, dated February 23, 2012.cc: USNRC/C. J. Glenn (FSME)USNRC/J. Webb (FSME)USNRC/J. Tapp RIII/DNMS/DB ODH/M. J. Rubadue bcc: Q/Official File