ML17032A155
From kanterella
Revision as of 11:45, 17 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Similar Documents at Vogtle | |
---|---|
Category:Drawing
MONTHYEARML24297A6512024-10-23023 October 2024
[Table view]5 to UFSAR, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Reports, Figures and Graphs ND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ML19312A0542019-11-19019 November 2019 Figure 3.4.16-1 - Reactor Coolant Dose Equivalent I-131 Reactor Coolant Specific Activity Limit Versus Percent of Rated Thermal Power with the Reactor Coolant Specific Activity NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 8 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 8 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 1 of 112016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 1 of 11 NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 112016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 11 NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 112016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 11 NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted ML17032A1552016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 11 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 11 of 11, Redacted NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted2016-11-0202 November 2016 Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted ML16330A4862016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 11 ML16330A4852016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 11 NL-16-2280, Updated Final Safety Analysis Report, Reference Drawings, Part 5 of 11, Redacted2016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 5 of 11, Redacted ML17032A1492016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 8 of 11, Redacted ML17032A1602016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted ML17032A1462016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted ML16330A4842016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 1 of 11 ML17032A1562016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted ML17032A1442016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted ML17032A1572016-11-0202 November 2016 Updated Final Safety Analysis Report, Reference Drawings, Part 11 of 11, Redacted NL-12-0872, Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS)2012-04-30030 April 2012 Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS) NL-12-0371, Provision of Engineering Drawings Is Support of Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System2012-02-23023 February 2012 Provision of Engineering Drawings Is Support of Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System ML1020302752010-07-13013 July 2010 Photograph - Vogtle Sample Results and Diagram ML0733006532007-11-12012 November 2007 Plant Vogtle Landfill #2: Design and Operational Plan ML0732405702007-11-0505 November 2007 Drawing H-993-3, Plant Vogtle New Unit Early Permit Study Savannah River Hydrographic Study - Proposed Discharge Burke County, Georgia. NL-07-0803, Pressurizer Nozzle Full Structural Weld Overlay Nondestructive Examination Results Spring 2007 Outage (2R12)2007-04-13013 April 2007 Pressurizer Nozzle Full Structural Weld Overlay Nondestructive Examination Results Spring 2007 Outage (2R12) ML0732405712006-08-31031 August 2006 Drawing Vogtle, Units 1 and 2, Figure 5.2-4 River Cross Sections at Existing Discharge Location. ML0733006542001-10-19019 October 2001 Plant Vogtle Landfill #3: Design and Operational Plan ML0732405661999-04-0505 April 1999 Map, Traffic Count Map, City of Augusta, Richmond County Georgia. ML0717100871974-03-0404 March 1974 Georgia Power Company Submits Herewith Amendment No. 3 to the Environmental Report for the Alvin W. Vogtle Nuclaer Plant Units 1, 2, 3, 4 2024-10-23 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24297A6482024-10-23023 October 2024
[Table view]5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML23165A2162023-06-13013 June 2023 Enclosure 3: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Revision 11 ML23165A2182023-06-13013 June 2023 Enclosure 8: Vogtle Electric Generating Plant, Units 3 and 4, Technical Requirements Manual (Trm), Revision 20 ML23165A2132023-06-13013 June 2023 Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal ML23165A2152023-06-13013 June 2023 Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12 NL-23-0456, Enclosure 5: Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information. Enclosure 6: Affidavit from Southern N2023-06-13013 June 2023 Enclosure 5: Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information. Enclosure 6: Affidavit from Southern Nuc ND-22-0882, (VEGP) Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2022-11-17017 November 2022 (VEGP) Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ML22326A0592022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 2 of 7) ML22326A0622022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant and Chapter 2, Site Characteristics (Part 1 of 2) ML22326A0632022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 3 of 7) ML22326A1202022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 3 of 3); Chapter 9, Auxiliary Systems; and Chapter 10, Steam and Power Conversion System (Part 1 of 2) ML22326A1172022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 2 of 3) ML22326A1162022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 3 of 3) and Chapter 7, Instrumentation and Controls (Part 1 of 2) ML22326A1142022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (Part 2 of 2); Chapter 11, Chapter 12, Chapter 13, Chapter 14, and Chapter 15 (Part 1 of 2) ML22326A0602022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 4 of 7) ML22326A0642022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Part 2 of 2) and Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 1 of 7) ML22326A1072022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 4, Reactor (Part 2 of 2); Chapter 5, Reactor Coolant System and Connected Systems; and Chapter 6, Engineered Safety Features (Part 1 of 3) ML22326A0662022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 6 of 7) ML22326A1132022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (Part 2 of 2), and Chapter 8, Electric Power (Part 1 of 3) ML22326A0652022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 7 of 7) and Chapter 4, Reactor (Part 1 of 2) ML22326A1212022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 15 (Part 2 of 2), Chapter 16, Chapter 17, Chapter 18, Chapter 19, Table of Contents, Rev 24 Epl ML22326A1192022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 2 of 3) ML22326A0672022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 5 of 7) NL-22-0810, 4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report2022-10-31031 October 2022 4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report ML22179A1202022-06-15015 June 2022 Enclosure 5 List of UFSAR and Tier 1 Figures & Sections Containing Security-Related or Proprietary Information, Enclosure 6 SNC Affidavit, and Enclosure 7 Westinghouse Application for Withholding Proprietary Information & Affidavit ML21179A1182021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components ML21179A1232021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML21179A1032021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML21179A1072021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2 Thru 2.4 ML21179A1102021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML21179A1252021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Nuclear Island Seismic Analyses ML21179A0932021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML21179A1132021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion ML21179A1052021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4B, Groundwater Model Development & Analysis ML21179A1002021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21179A0962021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML21179A1062021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering ML21179A1042021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4A, Observation Well Installation and Development Report ML21179A1122021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 19, Probabilistic Risk Assessment ML21179A1022021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML21179A1112021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operation ML21179A1222021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3H, Auxiliary and Shield Building Critical Sections ML21179A0992021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML21179A1092021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21179A0982021-06-15015 June 2021 Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal ML21179A1172021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A Thru 2.5E ML21179A1152021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering, (Part 1 of 3) ML21179A1082021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML21179A1242021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Thru 3.7 ND-21-0486, 0 to Updated Final Safety Analysis Report, Chapter 4, Reactor2021-06-15015 June 2021 0 to Updated Final Safety Analysis Report, Chapter 4, Reactor 2024-10-23 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17032A155&oldid=176226"