05000250/FIN-2017007-05

From kanterella
Revision as of 22:19, 16 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
05
Site: Turkey Point NextEra Energy icon.png
Report IR 05000250/2017007 Section 1R21
Date counted Sep 30, 2017 (2017Q3)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21M
Inspectors (proximate) T Fanelli
S Bussey
M Riley
N Morgan
M Jones
H Leake
R Bywater
J Bartley
Violation of: 10 CFR 50 Appendix B Criterion XI
INPO aspect
'