RS-13-019, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)

From kanterella
Revision as of 07:52, 22 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML13064A274
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/28/2013
From: Kaegi G
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EA-12-049, RS-13-019
Download: ML13064A274 (62)


Text

References strategies.

References

References

The dates required are obligated or committed dates. Other dates are planned dates subject to change.Updates will be provided in the periodic (six month) status reports.

Provide a general strategies using maintain es) achieve this

None

modifications None how the connection is protected

None None None None

None 1E51-N636A/E 1E12-N662A/C

1E51-N636A/E 1E12-N662A/C

the connection is None None

None

None None None

References

including how the equipment

how the connection is

None

None None None None

ed Plan

References None None

None

including to maintain

None evaluation.

None None None None

Maintenance e ui ment

I YIN