ML13114A746

From kanterella
Revision as of 05:46, 22 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2013 Byron Nuclear Station Initial License Examination Simulator Scenario D-1 Forms
ML13114A746
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/29/2013
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
50-454/13-301, 50-455/13-301
Download: ML13114A746 (3)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: _Byron Nuclear Station Scenario No.: __

1__ Op-Test No.:

_2013301_ Examiners:

_D. McNeil__________________

Operators:

_____________________________

_R. Baker___________________

_____________________________

_B. Palagi_________________

_____________________________

Initial Conditions: __

IC-22____________________________________________________________ _________________________________________________________________________________

_________________________________________________________________________________

Turnover: Unit 1 is at 100% power, steady state, equilibrium xenon, MOL. Unit output is 1230 MW.

___ Boron concentration is 888 ppm. Online risk is green. A TV/GV surveillance is scheduled to be

___ performed. The unit will be ramped to 89% power at 3MW/min for the surveillance._______________

Event No. Malf. No. Event Type*

Event Description Preload IMF RP26C IMF RP28C Trgset 4 "zdi1fw012c(1).gt.0" Trg 4 "dor zlo1fw012c1" Trgset 5 "fwv1fw012c.gt.0.9" Trg 5 "ior zlo1fw012c1 off" ESF relay failure of 1A RH pump ESF relay failure of 1B RH pump 1 R (RO) (SRO)

N (BOP, SRO)

Ramp down for TV/GV Surveillance 2 IMF PA0253 ON IOR ZDI1MS018A CLS TS (SRO) S/G PORV 1MS018A Inop 3 IMF FW16 0 I (BOP, SRO) 1PT508 fails low 4 IMF CV10 200 180 134 C (RO, SRO) 1CV121 slowly fails open. Manual control is available.

5 IMF RX10A 0 30 I (RO, SRO)

TS (SRO) 1PT 505 fails low 6 ED11D TS (SRO) Loss of IB 114 due to a bus fault. Tech Spec 3.8.9 required shutdown within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 7 Ramp fwv1FW012C 1 1 08:00:00 C (BOP, SRO) 1FW012C recirc fails open 8 MF TH04C 540000 M (all) LB LOCA terminating in transfer to Cold Leg Recic 9 Pre-load C (all) ESF relay failure of 1A & B RH pumps

- manual start required

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: _Byron Nuclear Station Scenario No.: __

2__ Op-Test No.:

_2013301_ Examiners:

_D. McNeil__________________

Operators:

_____________________________

_R. Baker___________________

_____________________________

_B. Palagi__________________

_____________________________

Initial Conditions: __

IC-22, 75% power, steady state, MOL___________________________________ _________________________________________________________________________________

_________________________________________________________________________________

Turnover: Unit 1 is at 76% power, steady state, MOL, CB D is @ 141 steps and boron concentration is 998 ppm..

Online risk is green. Crew is to switch Bus 156 from SAT to UAT following ACB 1561 ____ maintenance. 1D CD/CB pump is OOS for maintenance.

.____________________________________

Event No. Malf. No. Event Type*

Event Description Preload ZDI 1CD05PD PTL ZLO1CB113DOPN OFF ZLO1CB113DCLS OFF ZDI1CB113D CLS ZDI1CD05PDB PTL IMF RP02A IMF RP02B IMF TC03 ZDIHSTG010 NORM Turbine fails to AUTO trip from Rx trip Manual Turbine trip PB fails to trip turbine 1 N (BOP,SRO)

Switch Bus 156 Electrical Lineup 2 None TS (SRO) Notified that SI pump failed ASME surveillance 3 IMF FW22C C (BOP,SRO)

R (RO, SRO) 1C CD/CB pp Trip requiring entry to 1BOA SEC-1 and Turbine Runback 4 MF RX18A 630 I (RO, SRO) TS (SRO) 1A TCOLD RTD Fail High 5 IMF RX04D 0 30 I (BOP,SRO)

Feedwater flow channel 1FT

-521 fails Low 6 MF CV16 0 I (RO, SRO)

VCT Level Channel LT

-112 Fail Low 7 MF CH08 60 120 TS (SRO) CNMT Pressure 1PT

-936 Fail High 8 MF TH16C M (ALL) ATWS 1C RCP Trip with Rx Trip Breakers Fail To Open 9 Pre-load C (ALL) Failure of Main Turbine to Trip on auto signal or manual push button

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: _Byron Nuclear Station Scenario No.: __

3__ Op-Test No.:

_2013301_ Examiners:

_D. McNeil__________________

Operators:

_____________________________

_R. Baker___________________

_____________________________

_B. Palagi__________________

_____________________________

Initial Conditions: __

IC-16 , 56% power, steady state, equilibrium xenon, BOL____________________ _________________________________________________________________________________

_________________________________________________________________________________

Turnover: Unit 1 is at 56% power, steady state, equilibrium xenon, BOL CB D is at XXX steps and boron concentration is 998 ppm. Preconditioned to 100% power at 6400 EFPH. Online risk is yellow. 1A CS pp is O.O.S. for a motor lube oil change and is scheduled to be released at the end of shift. It is expected that Power Team will call for the unit to be ramped to 880 MWe at 0.2MW/min.____________________ Event No. Malf. No. Event Type*

Event Description Preload IOR ZDI1CS01PB PTL IRF CS05 OVER IMF CH01B IMF CH01C Preload 1A CS pp O.O.S.

Prevents 1B CS pp from Auto start 1B RCFC fails to start in Lo Speed 1C RCFC fails to start in Lo Speed 1 None (from 10 5 cert) N (BOP, SRO)

R (RO, SRO)

Ramp unit up 2 IMF RD13AK08 TS (SRO) DRPI failure (1 rod) in CB A for 1 train 3 MF CV07A 80 60 C (RO, SRO)

RCP Seal Injection Filter Clogged 4 MF RX13A 100 I (RO, SRO) TS (SRO) Pzr LT-459A Fail High (controlling channel) 5 IMF FW02A C (BOP, SRO

) 1B TDFP Trip with 1A MFP available for manual start 6 IMF RX01K 0

-(from 10-1-1 cert) I (BOP, SRO) TS (SRO) Steam Generator 1D controlling Steam Pressure channel fails low requiring Manual control of 1D SG Main Feed Reg Valve. Enter Tech Spec 3.3.2 for actions.

7 MF MS07D 4 240 M (ALL) 1D Steam Line Break inside CNMT 8 (Preloaded)

MF CS01A RF CS05 OVER IMF CH01B IMF CH01C C (SRO, CREW) CS Pumps Auto Start Failure, Manual Start required; 1A CS pump fail to start.

1B RCFC fails to start in Lo Speed 1C RCFC fails to start in Lo Speed

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor