2012 Byron Station Initial License Examination Proposed Job Performance Measures
ML12053A244
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/10/2012
From: Bielby M
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML11354A069 List:
References
Download: ML12053A244 (197)


Text

Exelon Nuclear Job Performance Measure Calculate a Reactivity Change JPM Number: RA 1a Revision Number: 01 Date: 10/17/2011 Developed By: Bill Hochstetter 10/17/2011 Instructor Date Validated By: Brain Lewin 11/6/2011 SME or Instructor Date Approved By: Rob Lawlor 11/6/2011 Facility Representative Date

RA 1a - rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AP-300-1004 Rev: 2 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

RA 1a - rev 01 Revision Record (Summary)

Revision 01 Initial revision of JPM Comment Resolution Revised JPM for 2012 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

RA 1a - rev 01 INITIAL CONDITIONS:

1. Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps.
2. Tave is 1 degree less than Tref.

INITIATING CUES:

1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
2. The US has directed you to calculate a reactivity change, utilizing OP-AP-300-1004, that will allow rod withdrawal and match Tave to Tref keeping turbine load constant.
  • Provide blank copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
  • Provide copy of Unit 1 Rema Thumbrules Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2 & 3 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TASK STANDARDS:

1. Evaluate the reactivity change to match Tave to Tref
2. Calculate the Reactivity Change Determination Form.

MATERIALS:

  • Blank copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
  • Unit 1 Rema Thumbrules at 6211 EFPH SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

RA 1a - rev 01 RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT#

CUE Provide copy of OP-AP-300-1004 and a copy of the Unit 1 Rema thumbrules 1 Refer to In accordance with the provided: ___ ___ ___

  • OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Boration and Dilution Requirements Requirements
  • Unit 1 Rema Thumbrules
  • Unit 1 Rema Thumbrules
  • 2 Compute Attachment 1 of OP-AP-
  • Station: Byron Unit: 1 ___ ___ ___

300-1004

  • Date and time
  • Desired change
  • Withdraw Rods 6 steps for PDMA02 control
  • Raise RCS temp. 1 degree
  • Reason for change (per QNE recommendation)
  • PDMA02 control
  • Temperature control
  • What is the method & amt for the reactivity change?
  • 6 steps withdrawal of CB D
  • 224 gallons dilution per 1 degree F change
  • Inputs
  • Rema thumbrules CUE The correctly calculated numbers are listed below.
  • 3 Evaluate calculation
  • Calculation of change (Uses numbers as calculated above)
  • 6 steps of Control Bank D at 100% power: Tave-Tref = 1/2° rise in temperature
  • -1° + 0.5° (mismatch after rod movement) = -

0.5°

  • 224 gallons PW/1° x .5° =

112 gallons dilution CUE This JPM is complete.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

RA 1a - rev 01 RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

RA 1a - rev 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Evaluate a Reactivity Change JPM Number: RA-1a Revision Number: 00 Task Number and

Title:

S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.3/4.6 Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • Unit 2 Rema Thumbrules Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes Critical Steps: 2 and 3 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

RA 1a - rev 01 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1 Unit 1 is at 95% power, 6200 EFPH, 892 ppm boron, with CB D at 215 steps.

2 Tave is 1 degree less than Tref.

INITIATING CUES:

1. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.

2 The US has directed you to calculate a reactivity change, utilizing OP-AP-300-1004, that will allow rod withdrawal and match Tave to Tref keeping turbine load constant.

Exelon Nuclear Job Performance Measure Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS)

JPM Number: RA-1.b Revision Number: 11 Date: 10/21/2011 Revised By: Bill Hochstetter 10/21/2011 Instructor Date Validated By: Brain Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 11

RA-1.b - rev 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOSR 8.1.1-1 Rev: 009 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 11

RA-1.b - rev 11 Revision Record (Summary)

Revision 11 Revised to current format SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11

RA-1.b - rev 11 SIMULATOR SETUP INSTRUCTIONS

1) Reset to IC-21 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2) When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
3) This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11

RA-1.b - rev 11 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 is in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11

RA-1.b - rev 11 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee with a copy of 1BOSR 8.1.1-1 to complete

1. Circle status of offsite power At 0PM03J, OBSERVE bus sources. alive lights, line amps, and MWs for all 345 KV lines:

° Line 0621 Note: The bus alive light alone is Line 0627

° NOT adequate verification

° Line 0624 of bus status.

° Line 0622

° CIRCLE energized for all 345 KV lines INDICATE:

2. Indicate status of disconnects, breakers and SAT links
  • Open disconnects, breakers and removed SAT links Cue: All line, MPT and SAT using O disconnects indicate closed
  • Closed disconnects, breakers and installed SAT Cue: MPT ground disconnect links using X indicates open Cue: Both units SAT x-tie links are REMOVED Cue: Both units SAT disconnect links are INSTALLED
3. Trace path along dashed lines TRACE path correctly on data from any energized offsite power sheet:

source to the unit ONE SAT

  • Line energized, breakers banks and disconnects closed
4. Trace second path from second TRACE SECOND path independent power source to unit correctly on data sheet:

TWO SAT bank.

  • Line energized, breakers and disconnects closed SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 11

RA-1.b - rev 11 Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Verify independent paths exist Verify independent paths from offsite power thru switchyard
  • L0621 and L0622 NOT to both units SAT banks BOTH used
  • Two paths DO NOT overlap
  • ENTER Yes for step 5 of data sheet
  • 6. Check normal and reserve 345 At 0PM03J, VERIFY bus alive KV buses energized light and voltmeter indications for:
  • 345 KV bus 13 ENTER Yes for steps 6a and 6b on data sheet
  • 7. Check normal and reserve At 1/2PM01J, VERIFY X and power SATs available Y winding MW and amps indication for:
  • SATs 142-1 and 142-2 Cue: SATs 242-1 and 242-2
  • SATs 242-1 and 242-2 ENERGIZED ENTER Yes for steps 7a and 7b on data sheet
  • 8. Check ESF buses 141 and 142 At 1PM01J, CHECK bus alive energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:
  • Bus 141
  • Bus 142 ENTER Yes for steps 8a and 8b on data sheet SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 11

RA-1.b - rev 11 Comment ELEMENT STANDARD SAT UNSAT Number

  • 9. CHECK ESF buses 241 and 242 At 2PM01J, CHECK bus alive energized lights, SAT feeder breaker to bus position and bus voltmeter indication for:

Cue: BUS 241 BUS ALIVE light is LIT and voltage is normal

  • Bus 241 Cue: BUS 242 BUS ALIVE light is
  • Bus 242 LIT and voltage is normal ENTER Yes for steps 9a and 9b on data sheet NOTE Alternate path initiated in the following step.
  • 10. Check SAT Feed breakers are At 1/2PM01J, VERIFY position closed and connected and control power available:
  • ACB 1412 Cue: ACB 2412 GREEN light LIT
  • ACB 2412
  • ACB 1422 Cue: ACB 2422 GREEN light LIT
  • ACB 2422 ENTER Yes for steps 10a through 10d on data sheet
  • 11. Check SAT Reserve Feed At 1/2PM01J, VERIFY position breakers are closed and and control power available:

connected

  • ACB 1414
  • ACB 1424
  • ACB 2414 Cue: ACB 2414 GREEN light LIT
  • ACB 2424 Cue: ACB 2424 control switch is in ENTER No for step 11d and PTL and OOS Yes for steps 11a through 11c on data sheet
  • 12. Determine acceptance criteria
  • DETERMINE acceptance are NOT met criteria are NOT MET SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 11

RA-1.b - rev 11 Comment ELEMENT STANDARD SAT UNSAT Number

13. Notify US that acceptance
  • Notify US verbally or by criteria are not met checking NO and writing in Cue: US has verified 1BOL 8.1 has Remarks on cover sheet.

been implemented.

Cue: This JPM is completed.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 11

RA-1.b - rev 11 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Perform Offsite AC Power Availability Surveillance (ACB 2424 OOS)

JPM Number: RA 1 (N-75a) Revision Number: 11 Task Number and

Title:

4C.AP-06 Perform the Offsite AC Power Availability Surveillance.

K/A Number and Importance: 2.1.31 4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOSR 8.1.1-1, Rev 9, Normal and Reserve Offsite AC Power Availability Weekly Surveillance CRITICAL STEPS (*) 5, 6, 7, 8, 9, 10, 11 & 12 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

RA-1.b - rev 11 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 is in Mode 1, steady state power.

INITIATING CUE

1. The 1A DG has been declared inoperable and the US has directed you to perform 1BOSR 8.1.1-1, Normal and Reserve Offsite AC Power Availability Weekly Surveillance.
2. The SM has signed and dated the 1BOSR 8.1.1-1 data package cover sheet.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 11

Exelon Nuclear Job Performance Measure Identify Leak Isolation Points from Mechanical Drawings JPM Number: RA-2 Revision Number: 0 Date: 10/20/2011 Revised By: Bill Hochstetter 10/20/2011 Instructor Date Validated By: Scott Miller 11/05/2011 SME or Instructor Date Approved By: Rob Lawlor 11/05/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 8

RA 2- rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 0BOA SEC-4 Rev: 105 Procedure P & ID M-55 sht.1B Rev: D Procedure BOP IA-8 Rev: 52 Procedure BOP IA-9 Rev: 4

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 8

RA 2- rev 0 Revision Record (Summary)

Revision 0 Modified from Braidwood. Rev. 0 at Byron SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 8

RA 2- rev 0 INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are at 100% steady state power.
3. The Turbine Building EO has just reported the Instrument Air Dryer Pre-filter, 1IA02FA, housing appears ruptured and there is a large air leak at the Unit 1 Air Dryer. The crew is entering 0BOA SEC-4, LOSS OF INSTRUMENT AIR, UNIT 0.

INITIATING CUE

1. The Shift Manager has directed you to recommend isolation points for the leak as close as possible to the source and report back to him with your recommendation.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • - Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 8

RA 2- rev 0 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Once the examinee demonstrates the ability to locate the required mechanical print, provide a copy of print M-55 sheet 1B

1. Locate correct P& ID
  • LOCATE M-55 sheet 1B
a. Use computer such as Passport or EDMS
b. Use P&ID book Note: When examinee determines M-55 sheet 1B is required, then provide copy of M-55 sheet 1B.
  • 2 Determine that 1IA003A is an
  • Refers to M-55 sheet 1B acceptable isolation point
  • Determines that 1IA003A is an acceptable isolation point o Recommends that 1B IA Pre-filter should be placed in service prior to removal of 1A IA pre-filter.
  • 3. Determine that 1IA004A is an
  • Refers to M-55 sheet 1B acceptable isolation point
  • Determines that 1IA004A is an acceptable isolation point Recommends that 1B IA Pre-filter should be placed in service prior to removal of 1A IA pre-filter.
4. Shift Manager notified ° NOTIFY SM of Isolation points Cue: The shift manager has been notified SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 8

RA 2- rev 0 RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 8

RA 2- rev 0 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Identify leak isolation points using Mechanical Drawings JPM Number: RA 2 Revision Number: 0 Task Number and

Title:

T.OA39-3 Given a set of plant conditions determine the required actions per 0/1 BOA Sec-4, Loss of Instrument Air K/A Number and Importance: 2.2.41 3.5 Suggested Testing Environment: Simulator or Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): P & ID M-55 sht.1B Rev: D CRITICAL STEPS (*) 2 & 3 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 8

RA 2- rev 0 INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are at 100% steady state power.
3. The Turbine Building EO has just reported the Instrument Air Dryer Pre-filter, 1IA02FA, housing appears ruptured and there is a large air leak at the Unit 1 Air Dryer. The crew is entering 0BOA SEC-4, LOSS OF INSTRUMENT AIR, UNIT 0.

INITIATING CUE

1. The Shift Manager has directed you to recommend isolation points for the leak as close as possible to the source and report back to him with your recommendation.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 8

Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA-3 Revision Number: 4 Date: 9/23/2009 Revised By: Lynn Sanders

  • 9/23/09 Instructor Date Validated By: Lynn Sanders
  • 9/24/09 SME or Instructor Date Reviewed By: W. Kouba
  • 9/28/09 Operations Representative Date Approved By: Robert Meyer
  • 10/2/09 Training Department Date
  • Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 10

RA/SA rev 4 (from N-100)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BCP 400-TCNMT/Routine Rev: 20

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Lynn Sanders (Signature on file) 9/24/09 SME / Instructor Date Brian Clark (Signature on file) 9/24/09 SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 10

RA/SA rev 4 (from N-100)

Revision Record (Summary)

Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10

RA/SA rev 4 (from N-100)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
3. Verify that the RM-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM-11 available.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
5. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 10

RA/SA rev 4 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 10

RA/SA rev 4 (from N-100)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the underlined cue needs to be provided to the examinee.

To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE to the examinee.

1. Refer to the partially completed ° REVIEW BCP 400-BCP 400-TCNMT/ROUTINE TCNMT/ROUTINE for completeness up to Cue: (if asked) Section 2 has been Section 3 verified along with the RETDAS Gaseous Release Rate printouts.
2. Complete daily channel checks ° VERIFY/COMPLETE the daily channel check on Cue: The daily channel check of 1RE-PR001 1RE-PR001 was previously performed and was satisfactory
3. Perform Source/Channel check ° PERFORM the 1PR01J source/channel check Cue: The U2 Assist NSO has completed 1BOSR 11.b.6-1 and has been reviewed and was satisfactory NOTE In the following JPM step, the examinee should N/A the step because 1PR11J is inoperable.
4. Noble gas trend ° VERIFY noble gas trend Cue: 1PR11J is inoperable
5. As Found setpoints of 1RE- At the RM-11, RECORD As PR001 Found setpoints of 1RE-PR001gas channel:

Cue: The High alarm setpoint is 4.83 E-04 ° High alarm setpoint Cue: The Alert alarm setpoint is ° Alert alarm setpoint 2.42 E-04 SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 10

RA/SA rev 4 (from N-100)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 6. RM-11 supervisory mode At the RM-11:

Cue: RM-11 is in the supervisory

  • PLACE RM-11 in mode of operation Supervisory Mode
  • 7. Select monitor At the RM-11, Grid 2:

Cue: 1PB101 has been selected

  • SELECT 1PB101 and DEPRESS the SEL key
  • 8. Select high alarm setpoint At the RM-11:

channel

  • DEPRESS Channel Item Cue: The channel item key has key been pressed
  • KEY IN 9 Cue: 9 has been keyed in
  • DEPRESS the SEL key Cue: The select key has been pressed
  • 9. High alarm setpoint At the RM-11:

Cue: The setpoint has been

  • ENTER high alarm setpoint entered (6.25E-04) on 1PB101 per Step 4.1.1.8 Cue: Several seconds have passed and the new high alarm ° RECORD new value setpoint is displayed Cue: Your request for verification is acknowledged, please continue. ° Request verification SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 10

RA/SA rev 4 (from N-100)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 10. Select alert alarm channel At the RM-11:

Cue: The channel item key has

  • DEPRESS Channel Item been pressed key Cue: 10 has been keyed in
  • KEY IN 10 Cue: The select key has been
  • DEPRESS the SEL pressed
  • ENTER alert alarm Cue: The setpoint has been setpoint on 1PB101 per entered (6.25 E-04) Step 4.1.1.8 Cue: Several seconds have ° RECORD new value passed and the new alert alarm setpoint is displayed Cue: Your request for verification Request verification is acknowledged, please continue.
11. Place the RM-11 in Normal Mode At the RM-11:

Cue: RM-11 is in the normal mode ° PLACE the RM-11 in of operation NORMAL MODE

12. Aux building exhaust fan At 0PM02J:

Cue: The 0B VA Fans are running ° ENSURE the 0A OR 0B Aux Building Exhaust Fan Cue: The US will continue at step is in operation 5.

This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 10

RA/SA rev 4 (from N-100)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA/SA-3 Revision Number: 4 Task Number and

Title:

4C.GW-01 PERFORM a Gaseous Release.

K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20)

CRITICAL STEPS (*) 6, 7, 8, 9 & 10 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

RA/SA rev 4 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10

Exelon Nuclear Job Performance Measure Evaluate a Reactivity Change JPM Number: SA 1a Revision Number: 01 Date: 10/17/2011 Developed By: Bill Hochstetter 10/17/2011 Instructor Date Validated By: Brian Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date

SA 1a - rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AP-300-1004 Rev: 2 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

SA 1a - rev 01 Revision Record (Summary)

Revision 01 Initial revision of JPM Comment Resolution Revised JPM for 2012 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

SA 1a - rev 01 INITIAL CONDITIONS:

1. Unit 1 is at 95% power, 6300 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
2. Tave is 1 degree less than Tref.
3. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
4. The NSO has calculated a reactivity change to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to match Tave to Tref by reviewing OP-AA-300-1004, Att. 1, Reactivity Change Determination Form.
  • Provide completed copy of OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements
  • Provide copy of Unit 2 Rema Thumbrules Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps 2 & 3 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TASK STANDARDS:

1. Evaluate the reactivity change to match Tave to Tref.
2. Review the Reactivity Change Determination Form.

MATERIALS:

  • Completed OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Requirements (Attachment 1 is attached)
  • Unit 1 Rema Thumbrules at 6211 EFPH SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

SA 1a - rev 01 RECORD START TIME:

EVALUATOR NOTE: These steps may be performed in any order.

STEP ELEMENT STANDARD SAT UNSAT CMT#

CUE Provide completed copy of OP-AP-300-1004 (att. 1) and a copy of the Unit 1 Rema thumbrules 1 Refer to In accordance with the provided:

  • OP-AP-300-1004, Rev 2, Pwr Boration and Dilution Boration and Dilution Requirements Requirements
  • Unit 1 Rema Thumbrules
  • Unit 1 Rema Thumbrules
  • 2 Review Attachment 1 of OP-AP- Determine wrong unit circled ___ ___ ___

300-1004 on form.

Determine wrong unit circled on form CUE The SM has instructed you to correct the identified error and continue your review.

  • 3 Evaluate calculation for dilution Determine inaccurate calculation volume to be added while withdrawing CB D to 221 steps CUE Evaluator note:

6 step withdrawal of CB D will raise temperature 0.5 degrees calculation is flawed because it omits above from calculation and dilutes a full 224 gallons of primary water, which is 1 degree, rather than taking into account the control rod withdrawal. Correct dilution volume is 112 gallons CUE This JPM is complete RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

SA 1a - rev 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Evaluate a Reactivity Change JPM Number: SA-1a Revision Number: 00 Task Number and

Title:

S-AM-151, Perform proper reactivity management on unit startup and during normal plant operations K/A Number and Importance: GEN 2.1.37 Imp Factor 4.3/4.6 Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

  • Unit 2 Rema Thumbrules Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

SA 1a - rev 01 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. Unit 1 is at 95% power, 6300 EFPH, 892 ppm boron, with CB D at 215 steps, steady state and equilibrium Xenon
2. Tave is 1 degree less than Tref.
3. The QNE has advised Control Bank D should be withdrawn to 221 steps to control PDMA02 on the desired target.
4. The NSO has calculated a reactivity change to match Tave with Tref.

INITIATING CUES:

1. Evaluate the reactivity change to match Tave to Tref by reviewing OP-AA-300-1004, Att. 1, Reactivity Change Determination Form.

SA 1a - rev 01 OP-AP-300-1004 Revision 2 Page 4 of 4 ATTACHMENT 1 REACTIVITY CHANGE DETERMINATION FORM Station: Byron Unit: 1 2 Time: Now Date: Today Desired change:

(Parameter, Magnitude, and Direction: Reactor Power, Rod Position, RCS Temp, Delta I, etc.)

Withdraw Rods 6 steps for PDMA02 control Raise RCS Ave. Temp by 1 degree Reason for Change:

(Temperature control, flux control, fuel burn up)

PDMA02 control and temperature control.

What is the method and amount required for the reactivity change?

(Bleed Tank Volume, Gallons of Dilution/Boration/Blended Flow, Rod Insertion/Rod Withdrawal steps/percent) 6 steps withdrawal of CB D and 224 gallons dilution per 1 degree Fahrenheit change.

Inputs:

(ReMA Thumbrules, ReMA maneuver guidance, Curve Book Figure/Table, Computer based trend plot, RCS Cb, EFPD - Preparer and Reviewer should use independent inputs when possible)

Rema thumbrules for Unit 1 at 6211 EFPH Calculation of change:

(E.G. Bwd/Byr: ReMA Thumbrule identifies 20 gallons BA = 1.0°F RCS temp reduction.

Desired change = 0.5°F drop. Calculation of change: (20 gal/1.0°F)

  • 0.5°F = 10 gal.,

previously used borations and dilutions)

(TMI: Procedure 1102-4 Power Operations Fig. 1, Volume of Deminerlized Water for 1% Rod Insertion) 1.0° low x 224 gallons dilution per degree raised = 224 gallons dilution Joe Rowe P Chech ______________

Preparer Reviewer Approver (RO) (RO/SRO) (SRO)

Shift Manager Notified: Yes No

Exelon Nuclear Job Performance Measure Determine venting time for Reactor Vessel void JPM Number: SA-1.b Revision Number: 0 Date: 10/18/2011 Revised By: Bill Hochstetter 10/18/2011 Instructor Date Validated By: Brian Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 8

SA-1.b - rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: 1BFR I.3 Rev: 200 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 8

SA-1.b - rev 0 Revision Record (Summary)

Revision 11 Revised to current format SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 8

SA-1.b - rev 0 INITIAL CONDITIONS

1. You are an extra SRO.
2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
3. The crew is performing 1BFR-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
5. Current plant conditions are as follows
  • Containment temperature (dry bulb) = 135 degreesF
  • Containment pressure = 2.1 psig
  • RCS pressure = 1500 psig INITIATING CUE
1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1BFR-I.3, Attachment B.
2. Inform the SM when you have completed 1BFR-I.3, Attachment B Fill in the JPM Start Time when the student acknowledges the Initiating Cue Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 8

SA-1.b - rev 0 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee with a copy of 1BFR-I.3

1. Refer to 1BFR-.3. Refer to 1BFR-I.3 Note: Provide copy of 1BFR-I.3 and a calculator to examinee.
  • 2. Calculate containment temperature Perform Attachment B, step 1:

in Rankine

  • Enter 135 in degrees F blank
  • Add 460 to 135 and enter 595 in degree R blank
  • 3. Calculate containment air volume Perform Attachment B, step 2 based on current temperature and
  • Enter 595 in degree R blank pressure.
  • Enter 2.1 in CNMT press blank
  • Perform calculation and enter 2,646,050 (or approximate in cu. ft. blank
  • 4. Calculate maximum hydrogen Perform Attachment B, step 3 volume that can be vented
  • Enter 1 in cnmt hydrogen keeping cnmt concentration below conc. blank.

3%

  • Enter 2,646,050 (or apprx.)

in cu. ft. blank

  • Perform calculation and enter 52,921 (or approx.) in cu. ft. blank SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 8

SA-1.b - rev 0 Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Determine hydrogen flow rate Perform Attachment B, step 4 from RCS vent.
  • Plot RCS pressure on 1BFR-I.3-4 and determine flow rate will be about 4700 scfm (+ 100 scfm)
  • Enter flow rate in step 4 SCFM blank
  • 6. Calculate maximum venting Perform Attachment B, step 5 time.
  • Enter 52,921 (or approx.) in cu. ft. blank
  • Enter 4700 (4600-4800) in SCFM blank
  • Calculate minutes and enter 11.3 (range of 11.0 to 11.7) in minutes blank
7. Report to SM results of venting Notify SM that RCS venting can calculation be performed for approx. 11.0 to 11.7 minutes:

Cue: This JPM is completed.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 8

SA-1.b - rev 0 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Determine Venting time for Reactor Vessel Void JPM Number: SA-1.b Revision Number: 0 Task Number and

Title:

Diagnose and analyze voids in the reactor vessel (T.FR6-04)

K/A Number and Importance: 2.1.25 4.2 Suggested Testing Environment: Simulator or classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BFR-I.3, Response to voids in the reactor vessel CRITICAL STEPS (*) 2, 3, 4, 5, & 6 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 8

SA-1.b - rev 0 INITIAL CONDITIONS

1. You are an extra SRO.
2. Unit 1 is recovering from an event that caused a suspected hydrogen bubble to accumulate in the reactor vessel head.
3. The crew is performing 1BFR-I.3, RESPONSE TO VOIDS IN THE REACTOR VESSEL.
4. Attempts to condense the vessel head void have been unsuccessful and the TSC has directed the crew to perform a direct vessel vent.
5. Current plant conditions are as follows
  • Containment temperature (dry bulb) = 135 degreesF
  • Containment pressure = 2.1 psig
  • RCS pressure = 1500 psig INITIATING CUE
1. The Shift Manager directs you to assist the Unit 1 SRO by calculating reactor vessel vent time per 1BFR-I.3, Attachment B.
2. Inform the SM when you have completed 1BFR-I.3, Attachment B SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 8

Exelon Nuclear Job Performance Measure Initiate a LCOAR JPM Number: SA-2 (S009)

Revision Number: 0 Date: 10/19/2011 Revised By: Bill Hochstetter 10/19/2011 Instructor Date Validated By: Brian Lewin 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 8

SA 2- rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAP 1400-6 Rev: 28 Procedure 1BOL 7.4 Rev: 3

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 8

SA 2- rev 0 Revision Record (Summary)

Revision 0 Modified S009 Rev. 6 SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 8

SA 2- rev 0 INITIAL CONDITIONS

1. You are the Unit Supervisor.
2. The unit is at 90% steady state power, all conditions normal.

INITIATING CUE

1. The Shift Manager notifies you 5 minutes ago, the 1B SG Atmospheric PORV was taken out of service for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for actuator oil change.
2. The Shift Manager directs that it is NOT necessary to update the DEL per LCO 3.0.6 for this short duration LCO.
3. The Clearance Order number is 48763.
4. Under the above C/O the manual isolation valve, 1MS019B, is tagged closed.
5. The work is being performed by MMD under Work Order 185000.
6. 1BOL 6.3 has been entered for the Containment Isolation Valve and is being completed by the WEC.
7. Initiate the additional LCOAR paperwork as necessary Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • - Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 8

SA 2- rev 0 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Once the student demonstrates the ability to locate referenced procedure provide the student with a copy of the procedure.

Step 1 of this JPM is optional

1. Refer to BAP 1400-6, Technical ° LOCATE and OPEN BAP Specification Limiting Conditions 1400-6 for Operation Action Requirements (LCOAR)
2. Refer to 1BOL 7.4, LCOAR ° LOCATE and OPEN 1BOL Steam Generator Power 7.4 Operated Relief valve(s) -Tech Spec LCO 3.7.4
  • 3. Section A of 1 BOL 7.4 ENTER into Section A:

Cue: Notification occurred 5

  • Time/Date minutes ago

° By

° Title

  • Present mode
  • Initiating event
  • Condition
  • 4. Safety function determination
  • Indicate No in Section C or degraded support or supported equipment on the A train
5. Update DEL: from turnover
  • Check N/A box information
6. Fill in Related WO: from turnover
  • 185000 from initial information conditions SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 8

SA 2- rev 0 Comment ELEMENT STANDARD SAT UNSAT Number

7. Fill in Related Clearance Orders
  • 48763 from initial from turnover information conditions
8. Was an IR written?
  • Check No box and write planned work or similar
  • 9. LCOAR TABLE of 1 BOL 7.4 COMPLETE LCOAR Table:

° CIRCLE Condition A

  • ENTER notification Time/Date AND sign Condition A
10. Peer check prior to SM signing ° BAP 1400-6 for Peer check Cue: A second SRO has peer check the package and has signed ° Get an additional SRO to and dated the margin of the cover Peer check the BOL sheet package
11. Signed by Shift Manager ° NOTIFY SM Cue: The shift manager has reviewed the LCOAR RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 8

SA 2- rev 0 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Initiate a LCOAR. (SRO)

JPM Number: SA 2(S009) Revision Number: 0 Task Number and

Title:

8E.TS-007 ENSURE compliance with all applicable Tech Spec Action Statements.

K/A Number and Importance: 2.2.23 4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BAP 1400-6, Technical Specification Limiting Conditions for Operation Action Requirements (LCOAR) (Rev 28) 1BOL 7.4, LCOAR SG PORV - Operating Tech Spec LCO 3.7.4 (Rev 3)

CRITICAL STEPS (*) 3, 4 & 9 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 8

SA 2- rev 0 INITIAL CONDITIONS

1. You are the Unit Supervisor.
2. The unit is at 90% steady state power, all conditions normal.

INITIATING CUE

1. The Shift Manager notifies you 5 minutes ago, the 1B SG Atmospheric PORV was taken out of service for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for actuator oil change.
2. The Shift Manager directs that it is NOT necessary to update the DEL per LCO 3.0.6 for this short duration LCO.
3. The Clearance Order number is 48763.
4. Under the above C/O the manual isolation valve, 1MS019B, is tagged closed.
5. The work is being performed by MMD under Work Order 185000.
6. 1BOL 6.3 has been entered for the Containment Isolation Valve and is being completed by the WEC.
7. Initiate the additional LCOAR paperwork as necessary SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 8

Exelon Nuclear Job Performance Measure Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: SA-3 Revision Number: 4 Date: 9/23/2009 Revised By: Lynn Sanders

  • 9/23/09 Instructor Date Validated By: Lynn Sanders
  • 9/24/09 SME or Instructor Date Reviewed By: W. Kouba
  • 9/28/09 Operations Representative Date Approved By: Robert Meyer
  • 10/2/09 Training Department Date
  • Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 10

RA/SA rev 4 (from N-100)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BCP 400-TCNMT/Routine Rev: 20

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Lynn Sanders (Signature on file) 9/24/09 SME / Instructor Date Brian Clark (Signature on file) 9/24/09 SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 10

RA/SA rev 4 (from N-100)

Revision Record (Summary)

Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10

RA/SA rev 4 (from N-100)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Ensure that either the 0A or 0B Aux Building Exhaust Fan is in operation.
3. Verify that the RM-11 values for the appropriate channels agree with the surveillance paperwork and Supervisory key for the RM-11 available.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
5. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 10

RA/SA rev 4 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 10

RA/SA rev 4 (from N-100)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the underlined cue needs to be provided to the examinee.

To initiate this JPM, hand the partially completed BCP 400-TCNMT/ROUTINE to the examinee.

1. Refer to the partially completed ° REVIEW BCP 400-BCP 400-TCNMT/ROUTINE TCNMT/ROUTINE for completeness up to Cue: (if asked) Section 2 has been Section 3 verified along with the RETDAS Gaseous Release Rate printouts.
2. Complete daily channel checks ° VERIFY/COMPLETE the daily channel check on Cue: The daily channel check of 1RE-PR001 1RE-PR001 was previously performed and was satisfactory
3. Perform Source/Channel check ° PERFORM the 1PR01J source/channel check Cue: The U2 Assist NSO has completed 1BOSR 11.b.6-1 and has been reviewed and was satisfactory NOTE In the following JPM step, the examinee should N/A the step because 1PR11J is inoperable.
4. Noble gas trend ° VERIFY noble gas trend Cue: 1PR11J is inoperable
5. As Found setpoints of 1RE- At the RM-11, RECORD As PR001 Found setpoints of 1RE-PR001gas channel:

Cue: The High alarm setpoint is 4.83 E-04 ° High alarm setpoint Cue: The Alert alarm setpoint is ° Alert alarm setpoint 2.42 E-04 SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 10

RA/SA rev 4 (from N-100)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 6. RM-11 supervisory mode At the RM-11:

Cue: RM-11 is in the supervisory

  • PLACE RM-11 in mode of operation Supervisory Mode
  • 7. Select monitor At the RM-11, Grid 2:

Cue: 1PB101 has been selected

  • SELECT 1PB101 and DEPRESS the SEL key
  • 8. Select high alarm setpoint At the RM-11:

channel

  • DEPRESS Channel Item Cue: The channel item key has key been pressed
  • KEY IN 9 Cue: 9 has been keyed in
  • DEPRESS the SEL key Cue: The select key has been pressed
  • 9. High alarm setpoint At the RM-11:

Cue: The setpoint has been

  • ENTER high alarm setpoint entered (6.25E-04) on 1PB101 per Step 4.1.1.8 Cue: Several seconds have passed and the new high alarm ° RECORD new value setpoint is displayed Cue: Your request for verification is acknowledged, please continue. ° Request verification SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 10

RA/SA rev 4 (from N-100)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 10. Select alert alarm channel At the RM-11:

Cue: The channel item key has

  • DEPRESS Channel Item been pressed key Cue: 10 has been keyed in
  • KEY IN 10 Cue: The select key has been
  • DEPRESS the SEL pressed
  • ENTER alert alarm Cue: The setpoint has been setpoint on 1PB101 per entered (6.25 E-04) Step 4.1.1.8 Cue: Several seconds have ° RECORD new value passed and the new alert alarm setpoint is displayed Cue: Your request for verification Request verification is acknowledged, please continue.
11. Place the RM-11 in Normal Mode At the RM-11:

Cue: RM-11 is in the normal mode ° PLACE the RM-11 in of operation NORMAL MODE

12. Aux building exhaust fan At 0PM02J:

Cue: The 0B VA Fans are running ° ENSURE the 0A OR 0B Aux Building Exhaust Fan Cue: The US will continue at step is in operation 5.

This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 10

RA/SA rev 4 (from N-100)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Change RM-11 Setpoints in Preparation for a Unit 1 Containment Release JPM Number: RA/SA-3 Revision Number: 4 Task Number and

Title:

4C.GW-01 PERFORM a Gaseous Release.

K/A Number and Importance: Generic 2.3.5 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BCP 400-TCNMT/ROUTINE, Gaseous Effluent Release Form Type: Routine Containment Release (Rev. 20)

CRITICAL STEPS (*) 6, 7, 8, 9 & 10 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

RA/SA rev 4 (from N-100)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. A Unit 1 Containment release is pending.
3. 1PR11J is inoperable.

INITIATING CUE You have been instructed to perform Section 4 of BCP 400-TCNMT/ROUTINE in preparation for this release.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10

Exelon Nuclear Job Performance Measure Classify Event and Fill Out a NARS Form (LBLOCA)

JPM Number: SA-4 Revision Number: 5 Date: 10/28/2011 Revised By: Bill Hochstetter 10/28/2011 Instructor Date Reviewed By: Brian Lewin 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure EP-MW-114-100 Rev: 11 Procedure EP-MW-114-100-F-01 Rev: F Procedure EP-AA-1002 Rev: 28

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Lynn Sanders (Signature on file) 9/09/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

Revision Record (Summary)

Revision 4 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Validated 9/20/11 by Lynn Sanders and Mike McCue, only change was procedure rev that did not affect JPM.

New event created for 2011 Requal, classified as modified for ILT exam since this specific item has not been tested previously in ILT.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. None.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

INITIAL CONDITIONS

1. You are the Shift Emergency Director.
2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.

INITIATING CUE

1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
2. This is a time critical JPM.

PLANT CONDITIONS

  • Unit 1 and 2 were both at full power.
  • A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
  • A large break Loss of Primary Coolant
  • Containment Spray pumps did not automatically start and could NOT be manually started.
  • Containment pressure peaked at 29 psig.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE The completion of Step 2 fulfills the critical time portion of this JPM.

1. Refer to Exelon Nuclear - Refer to EAL Matrix, EP-Radiological Emergency Plan AA-1002 Annex for Byron Station.

Note: This step may be performed at any time

  • 2. Classify the Event utilizing EAL
  • Classify event as SITE Matrix. AREA EMERGENCY, from FS1 Loss OR Potential Loss Critical portion stop time ______ of 2 Fission Product Barriers (RCS and CNMT).

Time from start to Classification = ¢ < 15 minutes

________ minutes NOTE Provide the examinee with a copy of the NARS form.

3. Obtain NARS form, EP-MW-114- ° Obtain NARS form.

100-F-01, Nuclear Accident Reporting System (NARS).

Note: Step 3 may be performed at any time

4. Refer to EP-MW-114-100, ° Locate and Open, EP-MW-MWROG Offsite Notifications, to 114-100, MWROG Offsite complete NARS form. Notifications, Section 4.2, to Note: Step 4 may be performed at complete NARS form.

any time NOTE Provide the examinee with Wind Speed and Wind Direction cues after examinee has demonstrated the ability to obtain the information from the computer or from the main control board.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

SA-4 (from S016t - rev 4)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 5. Fill out NARS form according to

Cue: The wind direction on AM004

  • BLOCKS 2 thru 9 must be is 286°. filled correctly to meet the critical portion of filling out Cue: The wind speed on AM001 is the NARS form. (See 3 mph. attached KEY).

Time to complete NARS Form ¢ < 12 minutes

= ________ minutes RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 Nuclear Accident Reporting System (NARS) Form UTILITY MESSAGE NO. ____1___ STATE MESSAGE NO. ____N/A_

1. STATUS 2. STATION

[A] ACTUAL [A] BRAIDWOOD [C] CLINTON [E] LASALLE [G] ZION

[X] DRILL/EXERCISE [X] BYRON [D] DRESDEN [F] QUAD CITIES

3. ONSITE CONDITION 4. ACCIDENT CLASSIFIED ACCIDENT TERMINATED

[A] UNUSUAL EVENT TIME (3[A-E]): Now TIME (3[F]): N/A

[B] ALERT DATE (3[A-E]): Today DATE (3[F]):N/A

[X] SITE AREA EMERGENCY EAL#: FS1

[D] GENERAL EMERGENCY

[E] RECOVERY

[F] TERMINATED

5. RELEASE STATUS 6. TYPE OF RELEASE 7. WIND DIR 8. WIND SPEED

[A] NONE [A] NOT APPLICABLE 286° [A] METERS/SEC.: _

[B] OCCURRING [B] GASEOUS (DEGREES FROM) [X] MILES/HR.: ___3

[C] TERMINATED [C] LIQUID

9. RECOMMENDED ACTIONS UTILITY RECOMMENDATION

[X NONE (UE, Alert and SAE Only)


(GE Only) -----------------------------------------------------------------

[B] SHELTER ILLINOIS SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[C] SHELTER IOWA SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[D] EVACUATE ILLINOIS SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[E] EVACUATE IOWA SUB-AREAS:

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS STATE RECOMMENDATION

[F] NONE

[G] SHELTER SUB-AREAS:

[H] EVACUATE SUB-AREAS:

[I] RECOMMEND POTASSIUM IODIDE (KI) PER PROCEDURES

[J] COMMENCE RETURN OF PUBLIC

[K] OTHER

10. ADDITIONAL INFORMATION None Verified With: STA Approved By: SRO
11. TRANSMITTED BY: NAME PHONE NUMBER TIME/DATE

[A] EXELON:

[B] STATE:

[C] COUNTY:

12. RECEIVED BY: NAME ORGANIZATION TIME/DATE SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 Nuclear Accident Reporting System (NARS) Form Braidwood (UE, Alert, SAE, escalated GE(s),

ROLL CALL LaSalle (UE, Alert, SAE, escalated GE(s),

Termination and Recovery) Initial Roll Call Complete: Termination and Recovery)

NARS Code 20 NARS Code 20 Initial Final (time / date) Initial Final

  1. Illinois EMA # Illinois EMA Illinois REAC Illinois REAC Clinton UE, Alert, SAE, escalated GE(s),

(Only if NARS #1 is a GE) (Only if NARS #1 is a GE)

Termination and Recovery)

NARS Code 38 NARS Code 25 NARS Code 98 Initial Final Initial Final Initial Final

  1. Illinois EMA # Illinois EMA
  1. Illinois EMA
  1. Grundy Co. Sheriff
  1. Grundy Co. Sheriff Illinois REAC # LaSalle Co. Sheriff
  1. Kankakee Co. Sheriff Illinois REAC (Only if NARS #1 is a GE) Grundy Co. EMA
  1. Will County Sheriff NARS Code 36 LaSalle Co. ESDA Illinois REAC Initial Final Grundy Co. EMA # Illinois EMA Kankakee Co. EOC # DeWitt Co. Sheriff Will Co. EOC Illinois REAC DeWitt Co. EOC Byron Dresden Quad Cities (UE, Alert, SAE, escalated (UE, Alert, SAE, escalated (UE, Alert, SAE, escalated GE(s), Termination and GE(s), Termination and GE(s), Termination and Recovery) Recovery) Recovery)

NARS Code 20 NARS Code 20 NARS Code 43 Initial Final Initial Final Initial Final

  1. Illinois EMA # Illinois EMA # Illinois EMA Illinois REAC # Iowa EMD Illinois REAC Illinois REAC Scott Co. Sheriff (Only if NARS #1 is a GE) Clinton Co. EOC NARS Code 37 (Only if NARS #1 is a GE)

NARS Code 22 Scott Co. EOC Initial Final

  1. Illinois EMA Initial Final
  1. Illinois EMA (Only if NARS #1 is a GE)
    • Ogle Co. Sheriff NARS Code 23
  1. Grundy Co. Sheriff
    • Rochelle Police Initial Final
  1. Kendall Co. Sheriff # Illinois EMA Illinois REAC
  1. Will County Sheriff # Iowa EMD Ogle Co. ESDA Illinois REAC # Clinton Co. EOC Ogle Co. EOC Grundy Co. EMA #Rock Island Co. Sheriff Commercial numbers: Kendall Co. EOC # Whiteside Co. Sheriff IEMA 217-782-7860 Will Co. EOC # Scott Co. Sheriff (QC only) # Scott Co. EOC Iowa EMD 515-281-3231 Whiteside Co. ESDA Rock Island ESDA Illinois REAC NOTES: # Indicates that this agency is required to be notified within 15 minutes.
    • Only one needs to answer for notification.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Classify Event and Fill Out a NARS Form (SGTR)

JPM Number: S016t Revision Number: 4 Task Number and

Title:

S-ZP-008 CLASSIFY/RECLASSIFY Emergency Action Levels.

K/A Number and Importance: 2.4.41 4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

EP-MW-114-100 (Rev 11), Midwest Region Offsite Notifications EP-MW-114-100-F-01 (Rev. F) Nuclear Accident Reporting System (NARS) Form EP-AA-1002 (Rev 28) Exelon Nuclear Radiological Emergency Plan Annex for Byron Station CRITICAL STEPS (*) 2 & 5 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S016t - rev 4 INITIAL CONDITIONS

1. You are the Shift Emergency Director.
2. The Unit 1 Supervisor has provided you with information related to a Unit 1 event and informed you to perform an Emergency Plan evaluation.

INITIATING CUE

1. Perform an Emergency Plan evaluation and fill out the NARS form for transmittal for the plant conditions provided
2. This is a time critical JPM.

PLANT CONDITIONS

  • Unit 1 and 2 were both at full power.
  • A Unit 1 Reactor Trip and Safety Injection occurred based on the following conditions:
  • A large break Loss of Primary Coolant
  • Containment Spray pumps did not automatically start and could NOT be manually started.
  • Containment pressure peaked at 29 psig.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Perform Moveable Control Assemblies Quarterly Surveillance JPM Number: CR-A Revision Number: 10 Date: 10/20/2011 Revised By: Bill Hochstetter 10/20/11 Instructor Date Reviewed By: Rob Friskey 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOSR 1.4.2-1 Rev: 17 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/20/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Revision Record (Summary)

Revision 10 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor.

Placed some examiner notes concerning alarms received during step performance Created from JPM No. N-41

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. None.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
1. You have been directed to perform 1BOSR 1.4.2-1, Moveable Control Assemblies Quarterly Surveillance.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN

1. Refer to 1BOSR 1.4.2-1, Moveable 1BOSR 1.4.2-1 Control Assemblies Quarterly Surveillance Note: Step 1 may be performed at any time Cue: All prerequisites are met NOTE Provide the examinee with a copy of the 1BOSR 1.4.2-1.
2. Transfer rod control to manual At 1PM05J:

Cue: The rod bank selector switch is PLACE Rod Bank Selector in the MANUAL position switch to MANUAL Cue: Tave and Tref are matched

° MAINTAIN Tave matched with Tref using rod motion control In column 2a:

3. .Record initial shutdown bank step counter readings

° ENTER initial step counter readings for Shutdown Cue: Step counters for shutdown Banks A, B, C, D, and E banks A through E all indicate ___

(use current cycle) steps

  • 4. Shutdown bank E At 1PM05J:

Cue: The rod bank selector switch is

  • SELECT SBE position on in the SBE position Rod Bank Selector switch SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number NOTE Step 5 is NOT critical if the current normal rod position is 231 steps

  • 5. Insert Shutdown Bank E 1 step At 1PM05J:
  • Using the rod motion control switch, INSERT Shutdown Bank E 1 step
  • Mark N/A if Group Step Counter is already at 231 steps
  • 6. Withdraw shutdown bank E At 1PM05J:

Cue:Shutdown bank E group step

  • Using the rod motion control counter indicates 231 steps switch, WITHDRAW Shutdown Bank E to 231 steps
7. DRPI indication At 1PM05J:

Cue:DRPI indicates that shutdown ° VERIFY DRPI indicates 228 bank E is at 228 steps steps withdrawn NOTE Annunciator 1-10-A7 ROD DEV POWER RNG TILT, will alarm during performance of step 8

  • 8. Insert shutdown bank E At 1PM05J:

Cue: Shutdown bank E group step

  • Using the rod motion counter indicates 216 steps control switch, INSERT Shutdown Bank E 10 to 15 steps
9. .Record step counter readings In column 2g:

Cue:Shutdown bank E step counter ° RECORD shutdown indicates 216 step bank E step counter reading SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number In column 2h:

10. Shutdown bank E DRPI

° VERIFY each rod in shutdown bank E moved 10 -

Cue: DRPI indicates that each rod in 15 steps using DRPI and shutdown bank E is at 216 steps INITIAL

  • 11. Return rods to initial position At 1PM05J:
  • WITHDRAW shutdown Cue:Shutdown bank E step counter bank E rods to 228 steps indicates (the same as JPM step 3 cue)
12. Final shutdown bank E position In column 2j:

Cue:Repeat JPM step 11 cue

° RECORD final shutdown bank E position

13. Final shutdown bank E DRPI In column 2k:

Cue: DRPI indicates that each rod in ° VERIFY each rod in shutdown bank E is at ___ steps shutdown bank E is restored to original position and INITIAL NOTE The steps for Shutdown Banks A, B, C, and D need not be performed. The evaluator should direct the examinee to go to the next step that addresses control banks

14. Record initial control rod bank step counter readings In column 3a:

Cue: Step counters for control ° ENTER initial step counter banks A through C all indicate ___ readings for Control Banks (use current cycle) steps A, B, C, and D Cue: Control bank D indicates 220 steps SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 15. Control bank A At 1PM05J:

Cue: The rod bank selector switch is

  • SELECT CBA position in the CBA position on Rod Bank Selector switch NOTE Step 16 is NOT critical if the current normal rod position is 231 steps
  • 16. Insert Control Bank A 1 step At 1PM05J:
  • Using the rod motion control switch, INSERT Control Bank A 1 step Mark N/A if Group Step Counter is already at 231 steps
  • 17. Withdraw control bank A At 1PM05J:

Cue: Both control bank A step

  • Using the rod motion counter groups indicate 231 steps control switch, WITHDRAW Control Bank A to 231 steps NOTE The following Annunciators will alarm during the performance of step 18 1-10-A6 ROD BANK LO-2 INSERTION LIMIT, 1-10-A7 ROD DEV POWER RNG TILT, and 1-10-B6 ROD BANK LO INSERTION LIMIT
  • 18. Insert control bank A At 1PM05J:

Cue: Control bank A group step

  • Using the rod motion counters indicate 216 steps control switch, INSERT Control Bank A 10 to 15 steps
19. Record step counter readings In column 3f:

Cue: Both control bank A group step ° RECORD control rod counters indicate 216 steps bank A step counter readings for both groups 1 and 2 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number In column 3g:

20. Control bank A DRPI

° VERIFY each rod in control bank A moved 10 - 15 Cue: DRPI indicates that each rod in steps using DRPI and INITIAL control bank A is at 216 steps

  • 21. Return rods to initial position At 1PM05J:

Cue: Control bank A group step

  • WITHDRAW control counters both indicate ___ steps bank A to original position
22. Final control rod bank A position In column 3i:

Cue: Control bank A group step ° RECORD final control counters indicate ___ bank A position

23. Final control bank A DRPI In column 3j:

° VERIFY each rod in Cue: DRPI indicates that each rod in control bank A is at its original control bank A is at ___ steps position NOTE The steps for control banks B, C, and D need not be performed. The evaluator should direct the examinee to go to the next step that addresses P/A converter and bank overlap alignment.

Cue: Step F.4 has been completed by two NLOs and all steps were acceptable.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N rev 9)

Comment ELEMENT STANDARD SAT UNSAT Number

24. Restore rod control to automatic At 1PM05J, VERIFY:

Cue: C-5 is NOT LIT and has been C-5 is NOT LIT independently verified Cue: Tave/Tref deviation is <1°F and Tave/Tref deviation < 1°F has been independently verified Cue: The bank selector switch is in PLACE bank selector the AUTO position and has been switch in AUTO independently verified Cue: (if required) This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N-41 R9)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Moveable Control Assemblies Quarterly Surveillance JPM Number: CR-A Revision Number: 10 Task Number and

Title:

4C.RD-01 PERFORM Control Rod Exercises K/A Number and Importance: 014A4.02 3.4/3.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOSR 1.4.2 Moveable Control Assemblies Quarterly Surveillance CRITICAL STEPS (*) 4, 5, 6, 8, 11, 15, 16, 17, 18 & 21 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 23 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N-41 R9)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at 100% power, steady state, equilibrium Xenon, MOL INITIATING CUE
1. You have been directed to perform 1BOSR 1.4.2-1, Moveable Control Assemblies Quarterly Surveillance.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Raise Accumulator Level With SI Pump JPM Number: CR-b Revision Number: 0 Date: 10/21/2011 Revised By: Bill Hochstetter 10/20/11 Instructor Date Reviewed By: Rob Friskey 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP SI-22 Rev: 10 Procedure Rev:

9. Procedure Rev:
10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/21/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Revision Record (Summary)

Revision 0 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor,. Created from JPM No. N-73 Created rev. 0 as alternate path Changed NLO to EO

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Set C accumulator level to 30% by:

set SIMACC(3)= 58065 set SIMN2ACC93)= 1290

3. Insert Malfunction SI01A to trip 1A SI pump
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
5. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at full power, steady state, equilibrium Xenon, MOL
3. All plant systems and controls are normal INITIATING CUE
1. The chemistry department left accumulator _C sample valve open after sampling, resulting in a low level of 30%.
2. The sample valve has been closed, and the lineup returned to normal.
3. The accumulator has been declared inoperable due to the low level and the LCOAR (_BOL 5.1) has been entered.
4. U-1 RWST boron concentration is 2350 ppm.
5. The US has directed you to return the accumulator level to the normal band using the _A SI pump.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN BOP

1. Refer to BOP SI-22, Raising SI SI-22 Accumulator Level in Mode 1, 2 or 3 Note: Step 1 may be performed at any time.

Cue: (if asked) _C SI Accumulator Pressure is 625 psig.

Verify nothing discharging to

2. VERIFY the following NOT RWST:

discharging to applicable RWST Cue: The Field Supervisor reports ° 0FC03PA/B, 0A/B refueling the purification pumps are not water purification pumps discharging to the RWST ° _SI03P, RWST heating pump (May mark N/A per Cue: The Field Supervisor reports NOTE) the RWST heating pump is not discharging to the RWST

° _RE01PA/B, RCDT pump Cue:The Field Supervisor reports that _A/B A and B RCDT pumps are not discharging to the RWST

° _FC01D, spent fuel pit Cue: The Field Supervisor reports demineralizer effluents that the SFP demineralizer is not discharging to the RWST

° _CS01PA/B, CS pump Cue: _CS01PA/B GREEN lights are _A/B LIT ° ° RWST makeup from BA Cue: Makeup from BA blender not blender aligned to RWST:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number VERIFY/CLOSE:

3. Align mini-flow path for _A SI pump

° _CV8804A Cue: _CV8804A GREEN light LIT

° _SI8804B Cue: _SI8804B GREEN light LIT VERIFY/OPEN:

° _SI8814 Cue:_SI8814, Grp 1, 6.4 light NOT LIT OR Grp 4, 2.2 light NOT LIT ° _SI8813 Cue: _SI8813 SVAG valve NOT LIT OR Grp 1, 7.3, light NOT LIT OR Grp 4, 2.3 light NOT LITCue:

  • 4. Align SI pump to accumulator At 1PM06J Cue: _SI8806 Grp 1, 5.3 light NOT VERIFY/OPEN:

LIT ° _SI8806 OR SVAG valve light NOT LIT Cue: _SI8923A RED light LIT ° _SI8923A

  • _SI8888 Cue: _SI8888 RED light LIT
  • _SI8871 Cue: _SI8871 RED light LIT
5. Verify SI to radwaste isolated At 1PM11J:

Cue: _SI8964 GREEN light LIT ° VERIFY/CLOSE _SI8964 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number

6. Verify SI pump isolated to hot legs At 1PM06J:

Cue: 1SI8802A Placard installed VERIFY CLOSED and (SVAG TSLB NOT lit) DEENERGIZED:

° _SI8802A

° _SI8802B Cue: 1SI8802B Placard installed (SVAG TSLB NOT lit)

NOTE The procedure branches at this point dependent on the SI pump to be used. The intent of this JPM is to use the 1A SI pump, therefore the examinee should proceed to step F.7.b Cue: (if asked): The SM directs that step F.7.a be omitted.

NOTE The Examinee may elect to have an EO do a pre-start check of the 1A SI pump prior to starting.

Cue: (if asked): The 1A SI pump is ready for a start and I am clear of the pump NOTE Alternate path initiated in the following step. 1A SI Pump will trip right after a start attempt is made.

At 1PM06J :

7. Start the _A SI pump
  • Take _A SI pump C/S to start Cue: The green light and amber disagreement are both lit.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 8. Response to pump trip At 1PM06J:
  • Inform US or SM be filled by the 1B SI pump and will complete the necessary LCOAR and related paperwork
9. Go to step 8 of the procedure References step 8 of procedure Raising SI Accumulator level with the _B SI pump

° Verify RCS pressure >

1700 psig

° At 1PM06J Verify/Open Cue: _SI8821A Green light is LIT ° _SI8821A Cue: _SI8821B Green light is LIT ° _SI8821B

°

  • 10. Start the _B SI pump At _PM06J:

Cue: The _B SI pump RED light is

  • START the _B SI pump LIT
  • Verify the _B SI pump discharge pressure is <

Cue: _B SI pump discharge pressure 1700 psig

= 1200 psig NOTE Examinee may elect to have An EO do a pre-start check of _B SI pump prior to starting CUE: The EO will perform the applicable portions of BOP SI-1T1 THIS SPACE INTENTIONALLY BLANK SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number NOTE When the examinee fills the accumulator 1% to 2% above the low level alarm setpoint (alarm clears) provide the following cue:

Cue: The desired accumulator level has been achieved.

° Enter _BOL 5.1 Cue:Unit _ Unit Supervisor acknowledges entry into _BOL

  • OPEN _SI8878C 5.1 Cue: _SI8878C RED light is LIT Cue: Accumulator _C low level annunciator RESET Note: Cue examinee with 5% level increases every 5 seconds

Cue: _SI8878C GREEN light is LIT

  • CLOSE _SI8878C when accumulator level is Cue: Unit _ Unit Supervisor between 31% and <63%

acknowledges exit _BOL 5.1

° Exit _BOL 5.1

13. Stop the _B SI pump At _PM06J:

° STOP the _B SI pump Cue: _B SI pump GREEN light is LIT

14. Isolate accumulator fill At _PM06J:

Cue: _SI8871 GREEN light is LIT ° CLOSE _SI8871 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N rev 6 modified for alternate path)

Comment ELEMENT STANDARD SAT UNSAT Number At _PM011J:

15. Vent SI train to SI accumulators Cue: _SI 8964 RED light is LIT ° At _PM11J, OPEN

_SI8964 Cue:SI pump discharge pressure ° At _PM06J, MONITOR SI slightly above bottom of scale pump discharge pressure

° At PM11J, CLOSE

_SI8964 Cue:_SI 8964 GREEN light is LIT

16. Isolate SI pump from accumulator At _PM06J:

Cue: _SI8888 GREEN light is LIT ° CLOSE _SI8888

17. Notify chemistry to initiate _BCSR NOTIFY chemistry to initiate 5.1.5 _BCSR 5.1.5 per Tech Spec 3.5.1 Cue: Chemistry has been notified to initiate _BCSR 5.1.5 Cue: This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N-73 R6)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Raise Accumulator Level With SI Pump JPM Number: CR-b Revision Number: 00 Task Number and

Title:

4C.SI-02 FILL the SI System Accumulators K/A Number and Importance: 006A1.13 3.5/3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BOP SI-22, Raising SI Accumulator Level in Modes 1,2 or 3 (Rev. 10)

CRITICAL STEPS (*) 4, 8, 10, 11, & 12 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 23 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-b (from N-73 R6)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. Unit 1 is at full power, steady state, equilibrium Xenon, MOL
3. All plant systems and controls are normal INITIATING CUE
1. The chemistry department left accumulator _C sample valve open after sampling, resulting in a low level of 30%.
2. The sample valve has been closed, and the lineup returned to normal.
3. The accumulator has been declared inoperable due to the low level and the LCOAR (_BOL 5.1) has been entered.
4. U-1 RWST boron concentration is 2350 ppm.
5. The US has directed you to return the accumulator level to the normal band using the _A SI pump.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Perform Transfer to Hot Leg Recirc JPM Number: CR-c Revision Number: 00 Date: 10/24/2011 Revised By: Bill Hochstetter 10/24/11 Instructor Date Reviewed By: Brian Lewin 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BEP ES-1.4 Rev: 200 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/20/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

Revision Record (Summary)

Revision 0 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, revised to make alternate path Created from JPM No. N-30.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-180 (LOCA and currently on Cold Leg Recirc)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Turn annuncators to OFF.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. A large LOCA is in progress.
3. 1BEP-1 step 19 has been completed.
4. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 50 minutes has elapsed since SI was actuated.

INITIATING CUE

1. The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee

1. Refer to 1BEP ES-1.4, Transfer to LOCATE and OPEN Hot Leg Recirculation 1BEP ES-1.4 Note: This step may be performed at any time.
2. Place SVAG Valve Bus Feeds to At 1PM06J, CLOSE:

Close.

  • 480V Feed to Bus Cue: The 480V Feed to 131X1A/X2A 131X1A/X2A RED lights are LIT Cue: The 480V Feed to 132X2A/X4A
  • 480V Feed to Bus RED lights are LIT 132X2A/X4A
  • 3. Close RH to cold legs isol valves. At 1PM06J, CLOSE:

Cue: 1SI8809A RED light is LIT

  • 1SI8809A Cue: 1SI8809B RED light is LIT:
  • 1SI8809B NOTE Alternate Path JPM starts here
  • 4. Check 1A RH pump running. At 1PM06J:

Cue:RHR pump 1A GREEN light is

  • CHECK RHR pump 1A LIT NOT RUNNING
  • 5 OPEN Train B RH HX discharge At 1PM06J:

crosstie header valve

  • OPEN 1RH8716B Cue:1RH8716B GREEN light is LIT
  • 6. Open RH to hot legs isol valve. At 1PM06J:

Cue:1SI8840 RED light is LIT

  • OPEN 1SI8840 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

Comment ELEMENT STANDARD SAT UNSAT Number

7. Stop SI pump 1A. At 1PM06J:

Cue: The 1A SI pump GREEN light STOP 1A SI pump is LIT

  • 8. Close SI pump 1A to cold legs isol At 1PM06J:

valve.

  • CLOSE 1SI8821A Cue:1SI8821A RED light is LIT
  • 9. Open SI pump 1A to hot legs isol At 1PM06J:

valve.

  • OPEN 1SI8802A Cue:1SI8802A RED light is LIT
  • 10. Start the 1A SI pump. At 1PM06J:

Cue:The 1A SI pump RED light is LIT

  • START 1A SI pump
11. Stop SI pump 1B. At 1PM06J:

Cue:The 1B SI pump GREEN light is STOP 1B SI pump LIT

  • 12. Close SI pump 1B to cold legs isol At 1PM06J:

valve.

  • CLOSE 1SI8821B Cue: 1SI8821B RED light is LIT
  • 13. Open SI pump 1B to hot legs isol At 1PM06J:

valve.

  • OPEN 1SI8802B Cue: 1SI8802B RED light is LIT
  • 14. Start the 1B SI pump. At 1PM06J:
  • START 1B SI pump Cue: The 1B SI pump RED light is LIT
15. Check SI pumps to hot legs isol At 1PM06J, Verify OPEN valves open Cue: 1SI8802A RED light is LIT 1SI8802A Cue: 1SI8802B RED light is LIT 1SI8802B SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 -revised to make alternate path rev 0)

Comment ELEMENT STANDARD SAT UNSAT Number

16. Close SI pumps to cold leg isol At 1PM06J:

valve CLOSE 1SI8835 Cue: 1SI8835 RED light is LIT

17. Place SVAG Valve Bus Feeds to At 1PM06J, TRIP TRIP.

480V Feed to Bus Cue: The 480V Feed to 131X1A/X2A 131X1A/X2A GREEN lights are LIT Cue: The 480V Feed to 132X2A/X4A 480V Feed to Bus GREEN lights are LIT 132X2A/X4A Cue:

Cue: This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 R7)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Align ECCS to Hot Leg Recirc JPM Number: CR-c Revision Number: 0 Task Number and

Title:

4D.EP-15 TRANSFER ECCS to Hot Leg Recirculation K/A Number and Importance: 011EA1.11 4.2/4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BEP ES1.4, Transfer to Hot Leg Recirculation (Rev. 200)

CRITICAL STEPS (*) 3, 4, 5, 6, 8, 9, 10, 12, 13, & 14 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 23 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-c (from N-30 R7)

INITIAL CONDITIONS

1. You are the Unit 1 NSO.
2. A large LOCA is in progress.
3. 1BEP-1 step 19 has been completed.
4. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 50 minutes has elapsed since SI was actuated.

INITIATING CUE

2. The Unit Supervisor has directed you to proceed with 1BEP ES-1.4, Transfer to Hot Leg Recirculation.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Respond To 1A SX Pump Trip (Standby Pump Does Not Start)

JPM Number: CR-d Revision Number: 0 Date: 10/20/2011 Developed By: Bill Hochstetter 10/20/2011 Instructor Date Validated By: Mark Ristau 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor

  • 11/06/2011 Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 9

CR-d from N130a rev 3 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BAR 1-2-A1 Rev 4

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Lynn Sanders (Signature on File) 9/24/09 SME / Instructor Date Brian Clark (Signature on File) 9/24/09 SME / Instructor Date Page 2 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 Revision Record (Summary)

Revision 00

1. New JPM
2. Operator Actions PRA Establish SX Crosstie across units.
3. The examinee will only direct the performance of 2 critical steps. The high PRA value of establish SX Crosstie across units justifies counting these steps as critical steps.
4. Validated 11/06/11 by Rob Lawlor and Bill Hochstetter.

Page 3 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 SIMULATOR SETUP INSTRUCTIONS NOTE:

It is okay to use a similar IC to the IC listed below, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

1. Reset to IC-13
2. Verify 1A SX is running
3. Insert malfunction SW01B to trip the 1B SX pump
4. Insert malfunction PN1427 to off
5. Place the simulator in RUN.
6. On the Examiners cue insert malfunction SW01A (15 sec delay) to trip the 1A SX pump
7. When Unit 2 NSO is requested to open 2SX005 modify remote function SW07 to 100 Page 4 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 INITIAL CONDITIONS You are the Unit1 NSO.

INITIATING CUE Respond to alarms on 1PM06J.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Page 5 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 RECORD START TIME:

Note If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee.

ELEMENT STANDARD Comment SAT UNSAT Number NOTE The examinee may refer to BAR 1-2-A1 at any time.

If this JPM is performed on the simulator, only the underlined cue need to be provided to the examinee.

1. Refer to BAR 1-2-A1 o Locate and Open BAR 1 A1 NOTE The next step begins the alternate path steps.
2. Start 1B SX Pump At 1PM06J:

Cue: 1B SX pump C/S is After trip

  • Start 1B SX pump Cue: The 1B SX Oil Pressure Light Is Lit Cue: The 1B SX pump does not start.

NOTE If this is being performed on the simulator, the Simulator Operator will act as the U2 NSO and will perform steps 3 and 5 when requested.

  • 3. Determines SX Pump unavailable
  • DIRECTS U2 NSO to and DIRECTS U2 NSO to START START the standby SX the standby SX Pump on Unit 2 Pump on Unit 2 Cue: Unit 2 NSO reports the Unit 2 Standby SX pump is running Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-d from N130a rev 3 ELEMENT STANDARD Comment SAT UNSAT Number NOTE Steps 4 and 5 may be performed in any order.

  • 4. Open 1SX005. At 1PM06J:

Cue: 1SX005 red light is LIT

  • Open 1SX005:

Cue: 1SX005 green light is NOT LIT

  • 5. DIRECTS U2 NSO to OPEN
  • DIRECTS U2 NSO to OPEN 2SX005 2SX005 Note: wait a few seconds then provide the cue below Cue: 2SX005 indicates open
6. DETERMINE cause of trip. o Dispatch an EO to check the 1A SX pump (BUS 141 Cub 2)

Cue: EO reports phase C overcurrent target is up on the 1A SX pump breaker.

7. REFER to 1BOA PRI-7 o Direct Unit Supervisor to refer to 1BOA PRI-7.

Cue: The Unit Supervisor will refer to 1BOA PRI-7

8. REFER to Technical Specification o Direct Unit Supervisor to 3.7.8. refer to Technical Specification 3.7.8.

Cue: The Unit Supervisor will refer to Technical Specification 3.7.8.

9. INITIATE corrective action. o Direct Unit Supervisor to INITIATE corrective action Cue: The Unit Supervisor will INITIATE corrective action.

Cue: This JPM is complete RECORD STOP TIME:

Page 7 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Respond To 1A SX Pump Trip (Standby Pump Does Not Start)

JPM Number: N130a: Revision Number: 0 Task Number and

Title:

R-OA-108 Respond to Essential Service Water Malfunction.

K/A Number and Importance: 076 A2.01 (3.5/3.7)

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): BAR 1-2-A1 Rev 4 CRITICAL STEPS (*) 3, 4 & 5 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name:___________________________________ (Print)

Evaluators Signature:________________________________ Date:_____________

Page 8 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS You are the Unit1 NSO.

INITIATING CUE Respond to alarms on 1PM06J.

Page 9 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure MANUALLY INITIATE CONTAINMENT SPRAY (BEP-0)

JPM Number: CR-e Revision Number: 4 Date: 11/06/2011 Developed By: Brian Clark (Signature on file) 10/04/07 Instructor Date Validated By: Bill Hochstetter (Signature on file) 11/06/11 SME or Instructor Date Approved By: Rob Lawlor (Signature on file) 11/06/11 Operations Representative Date Page 1 of 10

CR-e from N-46A rev 3 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

_BEP-0, Reactor Trip or Safety Injection.

Procedure Rev. 202 Verified Date: 10/28/2011

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

CR-e from N-46A rev 3 Revision Record (Summary)

1. Revision 3 Changed task conditions from CNMT press is 25# to Containment pressure peaked at 25#. RCPs will be tripped in setup and action has been deleted as a critical task. The two actions of manually opening of _CS019A and placing _A CS pump to Test are each designated as critical tasks.
2. Revision 4 Changed attachment B to attachment C based on rev. to _BEP-0 Page 3 of 10

CR-e from N-46A rev 3 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 179 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Turn annunciators OFF
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
4. This completes the setup for this JPM.

Page 4 of 10

CR-e from N-46A rev 3 INITIAL CONDITIONS

1. You are a unit NSO.
2. A LOCA has just occurred and _BEP-0 is in progress.
3. The ECCS is in the injection mode with dropping RCS pressure.
4. Containment pressure peaked at 25 psig.

INITIATING CUE The Unit Supervisor has directed you to perform step 14 of _BEP-0, Reactor Trip or Safety Injection.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

CRITICAL ELEMENTS(*): 9 & 10 APPROXIMATE COMPLETION TIME: 26 minutes UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Page 5 of 10

CR-e from N-46A rev 3 Comment SAT UNSAT Number STEP ELEMENT STANDARD RECORD START TIME ________

NOTE If this JPM is given on the simulator, only the cues underlined are required to be given to the examinee.

1. Enter BEP-0 at step 14 ° LOCATE and OPEN o o

_BEP-0 to step 14

2. Check containment pressure At _PM06J: o o Cue: Containment pressure is 25 ° CHECK Containment psig on all channels pressure
3. Group 6 containment spray At _PM06J: o o monitor lights Cue: Group 6 CS Monitor lights are NOT LIT ° CHECK Group 6 CS Monitor lights LIT
4. _BEP-0, Step 14.b RNO o o At _PM05J or _PM06J:

Cue: CS has been MANUALLY ° MANUALLY ACTUATE ACTUATED Containment Spray and Phase B Isolation Cue: Group 6 CS Monitor lights are ° CHECK Group 6 CS NOT LIT Monitor lights LIT

5. BEP-0, Attachment C ° GO TO BEP-0, o o Attachment C
6. _BEP-0, Attachment C, CS RWST At _PM06J, CHECK OPEN: o o Suction valves ° _CS001A Cue: _CS001A GREEN light is LIT ° _CS001B Cue: _CS001B GREEN light is LIT Page 6 of 10

CR-e from N-46A rev 3 Comment SAT UNSAT Number STEP ELEMENT STANDARD

7. _BEP-0, Attachment C, CS Pump At _PM06J, CHECK OPEN: o o Header isol valves ° _CS007A Cue: _CS007A RED light is LIT ° _CS007B Cue: _CS007B RED light is LIT
8. _BEP-0, Attachment C, CS eductor At _PM06J, CHECK OPEN: o o spray additive valves ° _CS019A Cue: _CS019A GREEN light is LIT ° _CS019B Cue: _CS019B RED light is LIT NOTE Alternate path begins with step 9 and ends with step 10
  • 9. _BEP-0, Attachment C, Step 1.c At _PM06J; o o RNO Cue: The _A CS pump test switch is
  • PLACE _A CS pump test in TEST switch in TEST
  • 10 _BEP-0, Attachment C, Step 1.c At _PM06J; o o RNO (continued)

Cue: _CS019A RED light is LIT

  • MANUALLY OPEN

_CS19A

11. _BEP-0, Attachment C, Step 1.c At _PM06J; o o RNO (continued)

° PLACE _A CS pump test switch in NORMAL Cue: The _A CS pump test switch is in NORMAL Cue: (If asked) The _A CS pump RED light is LIT At _PM06J, CHECK OPEN: o o

12. _BEP-0, Attachment C, CS ° _CS010A Eductor Inlet FCVs ° _CS010B Cue: _CS010A GREEN light is LIT Cue: _CS010B GREEN light is LIT Page 7 of 10

CR-e from N-46A rev 3 Comment SAT UNSAT Number STEP ELEMENT STANDARD

13. _BEP-0, Attachment C, CS Pumps At _PM06J: o o Cue: _A CS pump RED light is LIT ° Check at least one CS Cue: _B CS pump RED light is pump RUNNING NOT LIT
14. _BEP-0, Attachment C, Step 3 ° RETURN TO BEP-0, o o Step 14.c
15. Group 6 Phase B isolation monitor At _PM06J: o o lights Cue: Group 6 Phase B Isolation monitor lights are LIT ° CHECK Group 6 Phase B Isolation monitor lights LIT
16. Stop All Reactor Coolant Pumps At _PM05J: o o Cue: All RCP RED lights are LIT o Check all RCPs STOPPED
15. Check CS eductor suction flow > At _PM06J: o o 15 gpm Cue: Flow on _FI-CS013 indicates 130 gpm ° CHECK CS eductor suction flow on _FI-CS013
16. Check CS eductor additive flow > At _PM06J: o o 5 gpm Cue: Flow on _FI-CS015 indicates 55 gpm ° CHECK CS eductor Cue: This JPM is completed additive flow on _FI-CS015 RECORD STOP TIME_______

Page 8 of 10

CR-e from N-46A rev 3 Operators Name:

Job

Title:

RO SRO SRO Cert JPM

Title:

Manually Initiate Containment Spray (_BEP-0)

JPM Number: N-46a Revision Number: 4 Task Number and

Title:

4D.CS-01 Manually Initiate Containment Spray (BEP-0)

K/A Number and Importance: 026A4.01 (4.5 / 4.3)

Task Standard: Manually Initiate Containment Spray _BEP-0 Step 14 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

_ BEP-0, Step 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 10

CR-e from N-46A rev 3 INITIAL CONDITIONS TASK CONDITIONS:

1. You are the Unit NSO.
2. A LOCA has just occurred and _BEP-0 is in progress.
3. The ECCS is in the injection mode with decreasing RCS pressure.
4. Containment pressure peaked at 25 psig.

INITIATING CUES:

The US has directed you to initiate Containment Spray per _BEP-0, Step 14.

Page 10 of 10

Exelon Nuclear Job Performance Measure Unload D/G that is paralleled to the SAT JPM Number: CR-f Revision Number: 15 Date: 10/29/2011 Revised By: Bill Hochstetter 10/29/2011 Instructor Date Reviewed By: Mark Ristau 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP DG-12 Rev: 20 Procedure BOP DG-11T1, Diesel Generator Start/Stop Log Rev: 2

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/29/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

Revision Record (Summary)

Revision 15 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, change was procedure rev that added 1 step to the JPM.

Created from JPM No. N-6 rev.14

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Start, parallel, and load DG to 5500 KW using procedure then snap for succeeding uses.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

INITIAL CONDITIONS

1. You are the extra NSO.
2. The Unit is in mode 1, with a normal "at power" electrical lineup.
3. Diesel Generator 1A has been running paralleled to the grid for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at 5500 KW INITIATING CUE
1. The Unit Supervisor has just directed you to shutdown the 1A Diesel Generator per BOP DG-12 from the Control Room.
2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee LOCATE and OPEN

1. Refer to BOP DG-12, Diesel BOP DG-12 Generator Shutdown Note: Step 1 may be performed at any time Cue: All prerequisites are met NOTE Cue the candidate at each plateau that the time frame has been met.
  • 2. Reduce load on the 1A DG to less At 1PM01J:

than 250 KW using DG 1A Gov Adj

  • LOWER the DG Gov Adj control. control to REDUCE load to

< 250 KW per the schedule Note: The examinee may adjust VAR in the note loading as necessary while unloading

° 4100 KW for 2 minutes the machine

° 2750 KW for 2 minutes

° 1400 KW for 15 minutes

° < 250 KW

3. Adjust reactive load to zero KVARS At 1PM01J:

using Diesel Gen 1A Volt Adj. ° ADJUST DG KVARS to Control. ZERO using the 1A DG VOLT ADJ Cue: KVARs is reduced to zero

  • 4. Open ACB _413 DG 1A Feed to At 1PM01J:

4KV Bus 141.

Open DG output breaker Cue: ACB 1413 GREEN light is LIT

  • OPEN ACB 1413 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

Comment ELEMENT STANDARD SAT UNSAT Number NOTE The following annunciator will alarm after DG output breaker is opened:

1-21-D9, DG _A RUNNING UNLOADED The diesel will continue running for 5 minutes after step 10 execution of this JPM NOTE:

The completion of BOP DG-11T1 is NOT required for this JPM.

5. Record the time ACB 1413 was opened on BOP DG-11T1

° RECORD the time ACB Cue: Use current time 1413 was opened on BOP DG-11T1 Cue: The Unit NSO will complete BOP DG-11T1 At 1PM01J:

6. VERIFY/PLACE DG 1A ACB 1413 auto re-close circuit arm selector DG ACB 1413 auto re-close switch in the NORM position. circuit arm selector switch

° VERIFY/PLACE the Auto Cue: The auto re-close circuit arm Re-close Circuit Arm selector switch is in the Selector Switch to the NORMAL position NORM position SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

Comment ELEMENT STANDARD SAT UNSAT Number Locally

7. VERIFY/PLACE the Start Mode Selector Switch at 1PL07J in FAST. Start mode selector switch:

° DIRECT NLO to Cue: The NLO reports the start mode selector switch is in FAST VERIFY/PLACE the Start Mode Selector switch in FAST at 1PL07J

8. VERIFY DG air receiver pressures Locally:

are > 175 psig prior to stopping DG Starting Air receiver pressures to ensure operability.

° DIRECT NLO to VERIFY Cue: The NLO reports the air DG starting air receiver receiver pressures are > 175 psig. pressures > 175 psig

9. VERIFY control mode selector Locally:

switch Control mode selector switch Cue: The NLO reports the control mode selector switch is in REMOTE ° DIRECT the NLO to VERIFY the Control Mode Note: The operator may check the Selector Switch is in LOCAL white light NOT LIT REMOTE

  • 10. PLACE the DG 1A Start Switch in At 1PM01J:

STOP position.

Cue: The DG start switch is in the Stop the 1A DG A/T position

  • PLACE the 1A DG Start Cue: The GREEN light is LIT Switch to STOP

° CHECK STOP light LIT SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-f (from N-006 - rev 14)

Comment ELEMENT STANDARD SAT UNSAT Number

11. Verify DG standby configuration Cue: The five minute cooldown is ° WAIT for 5 minute auto complete cooldown cycle to complete DIRECT NLO to:

Cue: The NLO reports that the DG ° VERIFY/START the DG pre-lube pump is RUNNING pre-lube pump at ~ 280 rpm Cue: The NLO reports that the DG ° REPORT when the DG has STOPPED has STOPPED Cue: The Unit NSO will complete BOP DG-11T1 Cue: This JPM is complete RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N-41 R9)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Unload and Shutdown a Diesel Generator JPM Number: CR-f Revision Number: 15 Task Number and

Title:

4C.DG-04,05 UNLOAD a DG & SHUTDOWN a DG K/A Number and Importance: 064A4.06 3.1/3.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1. BOP DG-11T1, Diesel Generator Start/Stop Log (Rev 2)
2. BOP DG-12, Diesel Generator Shutdown (Rev. 20)

CRITICAL STEPS (*) 2, 4, & 10 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-A (from N-41 R9)

INITIAL CONDITIONS

1. You are the extra NSO.
2. The unit is in mode 1, with a normal "at power" electrical lineup.
3. Diesel Generator _A has been running paralleled to the grid for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at 5500 KW.

INITIATING CUE

1. The Unit Supervisor has just directed you to shutdown the _A Diesel Generator, per BOP DG-12 from the Control Room.
2. Electric Operations has been notified and expects the DG load to be reduced and then removed from parallel operation.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Align Ventilation Systems for Emergency Operations (Failure of Fuel Handling Building Fans to Start)

JPM Number: CR-g Revision Number: 6 Date: 10/29/2011 Revised By: Bill Hochstetter 10/29/2011 Instructor Date Reviewed By: Mark Ristau 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP VA-6 Rev: 4 Procedure 2BEP-0 Rev: 202

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/29/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

Revision Record (Summary)

Revision X Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-99b

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-22 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Verify:
  • 0VA085Y closed
  • 0VA084Y open
  • 0VA086Y open
3. VC M/U Filter Unit on running VC Train
4. Place VC Recirc Charcoal Adsorber Selector Switches on BOTH trains of VC to ABSORB, allow dampers to realign, then place both switches back to AUTO
5. Start 0B and 0F VA Inaccessible Plenum Charcoal Booster Fans
6. Close FHB Pre-Filter Isolation Dampers:
a. 0VA058Y/0VA059Y
b. 0VA053Y/0VA054Y
7. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
8. Obtain Unit-2 E-0 Attachment. B binder with steps for the examinee
9. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. Unit 2 has experienced a LOCA.
3. 2BEP-0 is in progress in response to the event.

INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP-0 Attachment B.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee

1. Refer to 2BEP-0, Reactor Trip or LOCATE and OPEN Safety Injection, Attachment B step 2BEP-0 to Attachment B 6 step 6 Note: JPM step 1 may be performed at any time NOTE ALTERNATE PATH STARTS HERE JPM steps 2 through 10 verify the fuel handling building ventilation is aligned for emergency operation. The fuel handling building fans fail to start initially
2. Verify FH building ventilation aligned At 1PM02J, VERIFY
  • 0VA04CA NOT running Cue: The 0VA04CA and/or 0VA04CB AND GREEN light(s) are LIT
  • 0VA04CB NOT running
3. Refer to BOP VA-6, Fuel Handling LOCATE and OPEN BOP Building Charcoal Booster Fan VA-6 Operation Note: JPM step 10 may be performed ° at any time Cue: (if asked) The system is lined up IAW BOP VA-E3 NOTE In the following JPM steps, provide cues to the examinee based on which train is started SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 4. Place one FHB Exhaust Plenum on At 0PM02J, line VERIFY/OPEN:
  • 0VA058Y and 0VA059Y (A Cue: 0VA0__Y and 0VA0__Y open Train) lights are LIT OR
  • 0VA053Y and 0VA054Y (B Train)
5. Ensure the other trains FHB Filter At 1PM02J, VERIFY/CLOSE Flow Control damper is CLOSED. for fan NOT being started:

Cue: 0VA0__Y closed light is LIT o 0VA062Y (for A fan)

OR 0VA057Y (for B fan)

6. Verify the fan transfer switch is in remote. ° VERIFY fan transfer switch is in REMOTE Note: The student may use the Stop light (green) on the associated control switch to verify the fan is in REMOTE Cue: The EO reports that the fan transfer switch is in the REMOTE position at 0VA01JA
  • 7. Start one train of Fuel Handling At 0PM02J, START:

Building Charcoal Booster fan.

  • 0VA04CA OR Cue: 0VA04C_ RED light is LIT
  • 0VA04CB
8. Ensure FHB Filter Train Flow Control At 0PM02J, VERIFY/OPEN:

damper opens.

o 0VA057Y (for A fan)

Cue: 0VA0__Y RED light is LIT OR 0VA062Y (for B fan)

° SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b - rev 5)

Comment ELEMENT STANDARD SAT UNSAT Number

10. Ensure FHB Charcoal Adsorber Inlet At 0PM02J, VERIFY/OPEN:

Isol opens.

o 0VA060Y (for A fan)

Cue: 0VA0__Y RED light is LIT OR 0VA055Y (for B fan) 10 Ensure FHB Charcoal Adsorber At 0PM02J, VERIFY/CLOSE:

Bypass Isol damper closes.

o 0VA051Y (for A fan)

Cue: 0VA0__Y RED light is LIT OR 0VA435Y (for B fan)

Cue: (if required) This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b R5)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Align Ventilation Systems for Emergency Operation (Failure of FHB)

JPM Number: CR-g Revision Number: 6 Task Number and

Title:

4D.EP-19 RESPOND to Safety Injection Signal K/A Number and Importance: 072A3.01 2.9/3.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): BOP VA-6 Rev: 4 2BEP-0 Rev: 202 CRITICAL STEPS (*) 4 and 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-g (from N-99b R5)

INITIAL CONDITIONS

1. You are the Unit 1 Assist NSO.
2. Unit 2 has experienced a LOCA.
3. 2BEP-0 is in progress in response to the event.

INITIATING CUE You are directed to verify Fuel Handling Building ventilation is aligned for emergency operation per step 6 of 2BEP-0 Attachment B.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Establish and Secure Normal and RH Letdown flow JPM Number: CR-h Revision Number: 09 Date: 10/29/2011 Revised By: Bill Hochstetter 10/29/2011 Instructor Date Reviewed By: Mark Ristau 11/06/2011 Operations Representative Date Approved By: Rob Lawlor 11/06/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP CV-17 Rev: 25 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/29/11 SME / Instructor Date x x SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

Revision Record (Summary)

Revision 9 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-64 R8

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC-25 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Modify Remote Function RH02 to 100, to open 1RH8734B when called as EO by examinee.
3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist
4. This completes the setup for this JPM SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

INITIAL CONDITIONS

1. You are the unit NSO.
2. The plant is in MODE 4 with RHR in shutdown cooling.
3. Normal letdown is in service.
4. Train B RHR is operating with train A in stand-by.

INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP CV-17.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If this JPM is performed on the simulator, only the cues underlined are required to be provided to the examinee

1. Refer to BOP CV-17, step F.1 LOCATE and OPEN BOP CV-17 Note: May be performed at any time Cue: Prerequisites are met
2. Verify/Open _CV460 At 1PM05J:

Cue: _CV460 GREEN light is LIT VERIFY/OPEN _CV460

3. Verify/Open _CV459 At _PM05J:

Cue: _CV459 GREEN light is LIT. ° VERIFY/OPEN _CV459

4. Verify/Open _CV8389A/B At _PM05J:

Cue: _CV8389A/B open lights are LIT VERIFY/OPEN

_CV8389A/B

5. Verify/Open _CV8160 At _PM05J:

Cue: _CV8160 open light is LIT VERIFY/OPEN _CV8160

6. Verify/Open _CV8149A/B/C At _PM05J:

Cue:_CV8149 and B open lights are ° VERIFY/OPEN LIT _CV8149A/B/C At _PM05J:

7. Verify RH letdown control valve position

° VERIFY/REDUCE _CV128 demand to 0%

Cue:_CV128 DEMAND = 0%

  • 8. Align RH letdown flowpath Cue: Operator reports _RH8734B is
  • DISPATCH operator to OPEN locally open _RH8734B SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

Comment ELEMENT STANDARD SAT UNSAT Number At _PM05J:

  • 9. Place _CC130 to Manual at 40%
  • PLACE _CC130A/B in MANUAL and ADJUST Cue: _CC130 MANUAL light is LIT demand to 40%

and demand is at 40%

At _PM05J:

  • 10. Place _CV131 to Manual at 40%
  • PLACE _CV131 in Cue: _CV131 MANUAL light is LIT MANUAL and ADJUST and demand is at 40% demand to 40%

At _PM05J:

11. Place the _CV129 to VCT PLACE _CV129 to the VCT Cue:_CV129 is in VCT position position At _PM05J:
12. Adjust _LK-112 Cue: Degassing is not required o ADJUST _LK-112 pot setting to 7.3 Cue: _LK-112 pot is at 7.3 AND Cue: _LK-112 AUTO light is LIT PLACE _LK-112 in AUTO
13. Place _CV112A in Auto At _PM05J:

Cue: _CV112A is in AUTO PLACE _CV-112A in AUTO

  • 14. Establish RH Letdown Flow At _PM05J:

Cue: _CV-128 is THROTTLED OPEN

  • OPEN/THROTTLE _CV-128 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

Comment ELEMENT STANDARD SAT UNSAT Number

  • 15. Adjust RH Letdown Flow At _PM05J:
  • ADJUST _CV131 in Cue:_FT-131 = 55 gpm manual to obtain desired flow
16. Place _CV131 in Auto, if required At _PM05J:

Cue: _CV131 is in AUTO PLACE _CV131 in AUTO, IF required

17. Adjust letdown temperature At _PM05J:

NOTE: Degassing is not in progress ADJUST _CC130A/B to obtain ~ 110°F Cue: _TI-130 = 110°F At _PM05J:

18. Establish auto temperature control PLACE _CC130 in AUTO Cue:_CC130 AUTO light is LIT At the RM-11:
19. Verify letdown radiation monitor in service VERIFY/PLACE _RE-PR006 in service per BOP AR/PR-1 Cue: An extra NSO has placed _RE-PR006 in service
  • 20. Isolate normal letdown flowpath At _PM05J:

Cue: _CV8152 RED light is LIT

  • CLOSE _CV8152 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N rev 8)

Comment ELEMENT STANDARD SAT UNSAT Number

21. Align _CV129 for RCS cleanup At _PM05J:

PLACE _CV129 in the proper Cue: Place _CV129 is in DEMIN position for RCS position to allow continued cleanup. cleanup Cue: _CV129 is in DEMIN position Cue: (if required) This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N-64 R8)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Establish and Secure Normal and RH Letdown JPM Number: CR-h Revision Number: 09 Task Number and

Title:

4C.CV-16 ESTABLISHING and SECURING Normal and RH Letdown flow.

K/A Number and Importance: 005 2.1.23 4.3/4.4 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOP CV-17 Rev. 25 CRITICAL STEPS (*) 8, 9, 10, 14, 15, & 20 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

CR-h (from N-64 R8)

INITIAL CONDITIONS

1. You are the unit NSO.
2. The plant is in MODE 4 with RHR in shutdown cooling.
3. Normal letdown is in service.
4. Train B RHR is operating with train A in stand-by.

INITIATING CUE The US directs you to establish 55 gpm letdown from RH and secure normal letdown per BOP CV-17.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Operate the Fire Detection/Alarm Equipment (without control power)

JPM Number: IP-i Revision Number: 07 Date: 10/30/2011 Revised By: Bill Hochstetter 10/30/2011 Instructor Date Reviewed By: Brian Lewin 11/6/2011 Operations Representative Date Approved By: /s/ Rob Lawlor 11/6/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP FP-22 Rev: 6 Procedure BOP FP-22A20 Rev: 0 Procedure BOP FP-22A25 Rev: 0

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 10/30/11 SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Revision Record (Summary)

Revision 7 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-49a R6

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

INITIAL CONDITIONS

1. You are an Equipment Operator.
2. A fire exists in the _B Diesel Generator room as determined by an alarm at

_PM09J and local report.

3. Automatic actuation of CO2 to the _B Diesel Generator room has failed.

INITIATING CUE The Fire Chief directs you to manually initiate CO2 to the _B Diesel Generator room using BOP FP-22.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer to BOP FP-22, Manual ° LOCATE and OPEN BOP ___ ___ ___

Operation of the Carbon FP-22 Dioxide and Halon Fire Suppression Systems CUE All prerequisites have been met NOTE: Provide the examinee with a copy of BOP FP-22.

2. Refer to Section G to determine DETERMINE attachment: ___ ___ ___

attachment

° FP-22A20 for DG 1B

° FP-22A25 for DG 2B CUE (if requested) The detection zone in alarm is _D-71 Note: (If requested), local panel has control power indication NOTE: Provide the examinee with a copy of FP-22A20 for DG 1B OR FP-22A25 for DG 2B as appropriate.

3. Request MCR to contact REQUEST Center Desk to: ___ ___ ___

Security

° Call Security to ensure room clear of personnel CUE Security has verified the room is clear of personnel NOTE: This is a prerequisite, and was met in JPM step 1.

4. Request a page announcement. REQUEST Center Desk to: ___ ___ ___

° Page plant for pending initiation CUE Page announcement has been made

5. Verify open CO2 block valve. ° VERIFY/OPEN _CO5022B ___ ___ ___

CUE _CO5022B is PARALLEL to the piping (OPEN)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Comment ELEMENT STANDARD SAT UNSAT Number

6. Verify Abort Switch not in Abort. VERIFY _HS-CO004 NOT in ___ ___ ___

ABORT CUE HS-CO004 is NOT in ABORT

7. Pull down the CO2 push button PULL DOWN cover for: ___ ___ ___

station cover. _HS-CO002 OR

_HS-CO003 CUE HS-CO002 button cover is DOWN OR CUE HS-CO003 button cover is DOWN CUE (if asked) The red light associated with the button is off NOTE: Alternate path initiated in the following step.

DEPRESS CO2 button:

8. Locally actuate system ___ ___ ___

_HS-CO002 OR

_HS-CO003 CUE HS-CO002 button is DEPRESSED OR CUE _HS-CO003 button is DEPRESSED

9. Verify system actuates locally. At _CO03J: ___ ___ ___

° Verify CO2 System Actuated light LIT CUE The CO2 System Actuated light is NOT LIT on _CO03J NOTE: If the examinee elects to try the other push button - repeat this cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Comment ELEMENT STANDARD SAT UNSAT Number

10. Verify alarm received on VERIFY: ___ ___ ___

_PM09J.

° Suppression alarm on

_PM09J CUE The Unit NSO reports that the suppression alarm was NOT received on _PM09J NOTE: If the examinee elects to try the other push button - repeat this cue.

11. Determine manual initiation ° PROCEED to step B.1 ___ ___ ___

without control power is required

  • 12. Open the Master EMPC. VERIFY/OPEN: ___ ___ ___
  • 0CO09J CUE 0CO09J actuator lever is in the OPEN position
13. Verify open CO2 block valve. VERIFY/OPEN: ___ ___ ___

° _CO5022B CUE _CO5022B is PARALLEL to the piping (OPEN)

NOTE: _C05022B was previously verified open (JPM step 5)

  • 14. Break glass on _CO03JB
  • BREAK glass cover on ___ ___ ___

_CO03JB CUE The glass cover has been broken on _CO03JB

  • 15. Actuate using EMPC actuator
  • PLACE actuator lever for ___ ___ ___

lever _CO03JB in OPEN

  • NOTE time CUE _CO03JB actuator lever is in the OPEN position CUE Use current time SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a - rev 6)

Comment ELEMENT STANDARD SAT UNSAT Number

16. Verify alarm received on VERIFY: ___ ___ ___

_PM09J.

° Suppression alarm on

_PM09J (_S-37)

CUE The Unit NSO reports that the suppression alarm _S-37 was received on _PM09J

  • 17. Terminate CO2 WHEN 1 minute for 1B DG OR ___ ___ ___

1 minute and 40 seconds for 2B DG has passed, THEN:

  • PLACE _CO03JB actuator lever in CLOSE CUE (If the 1B DG, then) 1minute has passed CUE (If the 2B DG, then) 1minute and 40 seconds has passed CUE The _CO03JB actuator lever is in the CLOSED position NOTE:
  • 18. Close CO2 block valve. CLOSE: ___ ___ ___

° _CO5022B CUE _CO5022B is PERPENDICULAR to the piping (CLOSE)

CUE This JPM is completed JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a R6)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Operate the Fire Detection/Alarm Equipment (without control power)

JPM Number: IP-i Revision Number: 07 Task Number and

Title:

4C.FP-02 OPERATE the Fire Detection/Alarm equipment.

K/A Number and Importance: 086A2.04 3.3/3.9 Suggested Testing Environment:: Simulator Control Room In-Plant Other Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BOP FP-22, Manual Operation of the CO2 and Halon Fire Suppression Systems (Rev 6)

BOP FP-22A20, Manual Initiation of CO2 to 1B Diesel Generator Room (Rev. 0)

BOP FP-22A25, Manual Initiation of CO2 to 2B Diesel Generator Room (Rev. 0)

CRITICAL STEPS (*) 12, 14, 15, 17, & 18 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-i (from N-49a R6)

INITIAL CONDITIONS

1. You are an Equipment Operator.
2. A fire exists in the _B Diesel Generator room as determined by an alarm at

_PM09J and local report.

3. Automatic actuation of CO2 to the _B Diesel Generator room has failed.

INITIATING CUE The Fire Chief directs you to manually initiate CO2 to the _B Diesel Generator room using BOP FP-22.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Perform a Local Emergency Start of the 1B AF pp using BOA ELECT-5, Attachment D.

JPM Number: IP-j Revision Number: 08 Date: 11/02/2011 Revised By: Bill Hochstetter 11/02/2011 Instructor Date Reviewed By: Brian Lewin 11/6/2011 Operations Representative Date Approved By: /s/ Rob Lawlor 11/6/2011 Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOA ELEC-5 att. D Rev: 101 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Bill Hochstetter (Signature on file) 11/02/2011 SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

Revision Record (Summary)

Revision 8 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Validated 11/06/11 by Bill Hochstetter and Rob Lawlor, only change was procedure rev that did not affect JPM.

Created from JPM No. N-56 Rev. 7 Specified to use on Unit 1 only.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

INITIAL CONDITIONS

1. You are a Non-Licensed Operator.
2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
3. The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.

INITIATING CUE The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC-5, Attachment D Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Locate the 1B AF pump. On 383 Aux Bldg:

Note: Provide the Candidate with a LOCATE _B AF pump.

copy of 1 or 2BOA ELEC-5, Attachment D.

NOTE Double Hearing Protection will be required prior to room entry. Ensure double hearing protection is available.

JPM steps 2 and 3 may be performed in any order

2. Verify/Start associated Aux Lube Oil Pump. Inside pp room 383 L15 (U-1)

Cue: Aux Lube Oil Pump CS is in the Inside pp room 383 L18 (U-2)

START position.

VERIFY/START _B Aux Lube Oil Pump

3. Verify/Start Gearbox Lube Oil Pump. Inside pp room 383 L16 (U-1)

Cue: Gearbox Lube Oil Pump CS is Inside pp room 383 L19 (U-2) in the START position.

VERIFY/START _B Gearbox Lube Oil Pump

  • 4. Place ENGINE START Switch to At _AF01J:

MAN.

  • PLACE Engine Start Switch Cue: ENGINE START Switch is in to MAN MAN.
5. Verify Diesel Air Box Trip reset. At _AF01J Cue: Air Box Trip Annunciator is CHECK Diesel Air Box NOT LIT. Trip reset SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N rev 7)

Comment ELEMENT STANDARD SAT UNSAT Number

6. Momentarily depress the RESET At _AF01J:

button.

Cue: Reset pushbutton depressed DEPRESS and and released RELEASE the Reset button

  • 7. Start the _B AF Pump.

At _AF01J:

Cue: The ENGINE RUNNING light is LIT.

  • DEPRESS the Start button.

Note: engine should start within 60 seconds VERIFY the Engine Running Light is lit

8. Monitor _B AF pump operation.

Cue: AF-7T1 will be completed by PERFORM BOP AF-7T1 another NLO who will monitor the pump.

Cue: (if required) This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N-56 R7)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Local Emergency start of the _B AF pump JPM Number: IP-j Revision Number: 08 Task Number and

Title:

4D.OA-35 Establish Emergency Control of Safe Shutdown Equipment K/A Number and Importance: 061.2.1.30 4.4/4.0 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOA ELECT-5 att. D Rev: 101 CRITICAL STEPS (*) 4 & 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

IP-j (from N-56 R7)

TASK CONDITIONS:

2. You are a Non-Licensed Operator.
2. The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
3. The 1A AF pump is OOS for maintenance and the 1B AF pump did not automatically start, and will not manually start with the MCR switch.

INITIATING CUES:

The Shift Manager has just directed you to initiate a local emergency start of the 1B AF pump using BOA ELEC-5, Attachment D.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Instrument Bus Inverter Startup JPM Number: IP-k Revision Number: 11 Date: 9/17/2009 Revised By: Bill Hochstetter

  • 11/01/2011 Instructor Date Validated By: Brian Lewin
  • 11/06/2011 SME or Instructor Date Approved By: Rob Lawlor
  • 11/06/2011 Training Department Date
  • Signature on File SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 10

IP-k - rev 11 From N-32 R11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure BOP IP-1 Rev: 14 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Brian Clark (Signature on file) 9/18/09 SME / Instructor Date Lynn Sanders (Signature on file) 9/18/09 SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 10

IP-k - rev 11 From N-32 R11 Revision Record (Summary)

Revision 11 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Added statement concerning critical step Added photos of panels SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10

IP-k - rev 11 From N-32 R11 INITIAL CONDITIONS

1. You are an Equipment Operator.
2. The unit is at 65% power.
3. The unit has experienced a loss of Instrument Bus _11 due to failure of Instrument Inverter _11.
4. All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
5. Instrument Bus _11 is currently energized from the constant voltage transformer

(_IP01E).

INITIATING CUE

1. The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP-1.
2. An Equipment Operator is standing by at MCC _31X2.
3. All prerequisites associated with any critical step are met.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 10

IP-k - rev 11 From N-32 R11 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer to BOP IP-1 ° LOCATE and OPEN BOP IP-1 Cue: (If requested) No instrument channels are in a tripped condition and the control room has reviewed

_BOA Elec-2.

Cue: Prerequisites are met

2. VERIFY On Inverter Fan _IP09E. At _IP09E:

Cue: Inverter fan switch is in ON ° VERIFY/PLACE Inverter or the ORANGE light is lit Fan _IP09E ON

  • 3. VERIFY/CLOSE Inverter AC feed Close Inverter AC feed breaker.

breaker at MCC _31X2 Cub. C2.

  • DIRECT EO to CLOSE AC Cue: EO reports that feed breaker feed breaker at _31X2 cub

_31X2 cub C2 is CLOSED C2

  • 4. VERIFY/CLOSE Inverter DC feed Close Inverter DC feed breaker, at 125 VDC Distribution breaker.

Panel _11 BF1, CKT 1.

° LOCATE 125 VDC Note: Located 451 elevation Distribution Panel _11 BF1 MEER.

  • CLOSE 125 VDC Cue: DC feed breaker at 125 VDC Distribution Panel _11 BF1 panel _11 BF1, Ckt #1 is to the Breaker, ckt 1 RIGHT (CLOSED)
  • 5. CLOSE Battery input breaker 2CB At Inverter _IP05E:

Note: Located 451 elevation MEER ° LOCATE Instrument Inverter _11 (_IP05E)

Cue: Battery input breaker 2CB is in the UP position (ON)

  • CLOSE Battery Input Bkr 2CB on the inverter NOTE The pre-charge pushbutton should not be released until DC Input Breaker, 3CB, is closed SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 10

IP-k - rev 11 From N-32 R11 Comment ELEMENT STANDARD SAT UNSAT Number

  • 6. DEPRESS and HOLD pre-charge At _IP05E:

button 1PB for at least 15 seconds

  • DEPRESS and HOLD Pre-charge 1PB button Cue: The Pre-charge 1PB button for at least 15 seconds has been DEPRESSED and HELD for at least 15 seconds If asked: Output volts indicate > 110 on volt meter.
  • 7. CLOSE DC input breaker 3CB At _IP05E:

Cue: DC Input Breaker 3CB is in

  • CLOSE DC Input Breaker the UP position (ON) 3CB on the inverter
8. Release pre-charge button 1PB At _IP05E:

Cue: The Pre-charge 1PB button ° RELEASE Pre-charge has been RELEASED 1PB button

9. VERIFY AC output voltage At _IP05E, on 2VM:

greater than 110 V

° VERIFY output voltage Cue: AC voltmeter indicates 119V greater than 110V (or as indicated)

  • 10. CLOSE AC output breaker 4CB At _IP05E:

Cue: AC Output Breaker 4CB is in

  • CLOSE AC Output Brkr the UP position (ON) 4CB on the inverter
11. Establish communications with ° Establish communications Unit NSO with Unit NSO Cue: The Unit NSO has been contacted and directs you to proceed NOTE: The AEER is a No Radio Zone
12. PLACE Rod Control in MANUAL ° Request NSO/ US to place at discretion of US. Rod Control in MANUAL if desired.

Cue: Rod Control is in MANUAL SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 10

IP-k - rev 11 From N-32 R11 Comment ELEMENT STANDARD SAT UNSAT Number NOTE The examinee may verify that the CAUTION prior to step F.1.m is met, if the MCR is contacted give the following cue:

Cue: 1) The SR and IR trips are blocked and/or

2) No instrument channels are in a tripped condition If asked about the critical step give the following cue:

Cue: All prerequisite requirements associated with the critical step have been met.

(This includes an SRO present, and US permission)

Note:

The examiner may way to use the attached picture of the Instrument bus and have the examinee explain the operation, rather than opening the panel.

13. PLACE Reserve AC feed breaker At 120 VAC Instr Panel _11:

to OFF

° PLACE the RESERVE AC Cue: RESERVE AC feed breaker is feed breaker to OFF to the LEFT (OFF position)

14. PLACE NORMAL/RESERVE feed At 120 VAC Instr Panel _11:

breaker interlock bar in a position to allow operation of the NORMAL AC Feed Breaker ° PLACE the NORMAL/RESERVE feed Cue: Interlock bar is in a postion brkr interlock bar in to allow NORMAL AC feed breaker position to allow for is operation operation of NORMAL AC feed breaker

  • 15. Place Normal AC feed breaker to At 120 VAC Instr Panel _11:

ON

  • PLACE the NORMAL AC Cue: The normal AC feed breaker feed breaker to the ON is to the LEFT (ON position) position
16. VERIFYN41 energized at _PM02J ° CONTACT Unit NSO to Cue: The Unit NSO confirms that verify N41 is energized N41 is ENERGIZED SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 10

IP-k - rev 11 From N-32 R11 Comment ELEMENT STANDARD SAT UNSAT Number

17. RESET N41 Positive Rate Trip as ° CONTACT Unit NSO to required. verify N41 positive rate trip is reset.

Cue: The Unit NSO confirms that N41 Positive Rate Trip is RESET

18. CLOSE Rectifier AC input breaker At _IP05E:

1CB

° CLOSE Rectifier AC Cue: The rectifier AC input breaker INPUT Brkr 1CB 1CB is in the UP position (ON)

19. PLACE Rod Control in AUTO at ° Request NSO/ US to place discretion of US. Rod Control in AUTO if desired.

Cue: Rod Control is in AUTO

20. PLACE Instrument Bus _11 ° LOCATE Inverter transformer Input breaker in OFF Transformer _IP01E position.

° PLACE the Instrument Bus Note: Located 451 elevation MEER _11 Transformer Input breaker at _IP01E to OFF Cue: Transformer input breaker at

_IP01E is in the DOWN position (OFF)

Cue: This JPM is complete RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 10

IP-k - rev 11 From N-32 R11 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Instrument Bus Inverter Startup JPM Number: IP-k Revision Number: 11 Task Number and

Title:

4D.OA-22 RESPOND to a Loss of Vital AC Electrical Instrument Bus.

K/A Number and Importance: 057 AA1.01 3.7/3.7 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

BOP IP-1, Instrument Bus Inverter Startup (Rev. 14)

CRITICAL STEPS (*) 3, 4, 5, 6, 7 10, & 15 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

IP-k - rev 11 From N-32 R11 INITIAL CONDITIONS

1. You are an Equipment Operator.
2. The unit is at 65% power.
3. The unit has experienced a loss of Instrument Bus _11 due to failure of Instrument Inverter _11.
4. All maintenance is completed on Instrument Inverter _11 and the Clearance Order Tags have been removed.
5. Instrument Bus _11 is currently energized from the constant voltage transformer

(_IP01E).

INITIATING CUE

1. The Unit Supervisor directs you to startup Instrument _11 Inverter _IP05E and to transfer Instrument Bus _11 power to the inverter per BOP IP-1.
2. An Equipment Operator is standing by at MCC _31X2.
3. All prerequisites associated with any critical step are met.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10