ML13295A403

From kanterella
Revision as of 20:22, 21 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
DC Cook Emergency LAR Draft RAI Revision 1
ML13295A403
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/08/2013
From: Thomas Wengert
Plant Licensing Branch III
To: Etheridge H
American Electric Power
Wengert T
References
Download: ML13295A403 (2)


Text

Wengert, Thomas From: Sent: To: Cc:

Subject:

Attachments:

Helen, Wengert, Thomas Tuesday, October 08, 2013 5:59 PM . hletheridge@aep.com

  • 'mkscarpello@aep.com' (mkscarpello@aep.com)

DC Cook Emergency LAR Draft RAI Revision 1 D.C. Cook Draft RAI Rev 110-8-B.pdf As clarified during this afternoon's conference call, I have revised the typographical error in RAI 4. Please see attached Revision 1 of the RAI set for the subject LAR. Call me if you have any questions

.. _ Regards, Tom Wengert Project Manager NRRIDORLILPL3-1 (301) 415-4037 1 D.C. Cook Emergency License Amendment Request Request for Additional Information

-Revision 1 Containment and Ventilation Systems Branch (SCVB) 1. Section 3.3 states that a modification is to be installed during the next refueling outage in Fall2014.

When was this modification initiated?

When was it initially scheduled for installation?

Was it ever deferred from a previous outage? 2. Section 3.2 second paragraph states "Radiation and high access that would allow visual observation or repair of re hazards precluded A and Train B lower igniters A35." Citing this in strings powered by Phase 3, except for Train A exception for igniter A35, could it be energized a for the "glow" and perhaps determine if it is the would verify that Regions 12, 13, 14, 15 & 1 determining if Condition .B is actually met? nt entry made to observe it n phase 3 igniter which ble igniter thus Tech Spec Branch The LAR states: "The proposed TS Mode 1 until the affected ignitors can be preferable to the transient that wou 3. 4. rcrTl<>nT of the affected safety hazards. end cycle 25, explain why the in your response to RAI #3 to facilitate ing to power operation. , . Surveillance ifli7!:1tif.1'n, or in to assure that the necessary quality of at facility operation will be within safety limits, and met." 5. cification changes would allow a relaxation of the ition A, Required Action A.2 Completion Time from once per 7 -days to the SR Frequency of 184 days . . l'J..,.,il..,U ignitor failure mechanism (operation at excessive voltage) and the method of (TS Surveillance testing), explain how the relaxation of testing of the Operable DIS Train provides assurance that the LCO is met. 6. Footnote 2 on proposed TS page 3.6.9-2 appears to be incomplete (Regions 15 and 16 are not addressed).

Confirm.