MONTHYEARML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-020, Submittal of Annual Report of Changes in Emergency Core Cooling System Models2019-04-0808 April 2019 Submittal of Annual Report of Changes in Emergency Core Cooling System Models ML19094B0782019-04-0303 April 2019 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2018-021, Submittal of 2017 Annual Non-Radiological Environmental Operating Report2018-04-20020 April 2018 Submittal of 2017 Annual Non-Radiological Environmental Operating Report PNP 2018-022, Annual Report of Changes in Emergency Core Cooling System Models2018-04-0909 April 2018 Annual Report of Changes in Emergency Core Cooling System Models ML18347B2982018-04-0303 April 2018 1997 Annual Non-Radiological Environment Operating Report ML18347B2992018-04-0303 April 2018 1996 Annual Non-Radiological Environmental Operating Report PNP 2017-060, Report of Changes, Tests and Experiments and Summary of Commitment Changes2017-10-12012 October 2017 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2017-023, Annual Report of Changes in Emergency Core Cooling System Models2017-05-24024 May 2017 Annual Report of Changes in Emergency Core Cooling System Models PNP 2016-030, Annual Report of Changes in Emergency Core Cooling System Models2016-04-20020 April 2016 Annual Report of Changes in Emergency Core Cooling System Models PNP 2015-082, Report of Changes, Tests and Experiments and Summary of Commitment Changes2015-10-14014 October 2015 Report of Changes, Tests and Experiments and Summary of Commitment Changes CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report2013-04-23023 April 2013 Submittal of 2012 Annual Non-Radiological Environmental Operating Report PNP 2013-031, Report of Changes in Emergency Core Cooling System Models2013-04-11011 April 2013 Report of Changes in Emergency Core Cooling System Models CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report2011-04-26026 April 2011 Submittal of 2010 Annual Non-Radiological Environmental Operating Report ML1011900842010-04-28028 April 2010 Submittal of 2009 Annual Non-radiological Environmental Operating Report ML0914002032009-05-20020 May 2009 Submittal of Annual Report of Changes in Emergency Core Cooling System Models and 30-Day Report for Large and Small Break LOCA ML0913406782009-05-14014 May 2009 Submittal of 2008 Radiological Environmental Operating Report ML1011600472009-04-29029 April 2009 2008 Annual Radioactive Effluent Release and Waste Disposal Report (Attached) ML0910602482009-04-15015 April 2009 Annual Non-Radiological Environmental Operating Report CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2009-04-13013 April 2009 Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ML0810805412008-04-17017 April 2008 2007 Nonradiological Environmental Operating Report ML0809804222008-04-0707 April 2008 Generator Tube Inspection Report ML0617301082006-06-21021 June 2006 Annual Report of Changes in Emergency Core Cooling System Models ML0435102052004-12-0808 December 2004 Annual Report of Changes in Emergency Core Cooling System Models ML18347A5031995-09-11011 September 1995 1994 Annual Report of Facility Changes, Tests and Experiments. ML18347B1911986-04-15015 April 1986 1985 Radiological Environmental Monitoring Report 2022-04-14
[Table view] Category:Letter type:PNP
MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] |
Text
PNP 2018-021 April 20, 2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert. MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager
Subject:
2017 Annual Non-Radiological Environmental Operating Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Dear Sir or Madam:
Entergy Nuclear Operations, Inc (ENO) is providing the Palisades Nuclear Plant (PNP) Annual Non-Radiological Environmental Operating Report for 2017. This report was prepared in accordance with the PNP Renewed Facility Operating License, Appendix 8, section 5.4.1. The attached report describes the implementation of the Environmental Protection Plan from January 1,2017, through December 31,2017. This letter contains no new commitments and no revisions to existing commitments.
Sincerely, JAH/bed
Attachment:
- 1. 2017 Annual Non-Radiological Environmental Operating Report 2. Herbicide and Pesticide Treatments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC ATTACHMENT 1 2017 ANNUAL NON*RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT
1.0 BACKGROUND
Appendix B of the Renewed Facility Operating License for the Palisades Nuclear Plant (PNP) requires the submittal of an annual environmental operating report to the Nuclear Regulatory Commission (NRC), describing the implementation of the Environmental Protection Plan (EPP) during the previous year. The reporting period is January 1, 2017, through December 31 , 2017. The PNP operated for 8,001.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and produced a net total of 6,097,497 MWHe during 2017. This represents 86.2% of the net demonstrated capacity of the design electric rating of 805 MWe. 2.0 ENVIRONMENTAL IMPACT EVALUATIONS During 2017 there were no significant changes that warranted new environmental reviews per Entergy Nuclear Operations, Inc. (ENO) procedure, EN-EV-115, "Environmental Reviews and Evaluations." There were three projects that underwent the Environmental Review process in accordance with EN-EV-115 during 2016, although a majority of the work actually took place in 2017. The reviews were previously discussed in the 2016 report. The three Englneering Changes (ECs) are as follows: Engineering Change, EC-61195, was performed for E-30B cooling tower replacement to be performed during the refueling outage commencing in April 2017. This change modified the design of the cooling tower. The new tower is a like-for-like change with respect to operation and flow volume, but operates more efficiently given the new technology.
All land disturbances had permits in place regarding impacts on critical dune areas. Environmental preparations for this tower replacement were consistent with those that occurred for the E-10A tower in 2012. This EC and work was completed in July 2017. There were two permits required for the work; A Critical Dune Permit from the State of Michigan and a Soil Erosion Permit from Van Buren County. Following the work, all required restoration was completed and reviewed by the MDEQ and the permits were closed out. Engineering Change, EC-61200, was performed for the relocation of the cooling tower E-30B oil collection building and tanks to support the cooling tower replacement.
This change required minor modifications to the site Spill Prevention Controls and Countermeasures
/ Pollution Incident Prevention Plan (SPCC-PIPP) due to a slightly larger volume and a new secondary containment configuration.
This activity was completed as scheduled during the E-30B cooling tower replacement.
Engineering Change, EC-64377, was performed for excavation and concrete placement near an existing transformer pad outside of the protected area. This excavation was for a new transformer pad and containment pit for oil from three transformers.
The spare transformer area has a sloped area to the South that will prevent flooding or changes to the runoff of the area. Secondary containment is provided for all transformers per required volume including ATTACHMENT 1 2017 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT rainwater per Technical Paper No. 40 -Rainfall Frequency Atlas of The United States. Operations monitoring and drainage requirements are met per PNP SPCC/PIPP.
Pad and containment design included water stops, epoxy sealer, and angle curb to prevent release. This activity was completed in 2017. There were no additional changes, tests, or experiments that involved un-reviewed environmental questions or EPP changes. 3.0 ADDITIONAL ACTIVITIES AUTHORIZED UNDER NPDES The "8" cooling tower was replaced in 2017 using the same design as the "A" Cooling Tower that was replaced in 2012 and aligns with industry best practices.
No additional activities were authorized under the National Pollutant Discharge Elimination System (NPDES) permit. 4.0 UNUSUAL ENVIRONMENTAL EVENTS A NPDES Permit thermal discharge exceedance was identified during the data review process. The exceedance took place on April 9, 2017, and was attributed to less evaporative losses during the securing of the "8" cooling tower for replacement.
Upon discovery of the exceedance, which took place for less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the thermal' discharge values were returned within permit limits within the shift. The State of Michigan was notified of the exceedance through routine monthly reporting.
PNP was not given any findings or Notice of Violations from the State of Michigan for this event. 5.0 ENVIRONMENTAL MONITORING Documentation of the effect of cooling tower operation on meteorological variables was required for two years following the conversion from the once-through cooling system to the cooling towers. 8ecause the cooling towers have been in operation for 40 years, meteorological monitoring and other monitoring activities related to the cooling towers were not required during 2017. TruGreen treated areas of the property for vegetation management during 2017. Rose Pest Solutions treated areas of the property for tick and pest control. Herbicides were not applied to the transmission line exit corridor in 2017. The application of herbicides and pesticides is documented in Attachment
- 2. 6.0 NON-ROUTINE REPORTS During 2017, no non-routine reports were generated.
One notification was made as described in Section 4.0.
ATTACHMENT 2 HERBICIDE
& PESTICIDE TREATMENTS Company: TruGreen 9077 Portage Industrial Portage, Michigan 49024-9935 Date of Treatment:
April 28, 2017 April 28, 2017 June 9,2017 June 14, 2017 July 26, 2017 July 26, 2017 August 28,2017 September 25,2017 November 1,2017 November 1,2017 (495 pounds applied) (0.62 gallons applied)*
(49.5 gallons applied)*
(76.3 gallons applied)*
(495 pounds applied) (0.16 gallons applied)*
(68.03 gallons applied)*
(68.03 gallons applied)*
(495 pounds applied) (0.16 gallons applied)*
- Liquid volumes are the active chemicals used and do not include the dilution water. Commercial Names of Products in Solution:
Tru Power 3, Razor Pro, Barricade, tripower Chemical Names of Products:
Tru power 3-Triisopropanolamine Salt of 2, 4-Dichlorophenoxyacetic Acid, Dimethylamine Salt of (+)-R-2-(2-Methyl-4-Chlorophenoxy) propionic acid, Dicamba Acid Razor Pro: -Glyphosate, N(phosphonomethly) glycine, in the form of its isoprophlamine salt, Ethoxylated Tallowamines Barricade-
-Attapulgite Clay, Crystalline Silica, Quartz, Propylene Glycol, Prodiamine Tripower:
Dimethyliamine salt of 2-methyl 4-chloicophenoxy acid, Dimethalyne salt of (+)-R-2-(2-methl-4-chlorophynoxy)proprionic acid, Dimethylamine salt of Dicamba (3,6-Dichloro-o-anisic acid) 17-0-5 UBM: Urea Based Fertilizer Mix, Liquid Fertilizer wI Slow release Nitrogen 28-0-0 NBNX: Liquid slow-release fertilizer Concentration of Active Ingredient in Field Use Mix: One solution was mixed together that contained the following:
50 oz. per 44 gallons per acre (Tru Power 3) applied to 3.75 acres Page 1 of 4 ATTACHMENT 2 HERBICIDE
& PESTICIDE TREATMENTS Diluting Substance:
Water for wet applications No dilutions for dry applications Rate of Application:
44 gallons per acre liquid application (Tru power 3, Tripower, Barricade, Razor Pro) 132 Ibs per acre applied of dry fertilizer Total Amount Used: 263 Gallons total volume used for liquid treatment*
1485 Pounds total volume used for dry treatment
- Liquid volumes are the active chemicals used and do not include the dilution water. Method of Application:
Hand sprayer for liquids Broadcast spreader for dry application Frequency of Application:
Throughout the year as needed Location:
Along and near roadways, fence lines, walkways, parking lots, containment areas, substations, cooling towers, protected area, and microwave zones. Purpose of Treatment:
Fertilizer, control of weed species, crabgrass, nuisance vegetation, nuisance broad leaf vegetation Page 2 of4 ATTACHMENT 2 HERBICIDE
& PESTICIDE TREATMENTS Company: Rose Pest Solutions 2714 South 11 th St. Ste B Niles, Michigan 49120-4420 Date of Treatment:
Jan 9,2017 Jan 23, 2017 Feb 2,2017 Feb 27,2017 Mar 13,2017 Mar 27,2017 April 1 0, 2017 April 24, 2017 May 8,2017 May 22,2017 June 12, 2017 June 26, 2017 July 10, 2017 July 24, 2017 August 14, 2017 August 18, 2017 September 11, 2017 September 25, 2017 October 9, 2017 October 23, 2017 November 13, 2017 November 27, 2017 December 11, 2017 December 18, 2017 (20 grams applied) (280 grams applied) (120 grams applied) (520 grams applied) (60 grams applied) (480 grams applied) (200 grams applied) (520 grams applied) (80 grams applied) (320 grams applied) (160 grams applied) (380 Grams applied) (240 Grams applied) (460 grams applied) (280 grams applied) (540 grams applied) (360 grams applied) (360 grams applied) (120 grams applied) (120 grams applied) (167 grams applied) (400 grams applied) (80 grams applied) (380 grams applied) Commercial Names of Products in Solution:
Final all-Weather Blox and Ovo Control P Chemical Names of Products:
Final AW Blox -Brodifacoum
[3-[3-( 4'-Bromo-[1, 1 '-biphenyl] yl)-1 ,2,3,4-tetrahydro-1-naphthalenyl]-4-hydroxy-2H-1-benzopyran-2-one]
Ovo Control P -Nicarbazine
[4,4'-Dinitrocarbanilide and 2-Hydroxy-4,6-dimethyl pyrimidine]
Page 3 of 4 ATTACHMENT 2 HERBICIDE
& PESTICIDE TREATMENTS Concentration of Active Ingredient in Field Use Mix: One solution was mixed together that contained the following:
N/A Diluting Substance:
No dilutions for dry applications Total Amount Used (active ingredient amounts):
6647 Grams total volume used for dry treatment Method of Application:
Bait Station Installation for dry application Frequency of Application:
Throughout the year as needed Location:
Along and near roadways, fence lines, walkways, and the protected area. Purpose of Treatment:
Tick, Mice and Roach control; and Ovo Control P for reducing the pigeon egg hatch on site. Page 4 of 4