ML18226A256
From kanterella
Revision as of 22:35, 12 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Draft Approval | |
---|---|
Initiation
Administration Questions
| |
MONTHYEARTSTF-17-19, TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2018-04-27027 April 2018
[Table View]TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Project stage: Other ML18226A3192018-09-20020 September 2018 Cover Letter Transmitting Draft SEs of TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. Project stage: Draft Approval ML18226A2562018-09-20020 September 2018 Draft SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 1 Project stage: Draft Approval ML18226A3182018-09-20020 September 2018 Draft Model SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 2 Project stage: Draft Other ML18226A3272018-09-20020 September 2018 Draft SEs of Traveler TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) Project stage: Request TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2018-10-12012 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. Project stage: Draft Other ML18333A1442018-12-0404 December 2018 Final SE of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. Project stage: Approval ML18333A1522018-12-0404 December 2018 Final SEs of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Project stage: Request ML18333A1462018-12-0404 December 2018 Letter Transmitting Final SEs of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. Project stage: Approval 2018-12-04 |
ML18226A256 | |
Person / Time | |
---|---|
Site: | Technical Specifications Task Force |
Issue date: | 09/20/2018 |
From: | Office of Nuclear Reactor Regulation |
To: | |
Honcharik M | |
Shared Package | |
ML18223A327 | List: |
References | |
CAC MF9955, EPID L-2017-PMP-0006 | |
Download: ML18226A256 (11) | |
Similar Documents at Technical Specifications Task Force | |
---|---|
Category:Safety Evaluation
MONTHYEARML24249A1452024-09-11011 September 2024
[Table view]Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A1342024-09-0606 September 2024 Final Model SE of Traveler TSTF 592, Revision 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24204A2712024-08-0101 August 2024 TSTF-576 Safety Evaluation Supplement ML24029A1472024-01-31031 January 2024 TSTF-592 Cover Letter for Final SE of TSTF-592 ML24029A1482024-01-31031 January 2024 Final Traveler SE of TSTF-592 ML23325A2142023-12-18018 December 2023 Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2302023-09-21021 September 2023 Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23241B0402023-09-11011 September 2023 Final Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML23153A1442023-09-11011 September 2023 Draft SE of Traveler TSTF-591, Revise Risk-Informed Completion Time (RICT) Program ML23206A0762023-07-31031 July 2023 Final Traveler SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23206A0752023-07-31031 July 2023 Final Model SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML21188A2252021-07-11011 July 2021 Final Model SE of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling ML21188A2272021-07-11011 July 2021 Final Traveler SE of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling ML21053A3962021-05-26026 May 2021 Draft Model SE of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21053A3882021-05-26026 May 2021 Draft Traveler SE of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2392021-04-20020 April 2021 Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21096A2742021-04-14014 April 2021 Final Model SE of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21098A1882021-04-14014 April 2021 Final SE of Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML20311A6642020-12-21021 December 2020 Draft Model Safety Evaluation of TSTF-554 Revise Reactor Coolant Leakage Requirements ML20353A2092020-12-21021 December 2020 Cover Letter Transmitting Draft Model TSTF-554, Revise Reactor Coolant Leakage Requirements ML20322A0242020-12-18018 December 2020 Final SE of Traveler TSTF-554, Revise Reactor Coolant Leakage Requirements ML20154K6062020-10-30030 October 2020 Draft Safety Evaluation of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20248H5372020-10-0909 October 2020 Model Safety Evaluation of TSTF-582, RPV WIC Enhancements with Optional TSTF-583-T Variation ML20132A2602020-05-13013 May 2020 Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML19248C8232020-02-25025 February 2020 Revised Final Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML19325C4342019-12-17017 December 2019 Final Safety Evaluation of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. ML19176A1902019-08-14014 August 2019 Final Model Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 2) ML19176A1912019-08-14014 August 2019 Final Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 1) ML19017A2172019-05-29029 May 2019 Draft Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition (Enclosure 2) ML19028A2862019-02-21021 February 2019 Final Model SE of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Enclosure 2) ML19028A2872019-02-21021 February 2019 Final SE of Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Enclosure 1) ML19007A2272019-01-15015 January 2019 Final Model SE of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. ML19007A2262019-01-15015 January 2019 Final SE of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. ML18333A1472018-12-0404 December 2018 Final Model SE of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (Enclosure 2) ML18333A1442018-12-0404 December 2018 Final SE of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. ML18267A2592018-11-21021 November 2018 Final Revised Model Safety Evaluation of Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML18299A0692018-11-16016 November 2018 Final Traveler SE of TSTF-564, Revision 2, Safety Limit MCPR ML18299A0762018-11-16016 November 2018 Final Model SE of TSTF-564, Revision 2, Safety Limit MCPR ML18299A0832018-11-16016 November 2018 NRC Disposition of TSTF Comments on the Draft Safety Evaluation of TSTF-564, Safety Limit MCPR ML18226A3182018-09-20020 September 2018 Draft Model SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 2 ML18226A2562018-09-20020 September 2018 Draft SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 1 TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 22018-07-0202 July 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 ML17341A3262018-03-26026 March 2018 Draft Model Safety Evaluation of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. ML17080A4142017-07-0303 July 2017 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML16343B0082016-12-20020 December 2016 Final Safety Evaluation of Technical Specifications Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (Tac No. MF3487) ML16343B0652016-12-20020 December 2016 Final Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML15328A3502016-03-0404 March 2016 Final Safety Evaluation (SE) of TSTF-547, Rev. 1, Clarification of Rod Position Requirements ML15314A3052015-12-11011 December 2015 TSTF-545 Final Model SE ML15181A0372015-09-0909 September 2015 Proposed Model Se for Plant-Specific Adoption of Traveler TSTF-545, Revision 2, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the CLIIP 2024-09-06 |
Text
[, and each step must be performed within the Frequency in the Surveillance Frequency Control Programfor the devices included in the step] [, and each step must be performed within the Frequency in the Surveillance Frequency Control Programfor the devices included in the step][, and each step must be performed within the Frequency in the Surveillance Frequency Control Programfor the devices included in the step][, and each step must be performed within the Frequency in the Surveillance Frequency Control Programfor the devices included in the step]
Federal Register
Code of Federal Regulations
Retrieved from "https://kanterella.com/w/index.php?title=ML18226A256&oldid=1641895"