|
---|
Category:Final Safety Evaluation Report (FSER)
MONTHYEARML18271A1322018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix B - References ML18274A4032018-09-28028 September 2018 Korea Hydro & Nuclear Power Co., Ltd - Review Results to Final Safety Evaluation Report for Six Chapters ML18043A8872018-09-28028 September 2018 APR1400 Chapter 9, Auxiliary Systems, Final Safety Evaluation Report ML18044A1852018-09-28028 September 2018 APR1400 Chapter 10, Steam and Power Conversion System, Final Safety Evaluation Report ML18067A2922018-09-28028 September 2018 APR1400 Chapter 4, Reactor, Final Safety Evaluation Report ML18078A0162018-09-28028 September 2018 APR1400 Chapter 11, Radioactive Waste Management, Final Safety Evaluation Report ML18081A5052018-09-28028 September 2018 APR1400 Chapter 12, Radiation Protection, Final Safety Evaluation Report ML18082A2982018-09-28028 September 2018 APR1400 Chapter 2, Site Characteristics, Final Safety Evaluation Report ML18176A0512018-09-28028 September 2018 APR1400 Chapter 15, Accident and Transient Analyses, Final Safety Evaluation Report ML18197A2192018-09-28028 September 2018 APR1400 Chapter 8, Electric Power, Final Safety Evaluation Report ML18211A5692018-09-28028 September 2018 APR1400 Chapter 5, Reactor Coolant System and Connecting Systems, Final Safety Evaluation Report ML18212A0922018-09-28028 September 2018 APR1400 Chapter 6, Engineered Safety Systems, Final Safety Evaluation Report ML18215A2402018-09-28028 September 2018 APR1400 Chapter 17, Quality Assurance and Reliability Assurance, Final Safety Evaluation Report ML18215A2412018-09-28028 September 2018 APR1400 Chapter 7, Instrumentation and Controls, Final Safety Evaluation Report ML18215A2422018-09-28028 September 2018 APR1400 Chapter 3, Design of Structures, Systems, Components, and Equipment, Final Safety Evaluation Report ML18227A0612018-09-28028 September 2018 APR1400 Chapter 16, Technical Specifications, Final Safety Evaluation Report ML18261A1612018-09-28028 September 2018 APR1400 Chapter 13, Conduct of Operations, Final Safety Evaluation Report ML18264A1412018-09-28028 September 2018 APR1400 Chapter 1, Introduction and General Discussion, Final Safety Evaluation Report ML18269A1742018-09-28028 September 2018 APR1400 Chapter 18, Human Factors Engineering, Final Safety Evaluation Report ML18269A2422018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix C - Acronyms ML18270A0722018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Table of Contents ML18270A3942018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix D - Principal Contributors ML18270A4522018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix E - Index of Nrc'S RAIs ML18271A1212018-09-28028 September 2018 APR1400 Final Safety Evaluation Report, Appendix a - Chronology ML18215A2392018-09-28028 September 2018 APR1400 Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation, Final Safety Evaluation Report ML18264A1302018-09-21021 September 2018 Enclosure 3 - Markup of the APR1400 Chapter 6 - FSER ML18264A1292018-09-21021 September 2018 Enclosure 2 - Markup of the APR1400 Chapter 5 - FSER ML18264A1282018-09-21021 September 2018 Enclosure 1 - Markup of the APR1400 Chapter 4 - FSER 2018-09-28
[Table view] |
Text
Other ASME Documents
KHNP Technical Reports
KHNP Topical Reports Korea Electric Power Corporation Documents (KEPCO)
Westinghouse Documents Other KHNP Documents
Audit Summary Reports
Commission Papers - Secretary of the Commission (SECY)
Interim Staff Guidance NUREG Series Reports
Regulatory Guides
Safety Evaluation Reports
U.S. Code of Federal Regulations (CFR)
NRC Letters and Memorandums
Bulletins Other NRC Documents