ML18192A192

From kanterella
Revision as of 08:27, 22 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Additional Information to Environmental Report, Supplement No. 6 Containing Revised Sections Which Have Been Revised to Include Southern California Edison Co. as a Participant in This Project
ML18192A192
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/10/1975
From: Van Brunt E E
Arizona Public Service Co
To: Regan W H
Office of Nuclear Reactor Regulation
References
ANPP-3126
Download: ML18192A192 (10)


Text

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)0:~Rz FII E: FROM..Arizona Pub1icI'Service Cc Phoenix,'Az.h unt 1r 10-10-75 10-11-75 DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO: DL CLASS UNCL'ASS'PROP INFO, ORIG 3 signed.INPUT CC'OTHER NO,CYS REC'D 3 SENTNRC PDR SENT LOCAL PDR Xx'DOCKET NO: STN 50"528/529/530 DESCR IPTION: Ltr notarized 10-10-75....trans the following:

DO NOT REMOV8, ACKNOWLEDGED PLANT NAME: Ariz Palo Verde 1-2-3 ENCLOSURES:

Suppl 8B to the ER: Consisting of revised secti 1.1, 1.2, 2.,3, 3.9, 4.2;'5.6,&10.9............

whi'ch include,.S'outhern'Calif Edison Co as a participant in.'the" pro)ect......(w/neol 8VII)......(200'ys encl rec'd)FOR ACTION/INFCRI'RATION 10-14-75 ehf~BUTLER (L)W/Copies CLARK (L)W/Copies'PARR (L)~W/l Copief'" KNIEL (L)W/Copies SCHWENCER (L')W/Copies STOLZ (L)W/Copies VASSALLO (L)W/Copies PURPLE (L)W/Copies ZIEMANN"(L)REGAN (E).REID(L)W/Copies W//CopiesŽW/COPIES DICKER (E)LEAR (L)W/Copies W/Copies KNIGHTON (E)SPIES'/Copies" W/Copies YOUNGB LOOD (E)LPM W/Copies*W/opuses INTERNAL DISTR I BUTION~RC PDR OGC, ROOM P-506A~GOSSI CK/STAF F~CASE GIAMBUSSO BOYD MOORE (L)~DEYOUNG (LW" SKOVHOLT (L)GOLLER (L)(Ltr)P.COL'LINS DENISE REG OPR FILE 5 REGION (2)HIPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO'TEDESCO~J,COLLINS LAI NAS BENAROYA VOLLMER DENTON MGRIMES~GAMMI LL'KASTNE R~BALLAR D~SPANGLER'NVI RO~MULLER~DICKER KNIG HTON YOUNG BLOOD REGAN PROJECT LDR~&~m~Hh&ESS-LIC ASST R., DI GGS (L)H.GEAR IN,(L)'.GOULBOURNE (L)P.KREUTZER (E)J.'LEE.(L)M.RUBHBROOK(L)

S.REED(E)M.SERVICE (L)S.'SH EPPAR D (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (E)'.WILSON (L)>~R.INGR'~4 (L')H.DUNCAN A/T I ND~BRAITMAN SALTZMAN ME LTZ PLANS MCDONALD'HAPMAN..

DUBE (Ltr).E.COUPE PETERSON HARTFIELD (2)KLECKER EISENHUT WI GG INTON~,/.6 culS EXTF R N AL DISTR I BUTION 9-LOCAL PDR~~~<<~~~1-, TIC (ABERNATHY)

+~10)-NATIONAL LABS AHL~1-NSIC (BUCHANAN).

1-W.PENNINGTON,'m E-201 GT~1-AS LB 1-CONSULTANTS 1-Newton Anderson NEWMARK/BLUME/AG BABIAN-A.CRS HOLDING/SENT 1.-P D R-SAN/LA/N Y 1-BROOKHAVEN'NAT LAB~1-G..ULR IKSON'RNL f

~~~~~~~~~~~~~1~~.~~~H~\~~~~~~~~~~

a e p UQK3I I'D~BQ CKOKQIRQH'P P.O.BOX 2I666 PHOENIX, ARIZONA 85036 October 10, 1975 ANPP-3126 Director of Nuclear Reactor Regulation Attn: Mr.W.H.Regan, Jr., Chief Environmental Projects Branch 4 Division of Reactor Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555

REFERENCE:

Docket Nos.STN 50-528/529/530

Dear Mr.Regan:

We are hereby submitting additional information to the Palo Verde Nuclear Generating Station Environmental Report.Enclosed are three signed originals of Supplement 86.containing revised Sections 1.1, 1.2, 2.3, 3.9, 4.2,'5.6.and 10.9, which have been revised to include Southern California Edison Company as a Participant in this Project.Under separate cover, 197 additional copies of Supplement

/l6 have been provided.An additional three-ring binder labeled Volume VII will be provided within two weeks.Very truly yours, 8 Edwin E.Van Brunt, Jr.Vice President, Nuclear Services ANPP Project Direct EEVBJr/WMP/pk Subscribed and sworn to this 9~day of October, 1975.Ot<<oc gO Notary Public My Gommission Expires~M~MP 1-7'4 Pg) ll ll!F I a P C I 4 P II fh I 4 p C'~a P P~g~

CC Arthur C.Gehr, Esq.Snell&Wilmer 3100 Valley Center Phoenix, Arizona 85073 Carmine F.Cardamone, Jr.1415 North Third Avenue Tucson, Arizona 85705 Barbara E.Fisher, Esq.Arizona Public Law Advocates 201 North Stone Avenue Suite 210 Tucson, Arizona 85701 0 4 PVNGS-1,263 ER INSTRUCTION SHEET PVNGS ER Supplement No.6 presents information to define the effect of the replacement of Tuscon Gas and Electric Company (TGaE)by Southern California Edison Company (SCE)as a member of the Arizona Nuclear Power Project (ANPP).The bulk of the information is on the need for power and on a new transmission line to be added to the project by SCE.This consists of a new Chapter 1 and new Sections S6-2.3.2, S6-3.9.1, S6-4.2, S6-5.6, and S6-10.9.1, and new Appendix 1D dealing only with SCE infor-mation.In addition to these, sections, there are some, pages and figures in the ER which must be changed to reflect the addition of SCE to ANPP.They are page 8.1-1, page 8.1-2, table 8.1-1, table 8.1-2, page 8.2-1, table 8.2-1, Appendix 8A title page, page 8A-l-, table 8A-1, page 8A-9, page 9.1-2, page 9.1-4, page 9.2-2, page 9.2-4, figure 9.2-2, figure 9.2-3, page 9.3-1, page 9.3-4, table 11.3-1, sheets 1 and 8, fig-ure 11.3-1, and responses to questions, 1, 2, 3 and 4 of Chapter 1 in Supplement No.1.This information is presented in three discrete packages.The first is the new Chapter 1, which will be substituted in its entirety with the original Chapter 1 in Volume I (see Chapter I Instructions).

The second package contains the description of the SCE transmission line route.It is to be placed in Volume 7 as indicated by the transmission line instruction sheet.The third package contains the miscellaneous pages changed to reflect the addition of SCE to ANPP.It is to be inserted into Volume VII.It is felt that these changes present the information pertinent to the definition of the need for power and environmental impact subsequent to the addition of SCE to ANPP.A prefix"S6" is used before all sections, pages, and table and figure numbers for ease of identification of pages related to SCE.S6-i Supplement No.6 October 10, 1975 PVN(3S 2&3 ER i In add the co ition ol ingg to the SC',E informa water toirage resee on, a revised description of oi:r is presented as a new f igure reflec , compil All'thh after 2.1-t the e addd ese r the SS 2.Also, a revisedd impact of'he stor itional information evised pages should CE information.

ection 5.1.3 is provided to e reservoir as well as to rovided gaby previous supplements.

e inserted into Volume VIISupplement No.6 October 10, 1975

~~PVNGS-1,263 ER Cha ter 1 Instructions Remove Chapter 1 pages 1-i through 1.4-3 from Volume I and replace it with the Supplement VI revision of Chapter l.Insert Appendix 1D after Appendix 1C in Volume I.Remove and destroy the Supplement 4 revision of Chapter I currently in Volume VI.Supplement No.6 October 10, 1975 Q~i~~"~8