Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML0826006582008-09-16016 September 2008 Draft Request for Additional Information - Relief Request 2 - Weld Overlay of Dissimilar Metal Welds Project stage: Draft RAI ML0826006252008-09-16016 September 2008 Draft Request for Additional Information on Relief Request No. 2 Regarding Structural Weld Overlays Project stage: Draft RAI ML0826105072008-09-18018 September 2008 Request for Additional Information on Relief Request for Structural Weld Overlays Project stage: RAI ML0829605462008-11-0303 November 2008 Safety Evaluation of Relief Request to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal Welds Project stage: Approval ML0831506402008-11-19019 November 2008 Corrected Page to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal Welds Project stage: Other ML0835406262008-12-24024 December 2008 Corrected Page to Safety Evaluation of Relief Request to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal Welds Project stage: Approval 2008-12-24
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24177A2532024-02-12012 February 2024 Request for Additional Information Relief Request RR 7, Alternative Examination of Reactor Vessel Welds for Florida Power & Light Company, St. Lucie Nuclear Plant, Unit 1 ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22325A0692022-11-18018 November 2022 RAI Set 4 ML22270A1482022-09-26026 September 2022 SLRA Second Round RAI Letter 2 - Class 1 Fatigue (Final) ML22217A0032022-08-0404 August 2022 SLRA Second Round RAI Letter 1) ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22193A0872022-07-11011 July 2022 Letter RAI Set 3 (Final) ML22133A0032022-05-12012 May 2022 SLRA Rai'S Set 1 ML22101A2322022-05-0202 May 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Enclosure RCIs and RAIs ML22094A1672022-04-0101 April 2022 2022 St. Lucie POV Inspection Information Request ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report ML21350A4262021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Licensing Amendment Request Concerning Technical Specification Conversion to NUREG-1432, Revision 5 ML21119A3142021-04-28028 April 2021 Requests for Additional Information Regarding License Amendment Requests to Apply Risk Informed Completion Times (RICT) for the 120-Volt AC (EPID L-2020-LLA-0283) (Email) ML21063A3192021-03-0404 March 2021 Request for Additional Information Regarding Relief Request RR 15 - Extension of RPV Welds from 10 to 20 Years ML20092G3442020-04-0101 April 2020 RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program ML20094G2022020-03-30030 March 2020 Request for Additional Information Regarding License Amendment Request to Adopt EAL Schemes Pursuant to NEI 99-01 (L-2019-LLA-0210) ML19225D3152019-08-13013 August 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19193A1982019-07-12012 July 2019 Emailed St. Lucie Heat Sink RFI ML19192A1372019-07-11011 July 2019 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19192A1352019-06-25025 June 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19151A8312019-05-31031 May 2019 NRR E-mail Capture - St. Lucie Plant, Unit Nos. 1 and 2, Request for Additional Information Regarding Emergency Diesel Generator Surveillance Requirement Amendment Request ML19151A5092019-05-21021 May 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit Nos. 1 and 2 Emergency Diesel Generator Surveillance Requirement Amendment Request ML19109A1392019-04-18018 April 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding the License Amendment Request Pertaining to the Iodine Removal System ML19053A2242019-02-0101 February 2019 NRR E-mail Capture - St. Lucie Plant Unit No. 1 - Draft Request for Additional Information Related to Relief Request 6 Regarding the Refueling Water Tank Bottom Liner ML18296A2052018-10-22022 October 2018 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)2018-10-22022 October 2018 St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18197A4112018-08-0101 August 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Reduce the Number of Control Element Assemblies ML18019A0712018-01-18018 January 2018 NRR E-mail Capture - Request for Additional Information - St. Lucie Inop AFW Steam Supply LAR (L-2017-LLA-0296) ML17331B1532017-11-27027 November 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie IST Relief Request #5 - PR-01 (L-2017-LLR-0113) ML17277A3692017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Rict LAR - MF5372/MF5373 ML17152A1842017-06-0101 June 2017 Request for Additional Information - RPS Rate of Change and LCO Change LAR (CACs MF9119 9120) ML16356A1432016-12-20020 December 2016 Notification of Inspection and Request for Information ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16308A3232016-11-0303 November 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie EDG Day Tank LAR - MF8006 ML16292A8212016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML17003A0452016-10-11011 October 2016 NRR E-mail Capture - (External_Sender) FW: St. Lucie Response to RAI on SL2-22 SG Tube Inspection Report (MF7604) ML16244A2602016-08-26026 August 2016 Notification of Inspection and Request for Information ML16155A3502016-06-0303 June 2016 Notification of Inspection and Request for Information ML16089A0052016-03-28028 March 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie Srxb Mtc Surv - MF7269 & MF7270 ML16077A1062016-03-17017 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie Vacuum Gothic LAR - MF6980/MF6981 ML16068A2612016-03-0808 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie TSTF-422 - MF6683/MF6684 2024-07-12
[Table view] |
Text
DRAFT REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST 2 WELD OVERLAY OF DISSIMILAR METAL WELDS ST. LUCIE, UNIT 1 By letter dated April 29, 2008, Florida Power & Light proposed an alternative Relief Request 2 (RR-2) to the requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, for mitigating primary water stress corrosion cracking on dissimilar metal welds using full structural weld overlays (SWOL) at St. Lucie, Unit 1 (SL-1). Currently, the U.S. Nuclear Regulatory Commission (NRC) staff has approved the use of Code Case N-504-3, "Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping Section XI, Division 1,: and N-638-1, "Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique Section XI, Division 1."
The NRC staff used the requirements of Code Cases N-504-3 and N-638-1 as NRC-approved criteria associated with similar full SWOL applications to aid in the evaluation of the SL-1, RR-2 Attachment 2. To complete its review, the staff is requesting the following additional information:
- 1. Discuss whether the subject nozzles have been ultrasonically examined under the Inservice Inspection (ISI) program or Electric Power Research Institute (EPRI) report, MRP-139 in previous refueling outages. If so, discuss whether flaws have been detected in the subject nozzles.
- 2. Section 1.1, page 1. The Examination Category for the subject welds is identified as R-A. This is a risk-informed ISI examination category. (A) Discuss whether after the weld overlay installation, will the ISI examinations be based on the RI-ISI program or the proposed RR-2? (B) Discuss whether the subject welds will be removed from the RI-ISI program after the weld overlay installation.
- 3. Paragraph 2(a) of Attachment 2 of RR-2 states that the size of all flaws detected or postulated in the original weldment shall be projected to the end of the expected life of the overlay. Provide/describe the expected life of the overlay.
- 4. Paragraphs g(2) and g(3) of Code Case N-504-3 require evaluations of residual stresses and flaw growth of the repaired weldments. Similar evaluations are required by Section 2 of Attachment 2 to RR-2. Section 2(b)7 of Attachment 2 states that effects of any changes in applied loads, as a result of weld shrinkage from the entire SWOL on other items in the piping system, shall be evaluated. (A) Confirm that the analysis will be performed to show that the requirements of Subarticles NB-3200 and NB-3600 of the ASME Code, Section Ill are satisfied. (B) Confirm that the analysis includes the crack growth calculations to demonstrate that crack growth in the weld overlay or base metal is acceptable and residual stress distribution in the weld overlay and original weld demonstrate favorable stress distribution. (C) The staff requests that the licensee submit the preliminary results of the evaluations prior to entry into Mode 4 from the refueling outage and the final evaluations within 60 days of the plant restart.
- 5. Paragraphs 1(c)(1), 1(c)(1)(a), 1(c)(1)(b) of Attachment 2 of RR-2 provide the alternative to the post weld heat treatment (PWHT) of the Construction Code and Owner's Requirements. The alternative eliminates PWHT for weld overlays when the overlay is applied to P-No.1 base material. The staff still has not decided the acceptability of the elimination of post weld heat treatment in paragraphs 1(c)(1)(a) and 1(c)(1)(b). Please provide justification for the proposed alternative in these paragraphs.
- 6. Paragraph I-2.1(g)(2) of Mandatory Appendix I of Attachment 2 to RR-2 provides a means of determining an Adjustment Temperature for the welding procedure qualification. This Adjustment Temperature was not a part of Code Case N-638-1 and, therefore, has not been approved by the staff. Explain the technical basis of this requirement.
- 7. Section 5.2 of RR-2, states that a barrier layer of austenitic stainless steel filler metal across the austenitic stainless steel base metal to reduce the risk of cracks. (A) Discuss whether paragraph (e) of Code Case N-504-3 is applicable to the barrier layer if austenitic stainless steel filler metal is applied. Paragraph (e) requires existence of certain delta ferrite content in the welded metal when austenitic stainless steel weld metal is used. (B) Identify the austenitic stainless steel weld filler metal that will be used for the butter layer. (C) Confirm that the Certified Material Test Report (CMTR) for the austenitic stainless steel filler wire shows a minimum delta ferrite of a specified amount. Provide the maximum and minimum delta ferrite content for the heat of austenitic stainless steel filler wire to be used, as stated on the CMTR.
- 8. What are the beginning and end dates for the fourth 10-year ISI interval at SL-1?
- 9. The following typographical errors were identified in the proposed alternative and should be corrected: (A) On page 6, on the second line of the first full paragraph 2(b)(6) should be 2(b)(5), on the third line of the same paragraph 2(b)(7) should be 2(b)(6), on the eighth line of the paragraph 2(a)(2)(b) should be 2(a)(2)(a). (B) On page 25, Section 2(a)(2)(b) in the third line "(b) or (c) above" should be deleted. (C) On page 26, Section 2(b)(6) in the sixth line 2(b)(4), (5), or (6) should be 2(b)(3), (4), or (5). (D) On page 36, Section I-2.1(f) should be changed to I-2.1(f)(4).
- 10. Mandatory Appendix I to Attachment 2 of RR-2 Section I-3(e) lists a number of methods that can be used in the welding procedure to determine interpass temperature. The staff's position is that the temperature measurement in 1-3(e)(1) should be used. If 1-3(e)(1) cannot be performed, 1-3(e)(2) or 1-3(e)(3) may be used. Please describe the method that will be used at SL-1 and provide a discussion of its acceptability.
- 11. Section 3(c)2 of Attachment 2 of RR-2 states no credit can be given in any portion of the examination volume where the ultrasonic beam passes through the cast stainless steel material. (A) Provide the weld overlay thickness. (B) Provide reduction in ultrasonic testing (UT) volume coverage for the weld overlay locations which involve cast stainless steel safe-ends, including estimated total UT examination coverage for preservice and inservice inspection per sections 3(b) and 3(C) of RR-2. Discuss why reduction in examination coverage is acceptable. (C) Discuss whether a phased-array UT technique will be used in the volumetric examination.
- 12. Attachment 2 of RR-2, page 23, first paragraph, states that, "-All Section XI references are to the 2004 Edition with the 2006 Addenda-." This statement is not applicable to SL-1 and should be eliminated because the code of record for the SL-1 fourth 10-year ISI interval in which RR-2 is applicable is the 2001 Edition thru 2003 Addenda. In addition, Table 1 of Attachment 2 can be deleted since the additional code references do not apply. The staff notes that the NRC has not incorporated by reference the 2005 and 2006 Addenda of the ASME Code in Title 10, Code of Federal Regulations , Section 50.55a.
- 13. Section 2.0 of Attachment 2 of RR-2 states that the code of record for the current ISI 10-year interval is, "-Section XI, 2001 Edition including Addenda through 2003 and 2001 with 2001 Addenda for Appendix VIII-" Please clarify the ASME Code Edition and Addenda that will be used for PDI examination per the ASME Code,Section XI, Appendix VIII because the 2001 Addenda of the ASME Code do not exist.