|
---|
Category:License-Operator
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] |
Text
Attachment 10 Page 1 of 3 OBDI 202 - IOLE Process SO - 2009 - 02 DRAFT OPERATING TEST COMMENTS ADMIN JPMS
- 3. Attributes
- 4. Job Content Errors JPM# 1. Dyn (D/S) 2. LOD (1-5) IC Focus Cues Critical Steps Scope (N/B) Over- lap Job-Link Minutia 5. U/E/S 6. Explanation (See below for instructions)
SRO (A1a) None SRO (A1b) None SRO (A2) None SRO (A3) None SRO (A4) None Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Exam ination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
- 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconf iguration or realignment.
- 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level fo r the license being tested. 3. Check the appropriate box when an attribute weakness is identified: The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin. The JPM does not contain sufficient c ues that are objective (not leading). All critical steps (elements) have not been properly identified. Scope of the task is either too narrow (N) or too broad (B). Excessive overlap with other part of operating test or wr itten examination. 4. Check the appropriate box when a job content error is identified: Topics not linked to job content (e.g., di sguised task, not required in real job). Task is trivial and without safety significance. 5. Based on the reviewer
=s judgment, is the JPM as written (U)na cceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory? 6. Provide a brief description of any U or E rating in the explanation column. 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
Attachment 10 Page 2 of 3 OBDI 202 - IOLE Process SO - 2009 - 02 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN-PLANT SYSTEMS JPMS
- 3. Attributes
- 4. Job Content Errors JPM# 1. Dyn (D/S) 2. LOD (1-5) IC Focus Cues Critical Steps Scope (N/B) Over- lap Job-Link Minutia 5. U/E/S 6. Explanation (See below for instructions)
S1 None S2 None S3 None S4 None S5 None S6 None S7 None P1 None P2 None P3 None Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Exam ination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
- 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconf iguration or realignment.
- 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level fo r the license being tested. 3. Check the appropriate box when an attribute weakness is identified:
$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
$ The JPM does not contain sufficient c ues that are objective (not leading).
$ All critical steps (elements) have not been properly identified.
$ Scope of the task is either too narrow (N) or too broad (B).
$ Excessive overlap with other part of operating test or wr itten examination. 4. Check the appropriate box when a job content error is identified: Topics not linked to job content (e.g., di sguised task, not required in real job). Task is trivial and without safety significance. 5. Based on the reviewer
=s judgment, is the JPM as written (U)na cceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory? 6. Provide a brief description of any U or E rating in the explanation column. 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
Attachment 10 Page 3 of 3 OBDI 202 - IOLE Process SO - 2009 - 02 DRAFT OPERATING TEST COMMENTS SCENARIOS Scenario Set 1. ES 2. TS 3. Crit 4. IC 5. Pred 6. TL 7. L/C 8. Eff 9. U/E/S 10. Explanation (See below for instructions)
N /A Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Ex amination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the iss ue in the space provided. 1. ES: ES-301 checklists 4, 5, & 6 satisfied.
- 2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
- 3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2.
- 4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scen ario events and actions.
- 5. Pred: Scenario sequence and other factors avoid predictability issues.
- 6. TL: Time line constructed, including ev ent and process triggered conditions, such t hat scenario can run without routine exam iner cuing.
- 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably sim ilar exposure and events are needed for evaluation purposes.
- 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interact ions. 9. Based on the reviewer
=s judgment, rate the scenario set as (U)nacceptable (requiring r epair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
- 10. Provide a brief description of problem in the explanation column.
- 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.