EOC Annual Assessment Letter and Inspection/Activity Plan
ML110620306
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/04/2011
From: Stephanie West
Division Reactor Projects III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML110620306 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 March 4, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A

-PY-A290 Perry, OH 44081

-0097

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PERRY NUCLEAR POWER PLANT, UNIT 1 (REPORT 05000 440/20 11 001) Dear Mr. Bezilla

On February 17, 2011, the NRC completed its end

-of-cycle performance review of Perry Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 10 , through December 31, 20 10. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security

-related inspection plan. The NRC determined that overall, Perry Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Perry Nuclear Power Plant, Unit 1

, during the most recent quarter was within the Licensee Response Column of the NRC

=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. In addition to the ROP baseline, inspections are planned for Temporary Instruction (TI) 2515/179, "Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS

," TI 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems

," Independent Spent Fuel Storage Installation (ISFSI)

Inspections 60854.1

, "Preoperational Testing of ISFSIs at Operating Plants,"

60855.1, "Operation of an ISFSI at Operating Plants,"

and 60856.1, "Review of 10 CFR 72.212(b) Evaluations at Operating Plants," and Inspection Procedure 92702, "Followup on Corrective Actions for Violations and Deviations."

Performance at the Perry Nuclear Power Plant during the assessment period continued to exhibit weaknesses in the area of human performance. In our mid

-cycle assessment letter dated September 1, 2010, we advised you of a substantive cross

-cutting issue in the area of human performance with a cross

-cutting theme in the component of work planning (H.3(a))

. The total number of findings with documented cross

-cutting aspects in human performance remained constant with 14 findings in this assessment period. Our assessment of the findings

M. Bezilla identified an additional cross

-cutting theme in the human performance area, based on four findings with a cross

-cutting aspect of documentation/procedures (H.2(c)). In addition, while the number of findings in the work planning (H.3(a)) cross

-cutting aspect decreased from four to three during the most recent assessment period, it is apparent that your actions to date have not resulted in sustainable positive improvement in the area of work planning. Therefore, the human performance substantive cross

-cutting issue will remain open until the number of findings in the H.2(c) and H.3(a) aspects are reduced and you demonstrate the implementation of effective corrective actions that result in sustained performance improvement in the human performance area.

This assessment period is the seventh consecutive assessment period identifying a substantive cross-cutting issue in the human performance area first opened in our March 3, 2008, end-of-cycle assessment letter [ADAMS ML080600303]. Based on the results of the most recent assessment period, the actions taken in response to continued human performance errors have not demonstrated sufficient progress in addressing the issue. Your effectiveness at implementing sustainable corrective actions to address this substantive cross

-cutting issue was reviewed during our biennial Problem Identification

& Resolution inspection in November 2010. The results of that inspection identified that improvements made to address the human performance substantive cross

-cutting issue in work planning are not yet effective and that additional effort in this area is needed.

In our September 1, 2010, mid

-cycle assessment letter

, we notified you of the potential for the NRC to take additional actions not covered by the Action Matrix, as prescribed in Inspection Manual Chapter 0305. Based on our assessment of your actions to address the substantive cross-cutting issue in the human performance area, and the actions we have taken to date to assess your performance issues, we have determined that additional actions not covered by the Action Matrix are warranted. Prior to the 2011 mid

-cycle assessment, the NRC will conduct an inspection of the long

-standing, human performance substantive cross

-cutting issue, beyond the baseline inspection program. Following the receipt of a letter from you informing us of Perry's readiness for inspection, the NRC will perform an inspection to assess the effectiveness of your corrective actions in addressing the human performance substantive cross

-cutting issue, and specifically the theme in work planning (H.3a). The inspection will focus on evaluating Perry's progress in developing and implementing those corrective actions and the metrics and measures used to determine performance improvement effectiveness. This inspection will use NRC Inspection Procedure (IP) 92702, "Followup on Corrective Actions for Violations and Deviations," as guidance. We will conduct this inspection t o evaluate whether adequate corrective actions have been implemented for the human performance substantive cross

-cutting issue; verify that the root causes of these issues have been identified

that their generic implications have been addressed
and that your programs and practices have been appropriately enhanced to prevent recurrence. We will contact you separately to schedule this inspection.

M. Bezilla The enclosed inspection plan lists the inspections scheduled through June 30, 20 12. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid

-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRC

=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter. Sincerely, /RA/ Steven West, Director Division of Reactor Projects Docket Nos.

50-440 License Nos.

NPF-58

Enclosure:

Perry Plant Inspection/Activity Plan

cc w/encl: Distribution via ListServ

Inspection / Activity Plan Page 1 of 2 02/28/2011 Report 22 03/01/2011

-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Perry ISFSI-ISFSI DESIGN AND CONSTRUCTION 1 1 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 01/21/2011 04/01/2011 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 2 1 IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 02/01/2011 03/31/2011 1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 05/01/2011 12/31/2011 STRIKE-STRIKE CONTINGENCY-OPS/MAINT/RP/CHEM/I&C 2 1 IP Licensee Strike Contingency Plans 92709 04/01/2011 05/15/2011 BI ENG-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR 7111108G 04/18/2011 05/22/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 05/02/2011 05/06/2011 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/02/2011 05/06/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/11/2011 07/15/2011 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION 1 1 IP A lert and Notification System Testing 7111402 09/12/2011 09/16/2011 1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/12/2011 09/16/2011 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/12/2011 09/16/2011 1 IP Performance Indicator Verification 71151 09/12/2011 09/16/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Environmental Monitoring Program 71124.07 09/19/2011 09/23/2011 1 IP Reactor Coolant System Activity 71151-BI01 09/19/2011 09/23/2011 BI ENG-COMPONENT DESIGN BASIS INSPECTION 7 1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/31/2011 12/02/2011 1 IP Component Design Bases Inspection 7111121 10/31/2011 12/02/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/28/2011 12/02/2011 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 2 1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 01/01/2012 05/31/2012 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2012 11/30/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Occupational ALARA Planning and Controls 71124.02 02/06/2012 02/10/2012 1 IP Performance Indicator Verification 71151 02/06/2012 02/10/2012 BI ENG-FIRE PROTECTION INSPECTION & BAG TRIP 3 1 IP Fire Protection [Triennial]

7111105T 03/12/2012 04/13/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 02/28/2011 Report 22 03/01/2011

-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Perry BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/16/2012 04/20/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

M. Bezilla The enclosed inspection plan lists the inspections scheduled through June 30, 20 12. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid

-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRC

=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter. Sincerely, /RA/ Steven West, Director Division of Reactor Projects Docket Nos.

50-440 License Nos.

NPF-58

Enclosure:

Perry Plant Inspection/Activity Plan

cc w/encl: Distribution via ListServ

DOCUMENT NAME:

G:\DRPIII\1-Secy\1-Work In Progress

\2010 EOC Letters

\Perry EOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME AGarmoe:dtp

  • JC for JCameron SWest DATE 02/28/11 0 3/01/11 0 3/0 2/11 OFFICIAL RECORD COPY

Letter to M. Bezilla from S. West dated March 4, 2011.

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PERRY NUCLEAR POWER PLANT, UNIT 1 (REPORT 05000440/2011001)

DISTRIBUTION

Daniel Merzke RidsNrrPMPerry Resource RidsNrrDorlLpI3

-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment Resource