Regulatory Commitment Change Summary ReportML17354A087 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle |
---|
Issue date: |
12/20/2017 |
---|
From: |
David Helker Exelon Generation Co |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
RS-17-167 |
Download: ML17354A087 (5) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle |
---|
Category:Letter type:RS
MONTHYEARRS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-016, Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations2024-03-14014 March 2024 Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-0808 March 2024 Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-017, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS2024-02-23023 February 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-005, Additional Information Supporting Request for Partial Site Release2024-02-0808 February 2024 Additional Information Supporting Request for Partial Site Release RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval 2024-09-09
[Table view] |
Text
Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com RS-17-167 December 20, 2017 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 N RC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 N RC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 U.S. Nuclear Regulatory Commission Regulatory Commitment Change Summary Report December 20, 2017 Page 2
Subject:
Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRG Docket Nos. 50-254 and 50-265 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRG Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289 Regulatory Commitment Change Summary Report The purpose of this report is to provide the Exelon Generation Company, LLC (EGG) "Regulatory Commitment Change Summary Report" tor the listed stations for certain commitment changes processed during the period from January 1, 2017, through December 31, 2017. Summaries of the commitment changes requiring NRG notification are contained in the attachment.
There are no new regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mitchel Mathews at (630) 657-2819.
Respectfully, David Helker Manager -Licensing and Regulatory Affairs Exelon Generation Company, LLC
Attachment:
Regulatory Commitment Change Summary Report Attachment Exelon Generation Company, LLC Regulatory Commitment Change Summary Report Page 1of3
- Commitment Change Tracking Number: 2017-01 Source Documents:
- 1. Letter from D. L. Taylor (Commonwealth Edison (CECo)) to NRC, "Dresden Station, Units 2 and 3, Quad Cities, Units 1 and 2, Zion Station, Units 1 and 2, LaSalle County Station, Units 1 and 2, Byron Station, Units 1 and 2, Braidwood Station, Units 1 and 2, Alternative Schedule for Generic Letter 90-03," dated September 26, 1990 2. Letter from D. J. Chrzanowski (CECo) to NRC, "Clarification of Commitment to Generic Letter 90-03, 'Vendor Equipment Technical Information Program (VETIP),"'
dated December 5, 1991 3. Letter from M. A. Jackson (CECo) to T. E. Murley (NRC), "Generic Letter 90-03, 'Vendor Interface for Safety Related components,'
dated March 20, 1990 and Supplement 1 dated May 14, 1990," dated November 4, 1992 4. Letter from G. C. Creel (Baltimore Gas and Electric) to NRC, "Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Response to Generic Letter 90-03, 'Relaxation of Staff Position in Generic Letter 83-28, Item 2.2, Part 2, 'Vendor Interface for Safety-Related Components,"'
dated September 24, 1990 5. Letter from J. S. Perry (Illinois Power Company) to NRC, "Clinton Power Station, Unit 1 Response to Generic Letter 90-03," dated September 25, 1990 6. Letter from R. C. Mecredy (Rochester Gas and Electric Corporation) to NRC, "R. E. Ginna Nuclear Power Plant Response to NRC Generic Letter 90-03 (Relaxation of Position in Generic Letter 83-28, Item 2.2 Part 2, 'Vendor Interface for Safety Related Components,"'
dated September 18, 1990 7. Letter from D. R. Helwig (Philadelphia Electric Company (PECO) to NRC, "Peach Bottom Atomic Power Station, Units 2 and 3, Limerick Generating Station, Units 1 and 2, Response to Generic Letter No. 90-03, 'Relaxation of Staff Position in Generic Letter No. 83-28, Item 2.2 Part 2 'Vendor Interface for Safety-Related Components,"'
dated October 2, 1990 8. Letter from E. E. Fitzpatrick (GPU Nuclear Corporation) to NRC, "Oyster Creek Nuclear Generating Station Response to Generic Letter 90-03," dated September 18, 1990 9. Letter from H. D. Hukill (GPU Nuclear Corporation), "Three Mile Island, Unit 1 Response to Generic Letter 90-03 Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2 Vendor Interface for Safety Related Components," dated October 1, 1990 Subject of Change: Revision to the Exelon Generation Company, LLC (EGC) Commitments in Response to NRC Generic Letter (GL) 90-03, "Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2, 'Vendor Interface for Safety-Related Components."'
Attachment Exelon Generation Company, LLC Regulatory Commitment Change Summary Report Page 2of3 Original Commitment:
In response to the NRG GL 90-03 recommendations for interface with equipment vendors, EGG established, implemented, and maintains a continuing program to ensure that vendor information for safety-related components is complete, current and controlled throughout the life of its operating plants, and is appropriately referenced or incorporated in plant instructions and procedures.
Vendors of safety-related equipment were contacted and an interface was established.
Where vendors could not be identified, have gone out of business, or would not supply information, EGG ensured that sufficient attention was paid to equipment maintenance, replacement, and repair, to compensate for the lack of vendor backup, to assure reliability commensurate with its safety function (GDG-1). EGG's vendor interface program includes:
a) A program with the [Nuclear Steam Supply System] NSSS vendor as described in the Vendor Equipment Technical Information Program (VETIP), which covers all the related components within the NSSS scope of supply. This program includes provisions for assuring receipt by EGG of all technical information provided by the NSSS vendor; and b) A program of periodic contact with the vendors of other key safety-related components not included in (a) above. The program includes periodic communication with vendors to assure that all applicable information has been received.
The program uses a system of positive feedback with vendors for mailings containing technical information.
It also defined the interface and division of responsibilities between EGG and the nuclear and non-nuclear divisions of their vendors that provide service on safety-related equipment to assure that requisite control of and applicable instructions for maintenance work on safety-related equipment are provided.
Revised Commitment:
EGG will discontinue the program of periodic contact with the vendors of other (non-NSSS) key safety-related components (i.e., Item b above). The program related to the NSSS vendors which covers all the safety-related components within the NSSS scope of supply (i.e., Item a above) is not affected.
Basis: The periodic re-contact of vendors is redundant.
The reliability of safety-related components for EGG's operating units is assured by preventive maintenance and performance monitoring actions implemented after the commitments made in response to NRG GL 83-28, "Required Actions Based on Implications of Salem ATWS Events," and GL 90-03. The preventive maintenance tasks, frequencies, and detailed actions are subject to continuous improvement and monitoring for effectiveness.
Attachment Exelon Generation Company, LLC Regulatory Commitment Change Summary Report Page 3 of 3
- Commitment Change Tracking Number: 2017-02 (Limerick Generating Station I Peach Bottom Atomic Power Station) Source Documents:
Letter from Hubert J. Miller (U.S. Nuclear Regulatory Commission) to Oliver D. Kingsley (Exelon Generation Company, LLC) -"NRG Office of Investigations Report 1-2000-033
-Peach Bottom Atomic Power Station I Limerick Generating Station," dated October 23, 2001 Subject of Change: Revision to the EGG Commitments Related to NRG Office of Investigations Report 1-2000-033 for Limerick Generating Station and Peach Bottom Atomic Power Station. Original Commitment: " ... You are not required to respond to this letter because the NRG has sufficient information on the docket concerning this issue, including details in a combined NRG inspection report dated August 30, 2001 (50-277/01-012; 50-278/01-012 and 50-352/01-013; 50-353/01-013), and your slides from the conference.
These slides, as well as your presentation, provided your immediate and long term corrective actions to prevent recurrence of the violation.
Your immediate corrective actions were described above, while your long term corrective actions included, but were not limited to: (1) the development of a training program and procedure for contract owners: (2) the strengthening of licensee procedures and terms for contracts:
(3) the development of guidelines for monitoring contracts; (4) the development of a Siren Program Manual; and (5) the correction of performance indicator data submitted to the NRG .... " Revised Commitment:
EGG will discontinue the implementation of the commitments related to independent siren inspections as discussed above in the commitment statement.
Basis: There have been several improvements made in the EGG siren program since September 2000, including strengthening vendor oversight and strengthening the preventive maintenance and testing process as part of the EGG Management Model. EGG has robust vendor oversight programs, which are implemented under the EGG Management Model. These programs were not in place prior to the events that occurred in 2000. Additionally, new siren system installations were completed for Peach Bottom and Limerick by 2012. These new siren systems include upgraded equipment and are managed by a new vendor. These siren systems provide improved reliability, and jumpers are not needed or used as part of the new system. There is no adverse regulatory impact anticipated from deleting the commitment since there is improved vendor oversight, a strong preventive maintenance program, and new siren systems installed for Limerick and Peach Bottom that are highly reliable and comply with applicable regulatory requirements and guidance.