RA-19-0121, Commitment Change Evaluation Report for 2018

From kanterella
Revision as of 17:46, 7 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Commitment Change Evaluation Report for 2018
ML19087A267
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/28/2019
From: Simril T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-19-0121
Download: ML19087A267 (2)


Text

Tom Simril Vice President Catawba Nuclear Station Duke Energy CN01VP I 4800 Concord Road York, S C 2 9745 o: 803.701.3340 f: 803.701.3221 tom.simril@duke

-energy.com www.duke-energy.com

RA-19-01 21 March 28, 2019

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

-0001

Subject:

Duke Energy Carolinas, LLC (Duke)

Catawba Nuclear Station, Units 1 and 2 Docket Nos.: 50

-413 and 50

-414 Commitment Change Evaluation Report for 2018 Regarding the subject report requirement, there were no commitment change evaluations during the 201 8 calendar year for Catawba Nuclear Station.

This letter is being submitted in accordance with NEI 99

-04, Guidelines for Managing NRC Commitments. Questions should be directed to Sherry Andrews at 803

-701-3424. Sincerely,

Tom Simril

Vice President, Catawba Nuclear Station

(~DUKE ENERGY U. S. Nuclear Regulatory Commission March 28, 2019 Page 2 xc: C. Haney, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303

-1257 Michael Mahoney, NRC Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-8 B1A 11555 Rockville Pike Rockville, MD 20852

-2738 J. D. Austin, NRC Senior Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Station