RA-19-0121, Commitment Change Evaluation Report for 2018
| ML19087A267 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/28/2019 |
| From: | Simril T Duke Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RA-19-0121 | |
| Download: ML19087A267 (2) | |
Text
Tom Simril Vice President Catawba Nuclear Station Duke Energy CN01VP I 4800 Concord Road York, SC 29745 o: 803.701.3340 f: 803.701.3221 tom.simril@duke-energy.com www.duke-energy.com RA-19-0121 March 28, 2019 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC (Duke)
Catawba Nuclear Station, Units 1 and 2 Docket Nos.: 50-413 and 50-414 Commitment Change Evaluation Report for 2018 Regarding the subject report requirement, there were no commitment change evaluations during the 2018 calendar year for Catawba Nuclear Station. This letter is being submitted in accordance with NEI 99-04, Guidelines for Managing NRC Commitments.
Questions should be directed to Sherry Andrews at 803-701-3424.
Sincerely, Tom Simril Vice President, Catawba Nuclear Station
( ~ DUKE ENERGY
U. S. Nuclear Regulatory Commission March 28, 2019 Page 2 xc:
C. Haney, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 Michael Mahoney, NRC Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-8B1A 11555 Rockville Pike Rockville, MD 20852-2738 J. D. Austin, NRC Senior Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Station