L-19-046, Submittal of Emergency Preparedness Plan

From kanterella
Revision as of 23:16, 4 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submittal of Emergency Preparedness Plan
ML19056A095
Person / Time
Site: Watts Bar  FirstEnergy icon.png
Issue date: 02/20/2019
From: Bologna R D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML19056A112 List:
References
L-19-046
Download: ML19056A095 (2)


Text

FENOC ' SECURITY-RELATED/SUNS!

INFORMATION WITHHOLD UNDER 10 CFR 2.390 FirstEnergy Nuclear Operating Company Richard D. Bologna Site Vice President February 20, 2019 L-19-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

BeaverValley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Part 72 Docket 72-1043 10 CFR 50.54(q) 10 CFR 72.44(f) Beaver Valley Power Station Emergency Preparedness Plan Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 In accordance with 10 CFR 50.54(q) and 10 CFR 72.44(f), FirstEnergy Nuclear Operating Company (FENOC) hereby submits a recent revision to the Beaver Valley Power Station Emergency Preparedness Plan (EPP). This revision was implemented on January 31, 2019. The change to the EPP was assessed under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan. This notification is being submitted within 30 days of implementation of the change as required by 10 CFR 50.54(q)(5).

The change continues to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E. In addition, as required by 10 CFR 50.54(q)(5), the attachment to this submittal includes a summary analysis of the change to the EPP. The revised EPP pages reflecting the changes discussed in the attachment have been included as an enclosure to this letter. The attachment and the enclosure is not for public disclosure as they contain information as defined in the Sensitive Unclassified Non-Safeguards Information (SUNSI) Policy. The information contained in the attachment and the enclosure should A J ,15 be withheld in accordance with 10 CFR 2.390. / f. 'T ;t/J//552~

J!
-IL ;Jt{5S THE ATTACHMENT AND THE ENCLOSURE TO THIS LETTER CONTAIN SECURITY-RELATED/SUNS!

INFORMATION.

WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ATTACHMENT AND ENCLOSURE TO THIS LETIER, THIS LETTER IS UNCONTROLLED SECURITY-RELATED/SUNS!

INFORMATION WITHHOLD UNDER 10 CFR 2.390 Beaver Valley Power Station L-19-046 Page 2 This submittal also satisfies the reporting requirements associated with 10 CFR 72,44(f), which stipulates that within six months after any change is made to the Emerge*ncy Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards.

There are no regulatory commitments contained in this submittal.

If there are any questions or if additional information is required, please contact Mr. Steve Sawtschenko, Manager-Emergency Response, at (724) 682-5767.

Richard D. Bologna Site Vice President

Attachment:

Beaver Valley Power Station (BVPS) Emergency Preparedness Plan (EPP) Change Summary Analysis

Enclosure:

A. EPP-Plan-Section-?, Emergency Facilities and Equipment, Revision 31 revised pages cc: NRC Region I Administrator NRC Resident Inspector (w/o enclosure)

NRC Project Manager (w/o enclosure)

Director, NRC Division of Spent Fuel Management, ONMSS (w/o enclosure)

Director BRP/DEP (w/o enclosure)

Site BRP/DEP Representative (w/o enclosure)

THE ATTACHMENT AND THE ENCLOSURE TO THIS LETTER CONTAIN RELATED/SUNSI INFORMATION.

WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ATTACHMENT AND ENCLOSURE TO THIS LETTER, THIS LETTER IS UNCONTROLLED