|
---|
Category:Letter type:L
MONTHYEARL-20-006, Unit 2, Emergency Plan Implementing Procedure Revision2020-02-10010 February 2020 Unit 2, Emergency Plan Implementing Procedure Revision L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2019-12-26026 December 2019 Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-16016 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-058, Statement of Payment of Civil Penalty2019-12-11011 December 2019 Statement of Payment of Civil Penalty L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-0505 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met2019-10-0303 October 2019 Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies2019-09-30030 September 2019 Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-0422019-09-12012 September 2019 Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 L-19-041, Cycle 2 Steam Generator Tube Inspection Report2019-08-27027 August 2019 Cycle 2 Steam Generator Tube Inspection Report L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation2019-08-14014 August 2019 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions2019-08-0808 August 2019 Unit 2 - Forward Emergency Plan Implementing Procedure Revisions L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2019-06-20020 June 2019 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations L-19-016, Annual Radiological Environmental Operating Report - 20182019-05-15015 May 2019 Annual Radiological Environmental Operating Report - 2018 L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report2019-04-24024 April 2019 Submittal of Revision 0 of Cycle 3 Core Operating Limits Report L-19-015, Annual Non-Radiological Environmental Operating Report - 20182019-04-11011 April 2019 Annual Non-Radiological Environmental Operating Report - 2018 L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision2019-03-0707 March 2019 Unit 2 - Emergency Plan Implementing Procedures Revision L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 22019-03-0707 March 2019 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR)2019-01-29029 January 2019 Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation2019-01-24024 January 2019 American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2018-11-26026 November 2018 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors2018-01-25025 January 2018 Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-09-24024 September 2015 Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-06-29029 June 2015 Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. L-88-017, Response Clarification to Generic Letter 88-0172013-08-13013 August 2013 Response Clarification to Generic Letter 88-017 L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 20032003-12-18018 December 2003 Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 2020-02-10
[Table view] |
Text
FENOC ' SECURITY-RELATED/SUNS!
INFORMATION WITHHOLD UNDER 10 CFR 2.390 FirstEnergy Nuclear Operating Company Richard D. Bologna Site Vice President February 20, 2019 L-19-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
BeaverValley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Part 72 Docket 72-1043 10 CFR 50.54(q) 10 CFR 72.44(f) Beaver Valley Power Station Emergency Preparedness Plan Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 In accordance with 10 CFR 50.54(q) and 10 CFR 72.44(f), FirstEnergy Nuclear Operating Company (FENOC) hereby submits a recent revision to the Beaver Valley Power Station Emergency Preparedness Plan (EPP). This revision was implemented on January 31, 2019. The change to the EPP was assessed under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan. This notification is being submitted within 30 days of implementation of the change as required by 10 CFR 50.54(q)(5).
The change continues to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E. In addition, as required by 10 CFR 50.54(q)(5), the attachment to this submittal includes a summary analysis of the change to the EPP. The revised EPP pages reflecting the changes discussed in the attachment have been included as an enclosure to this letter. The attachment and the enclosure is not for public disclosure as they contain information as defined in the Sensitive Unclassified Non-Safeguards Information (SUNSI) Policy. The information contained in the attachment and the enclosure should A J ,15 be withheld in accordance with 10 CFR 2.390. / f. 'T ;t/J//552~
- J!
- -IL ;Jt{5S THE ATTACHMENT AND THE ENCLOSURE TO THIS LETTER CONTAIN SECURITY-RELATED/SUNS!
INFORMATION.
WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ATTACHMENT AND ENCLOSURE TO THIS LETIER, THIS LETTER IS UNCONTROLLED SECURITY-RELATED/SUNS!
INFORMATION WITHHOLD UNDER 10 CFR 2.390 Beaver Valley Power Station L-19-046 Page 2 This submittal also satisfies the reporting requirements associated with 10 CFR 72,44(f), which stipulates that within six months after any change is made to the Emerge*ncy Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards.
There are no regulatory commitments contained in this submittal.
If there are any questions or if additional information is required, please contact Mr. Steve Sawtschenko, Manager-Emergency Response, at (724) 682-5767.
Richard D. Bologna Site Vice President
Attachment:
Beaver Valley Power Station (BVPS) Emergency Preparedness Plan (EPP) Change Summary Analysis
Enclosure:
A. EPP-Plan-Section-?, Emergency Facilities and Equipment, Revision 31 revised pages cc: NRC Region I Administrator NRC Resident Inspector (w/o enclosure)
NRC Project Manager (w/o enclosure)
Director, NRC Division of Spent Fuel Management, ONMSS (w/o enclosure)
Director BRP/DEP (w/o enclosure)
Site BRP/DEP Representative (w/o enclosure)
THE ATTACHMENT AND THE ENCLOSURE TO THIS LETTER CONTAIN RELATED/SUNSI INFORMATION.
WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ATTACHMENT AND ENCLOSURE TO THIS LETTER, THIS LETTER IS UNCONTROLLED