MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] |
Text
NRC FoRM 195 (2-76)+U.S.NUCLEAR REGULATORY i 1MISSION DOCKET NUMBER NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL FILE NUMBFR o TO: Mr O'Reilly FROM: Niagara Mohawk Wg Corp Syracuse, NY R R Schneider DATE OF DOCUMENT 3-16-76 DATE RECEIVED 3 19 76%LETTER.QORIGINAL Scot v DESCRIPTION C3 NOTOR IZE 0 0 UN C LASS IF I E 0 PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED none signed Ltr re IK Builetin 76-Ollfurnishing info conce n-ing integrety of isolation condensers tubes...PLANT NAME: Nine Mile Pt/Pl;~8~0@e~ZDG SAFETY ASSIGNED AD: BRANCH CHIEF: FOR ACTION/INFORMATION ASSIGNED AD: BRANCH CHIEF~ENVIRO 3-22-76 ehf PROJECT MANAGER: LIC~SST PROJECT MANAGER~LIC~ASST EG FIL NRC PDR E INTERNAL D IST RIBUTION ERNST I&E GOSSICK&STAFF LPDR~su~o TIC~NS ASLB NRC FORM 196 (2-76).SEh PROJECT MANAGEMENT BOYD P COLLINS HOUSTON PETERSON MELTZ HELTEMES j SKOV HOLT ENG N~EER C KNIGHT SIHI<EIL PAVLICKI REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZt IAN RUTBERG EXTERNAL DISTRIBUTION NATL LAB REG, V-IE LA PDR CONSULTANTS BENAROYA IPPOLITO OPERATING REACTORS STELLO OPERATING TECH EISENHUT SHAO BAER SCHWENCER GR3JIES SITE SAFETY&E R ANALYSIS DENTON&MULLER BROOKEIAVEN NATL LAB ULRIKSON(ORNL)
ALLARD SPANGLER SITE TECH GA&IILL STEPP HULMAN SITE ANALYSIS VOLLMER BUNCH J, COLLINS KRE GER CONTFtOL NUMBER I l 3 C~~\'i,g I NIAGARA MOHAWK POWER CORPORATION NIAGARA~i MOHAWK.300 ERIE BOULEVARD.
WEST SYRACUSE.N.Y.13202 WarI,ch 16, 1976 A,.Jambe P.OIReilLy S~e&orxate o$ReguLatotcg Op~os United S~n NucLearI.ReguLatorIy Comm&ak on Region I 631 ParI,k Avenue, King o$PrI.@earn, Pa..19406 3 pl q0~>/ls-~/>~TIT~&r RE: Sock&No.50-220 on cnp.~o VearL h(rL.O'Reify: In rxeeponee Xo IE BuLL~n 76-01 dated MarI.ch 9, 1976 Che golLoeing~(orIm~n m rIeqturIed
'and ar.enuInmated rin See enclosure~supplied.1.a)The ietegrte@o$She~option coIideJIren.'a Wbu~being maQ>-4ained C&u peruo&c saIIIp&ng and evaLuation o$She~topic content o$Che sheLL aide, IrraterL.Timur.aampLing and evaLuation Iv~occurs once an even@96 bout peruod.Milking XkQ, peruoNc aurLveM'ance
~n'he Mne (rIame convILitted, Lt m (eLt Chat verug smaLL Leakr.IIrLom Xhe pruInarug sgaZem Co Che sheLL Irratw aide can.be, dMeMed and app<oprmu!e action Wken be(orte Xh~prIopagation Co a.size uItu.ch IrrouLd prIoduce d&mtabLe veldt e$gueet ax~on above, backgrLound.
b)Non-derWu~ve CerWng orL hydrLoa~c CerWng IIIML be.pecforInIed at Che net rLe)ueZLng oLtage.c)Actionr.uIerLe pLanned and anpLemented pru.os Co We aruA~)ueL LoaNng rin 1969, W araurIe prIoIIIpk dote~on o$an~olation condenrerL Wbe brLeak.The.moLation condeeserI.
ay6Cem at Nne NXe Po~&Unit I concluder (ourL condense error., Wo rin each aa$~gya4em.Each ayakeInLb a 100'n sgrtem, ChM even rin Che unLikeLg evert o$moLation o$one, sg6Cem We otherL IIrouLd be InorI.e Chan abLe W prIovLde We actions rceq~ed.To guarded agcu.m4 a, Wbe br'.eak, rex~on monktom were placed~n She veIM grI.om each o$ghe fourL condenr.error..
Thee mo~orLr prI.os&moLation o$NIe condeeserI.(agleam auppLg and condeua e, rL~n Co Ae rxean.os)upon, dWe~on o$a, prIedeteenkned LeveL o$radiation.
That set po~nt~such Chat We ceLeue IrrouLd be LoIu.ted Co 285 o$10CFR20 dose fin~.Ad~onalLcg, Ae ve<ruxdiafion moI~orLr.mead out~n She Co>~oL Room and arLe logged once, perL a1Li)4 (ChrLee Mnm drag).Any Wend rin ver<rux~on Lev~IrrouLd Chm be detected urdu,n an eigt<bout peru'.od and apprI.o~e action Wken.
r~~?AGE 2"'~E: Sock&No.50-2~0~blanch 16, 1976~c j 2.Complied.3.The, ceps iv~be.sub~~ed iebtMn 30 days, as aequesCed, (scorn compZ~on date.Vwy WuLy yo~, 730/aih Enc.OruginaL Signed by R.R.Schneidm R.R.Sc nu.eA Ace Pkesi de&ELe~c Operations CC: NRC Reg~onaL O]gce o$Inepe~on and En(orccement