L-11-051, Fitness-For-Duty Performance Data Revision

From kanterella
Revision as of 10:37, 30 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fitness-For-Duty Performance Data Revision
ML110450257
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/07/2011
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-11-051
Download: ML110450257 (3)


Text

FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road Perry Ohio 44081 Mark B. Bezilla Vice President 440-280-5382 Fax: 440-280-8029 February 7, 2011 L-1 1-051 10 CFR 26.717(e)ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

SUBJECT:

Perry Nuclear Power Plant, Unit 1 Docket No. 50-440, License No. NPF-58 Fitness-For-Duty Performance Data Revision Enclosed is a revision to the 2009 Annual Fitness-For-Duty (FFD) Program Performance Data for the FirstEnergy Nuclear Operating Company's (FENOC) Perry Nuclear Power Plant that was submitted pursuant to 10 CFR 26.717(e) on February 26, 2010, by Letter L-10-068.Enclosure A provides revised FFD Program performance data for personnel subject to the requirements of 10 CFR 26 for the period January 1, 2009 through December 31, 2009.Enclosure C of Letter L-10-068 provides Fatigue Management Data. Subsequent to the 2009 FFD Program Performance Data submittal, three additional work hour control waivers were approved.

Per discussion with an NRC Fatigue Management representative, Mr. Michael Boggi, a hand written mark-up of the changes on the original submittal is enclosed.

Only page 2 of 2 of Letter L-1 0-068 Enclosure C changed. All other data submitted for the 2009 Annual Fitness-For-Duty (FFD) Program Performance Data remains the same.There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Robert B. Coad, Manager -Regulatory Compliance, at (440) 280-5328.Sincerely, Mark Bezilla

Enclosure:

A. Fatigue Management Data Revision cc: Mr. Michael Boggi NRR Project Manager NRC Resident Inspector Office NRC Region III 4DA.