|
---|
Category:Letter
MONTHYEARML20205L6042020-07-23023 July 2020 Endorsement of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with the Balance of Plant, Dated July 2020, by August 30, 2020 ML20199M3682020-07-17017 July 2020 NRC Review of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with Safety-Related and Important-to-Safety Functions, Dated July 2020 ML20154K5662020-06-0101 June 2020 Availability of NEI 20-09, Performance of PRA Peer Reviews Using the Asme/Ans Advanced Non-LWR Standard, for NRC Review and Endorsement ML20141L7882020-05-20020 May 2020 NEI - Comments on Draft Micro-Reactor Applications COL-ISG-029, Environmental Considerations Associated with Micro-Reactors ML20134J0332020-05-13013 May 2020 Submittal of Response to Request for Additional Information (RAI) for NEI 14-05A, Revision 1, Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services ML20115E4132020-04-24024 April 2020 Endorsement of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with the Balance of Plant, Dated April 2020 ML20100G9022020-04-0909 April 2020 NEI - Submittal of NEI 15-03, Revision 3, Licensee Actions to Address Nonconservative Technical Specifications ML20065N1592020-03-0505 March 2020 NEI - Recommendations for Streamlining Environmental Reviews for Advanced Reactors ML19318F1682020-01-0606 January 2020 Verification Letter for Technical Reports Benchmarks for Quantifying Fuel Reactivity Depletion Uncertainty - Revision 1-A and Utilization of the EPRI Depletion Benchmarks for Burnup Credit Validation - Revision 2-A ML19351D2742019-12-17017 December 2019 NEI - Request for NRC Review and Endorsement of NEI 00-01, Guidance for Post Fire Safe Shutdown Circuit Analysis, Revision 4, and NEI 04-02, Guidance for Implementing a Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 5 ML19330G0982019-11-26026 November 2019 NEI - Endorsement of NEI White Paper, Changes to NEI 10-04 and NEI 13-10 Guidance for Identifying and Protecting Digital Assets Associated with the Balance of Plant, Dated November 2019 ML19316C6572019-11-12012 November 2019 Fee Exemption Request for Activities Performed for NRC Review and Endorsement of NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 1 ML19316C7142019-11-12012 November 2019 (Nei), NRC Review and Endorsement of NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 1 ML19269E0562019-09-26026 September 2019 Transmittal of EPRI Benchmark Revision 1-A, Utilization Revision 2, Utilization Revision 2-A, and NEI 12-16, Revision 4 ML19261C4702019-09-18018 September 2019 NEI - Review and Endorsement of NEI 18-11, Maintaining 10 CFR Part 95 Facility Clearances for Voluntary Program Participants, Revision 1, Dated September 2019 ML19134A2892019-07-31031 July 2019 Final Proprietary Safety Evaluation for Radics Topical Report ML19189A1122019-07-19019 July 2019 Final Safety Evaluation Cover Letter to EPRI Topical Reports 3002010613 and 3002010614 ML19196A2922019-07-15015 July 2019 NEI Comments on Draft Regulatory Guide (Dg), DG-1356, Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments, 84 Fed. Reg. 25077; Docket Id NRC-2019-0086 ML18184A4092019-06-19019 June 2019 Final Proprietary Safety Evaluation of PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (CAC No. MF8075; EPID L-2016-TOP-0006) ML19141A0292019-06-13013 June 2019 U.S. Nuclear Regulatory Commission Verification Letter for Electric Power Research Institute Report 3002013039, EPRI MOV Performance Prediction Program: Addendum 10 to EPRI 103237 R2: PPM Version 4.0 Software Changes ML19123A2372019-05-0303 May 2019 Fee Exemption Request for Activities Performed for the NEI Composite Adversary Force ML19196A2772019-04-11011 April 2019 NEI Letter Re Industry Review of the NRC Draft Comment Disposition Table ML19109A1272019-04-11011 April 2019 Industry Review of the NRC Draft Comment Disposition Table ML18267A3192019-03-25025 March 2019 Second Draft Safety Evaluation of Pressurized Water Reactor Owners Group-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (Cac No. MF8075; EPID: L-2016-TOP-0006) ML19196A2732019-01-31031 January 2019 NEI Letter Providing Draft SE Comments to EPRI Topical Reports 3002010613 and 3002010614 ML19058A2602019-01-29029 January 2019 PWR & BWR Knowledge and Abilities Master Catalogs ML18365A0372019-01-25025 January 2019 Staff Evaluation of Electric Power Research Institute Report 3002013039, EPRI MOV (Motor Operated Valve) Performance Prediction Program: Addendum 10 to EPRI 103237-R2: PPM (Performance-Prediction Model) Version 4.0 Software Changes ML18352A8152018-12-18018 December 2018 Fee Exemption Request for NEI 18-11, Maintaining 10 CFR Part 95 Facility Clearances for Voluntary Program Participants, Dated November 2018 ML18348B2102018-12-14014 December 2018 Endorsement of Addendum 7 to NEI 08-09, Evaluating and Documenting Use of Alternative Cyber Security Controls / Countermeasures, Revision 6 Dated April 2010 ML18331A1562018-12-14014 December 2018 Acknowledgement of Receipt of Industry Initiative on Open Phase Condition, Revision 2 ML18289A7742018-12-10010 December 2018 Denial of Fee Exemption Request for Charges Incurred in Review of a Special Project Related to NEI ML18312A2732018-11-0808 November 2018 Follow-Up on Request for Additional Information on EPRI MOV Performance Prediction Program: Addendum 10 to EPRI 103237-R2: PPM Version 4.0 Software Changes ML18275A3872018-11-0505 November 2018 Requests for Withholding of EPRI MOV Performance Prediction Program: Addendum 10 to EPRI 103237-R2: PPM Version 4.0 Software Changes ML18234A0382018-08-21021 August 2018 Disputes Fees Described in Invoice Lfb 18-5202 ML18072A0022018-06-25025 June 2018 U.S. Nuclear Regulatory Commission Staff Safety Evaluation of PWROG-15060-P, Pump Suction Gas Accumulation Operability Criteria Guidance (Letter) ML18121A2462018-05-31031 May 2018 Draft Safety Evaluation for the Electric Power Research Institute (EPRI) Topical Report 3002010613, Benchmarks for Qualifying Fuel Reactivity Depletion Uncertainty Revision 1 and Topical Report 3002010614, Utilization of the EPRI Depletion 2020-07-23
[Table view] |
Text
Code of Federal Regulations
170.5 1 10 CFR 170.2(m) Applying for or has applied for since March 23, 1978, review of an item under the category of special projects in this chapter that the Commission completes or makes whether or not in conjunction with a license application on file or that may be filed.
10 CFR 170.3 Definitions provides that "Special projects means specific services provided by the Commission for which fees are not otherwise specified in this chapter. This includes, but is not limited to, contested hearings on licensing actions directly related to U.S. Government national security initiatives (as determined by the NRC), topical report reviews, early site reviews, waste solidification activities, activities related to the tracking and monitoring of shipment of classified matter, services provided to certify licensee, vendor, or other private industry personnel as instructors for 10 CFR part 55 reactor operators, reviews of financial assurance submittals that do not require a license amendment, reviews of responses to Confirmatory Action Letters, reviews of uranium recovery licensees' land-use survey reports, and reviews of 10 CFR 50.71 final safety analysis reports. Special projects does not include activities otherwise exempt from fees under this part. It also does not include those contested hearings for which a fee exemption is granted in §170.11(a)(2), including those related to individual plant security modifications".
10 CFR 170.12(d) Special project fees provides that (1) All special projects performed by the Commission, unless otherwise exempt from fees or for which fees are otherwise specified in this part, will be assessed fees to recover the full cost of the service provided. Special projects means specific services provided by the Commission, including but not limited to- (i) Topical reports; (ii) Financial assurance submittals that do not require a license amendment; (iii) Responses to Confirmatory Action Letters; (iv) Uranium recovery licensees' land-use survey reports; (v) 10 CFR 50.71 final safety analysis reports; (vi) Contested hearings on licensing actions directly involving U.S Government national security initiatives, as determined by the NRC; and (vii) Responses to Touhy requests t hat require the NRC staff to expend more than 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> of official time. Fees for Touhy requests will be billed at the appropriate hourly rate established in §170.20. (2) The NRC intends to bill each applicant or licensee at quarterly intervals until the special project is completed. Each bill will identify the special project, including any documents submitted for review or the specific contested hearing, and the related costs. The fees are payable upon notification by the Commission.
specific services provided by the Commission for which fees are not otherwise specified specific services provided by the Commission, including but not limited to-" "the NRC intends to bill each applicant or licensee at quarterly intervals until the special project is completed."
/RA/