ML18082A894

From kanterella
Revision as of 13:06, 13 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1980
ML18082A894
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/11/1980
From: MILLER L K
Public Service Enterprise Group
To:
Shared Package
ML18082A893 List:
References
NUDOCS 8008150348
Download: ML18082A894 (17)


Text

AVERAGE DAILY UNIT POWER LEVEL M)NIH July 1980 DAY AVERAGE DAILY POWER LEVEL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15. 16 Pg. 2 of 18 8.1-7.Rl (MWe-NET) 1093 1072 1113 1091 1097 1114 1115 1020 1063 1131 1031 871 1114 1006 1127 1074 80081503171*

OOCKET NO. 50-272 UNIT Salem Ill DATE August 11, 1980 COMPLETED BY L. K. Miller* TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 17 1044 18 1076 19 1083 20 1067 21 1118 22 1035 23 1067 24 1060 25 1096 26 1053 27 1024 28 1080 29 1017 30 945 31 948 r--r . 1. UnitNane:

____ s_a_l_e_m_#_l

________ _ 2. Reporting Period: ___

______ _ 3. Licensed 'nleoral.

Power (K'it) : _____ 3_33_8 ___ _ 4. Naneplate Rating (Gmss l+le): 1135 s. Design Electrical Rating (Net Ml'1e) : 109 0 6. Maxlll!um Dependable Capacity "(Gross lofie) :_1_1_24 ___ _ 7. Maxillllll1 Dependable Capacity (Net Ml'1e) : 10 7 9 ------Notes: 50-272 rxx:I<ETID.:._--.-

__ _,,_-._...,,..,,..,,_

CATE : August 11, 1980 a:M?IEl'ID BY: L. K. Miller TEt.EPB::NE:

609-365-7000 X507 8. If Changes Occur :in Capacity Rat:ings (Itars Nlll!Cer 3 'lbrou;h 7) Since Last Report, Give Reason: NONE 9. Power Level To Which If ArrJ (Net I-We): _______ N_O_N_E ____________

_ 10. Reasons For Restrictions, If Arrj: _____ N_ON_E-------------,---------

'!his M:lnth 744 ll. :Ei:lurs In Reporting Period l2. Nl.lllCer Of Sours Reactor Was Critical 744 13. Reactcx Reserve Shutd:::lwn Hours 0 14. Hours Generator On-Line. 744 15. Unit Reserve Shutdown Hours 0 16. GJ:Css 'Ibmnal. Energy 2.440.018

17. Gmss Electrical Energy Generated(Mm) 821,250 18. Net Electrical Energy Generated(?-W) 788,183 19. Unit Service Factor 100 20. Unit Availability Factor 100 2l.. Unit Capacity Factor (Using MOC Net) 98. 2 22. Unit capacity Factor (Using DER Net) 97. 2 23. Unit Forced Outage Rate 0 Year to Date 5,111 4,922 0 4,802 0 14,974,346.8 5,075,590 4,859,713 94 94 88.1 87.2 6.1 24. Shu1:dcwns Scheduled OVer Next 6 M::nths (Type, Date, and Duration of Each): REFUELING

--SEPTEMBER 20, 1980 Cumul.ati ve 27 ,072 15,010 22.7 14,333.l 0 42,510,643.8 14,243,090 13,489,303 52.9 46.2 45.7 36.1 GROSS THERMAL ENERGY GENERATED FOR FEBRUARY.

1980 CORRECTED TO 1,765,246

25. If Shut Down At End of Report Period! Estimated Date of Startup: ____ N_f_A __________

_ :26. Units In Test Status (Prior to Conrercial.

<:p!ration)

:B-l-7.B2 Pg. 3 of 18 Forecast 09/30/76 11/01/76 12/20/76 Achieved 12/11/76 12/25/76 06/30/77 ' I NJ. 80,-.140 80-142 80-143 80-145 80-147 80,-,149 80-151 80-153 80-155 1 DATE 7/1/80 7/9/80 7/12/80 7/14/80 7/14/80 7/22/80 7/27/80 7/28/80 7/29/80 F: Forced s: Scheduled Page 4 of 18 8-1-7.Rl TYPE 1 F F F F F F. s s s 2 UNIT SHlJI'l.U'INS l\ND PCMER REOOCTIONS REPORT MJlmI July 1980 ME'l100 OF IXJRATIOO SHIJITI?-l; (IDJRS) IXMN REAC'IDR 0.0 A 5 0.0 A 5 0.0 A 5 0.0 A 5 0.0 A 5 0.0 A 5 0.0 H 5 o.o H 5 0.0 H 5 Reason: A-E)]uipnent Failure(Explain) a-Maintenance or Test C-Refueling

[}-Regulatory Restriction LICENSE E.VENl' REPORT I ---------------------------E-q>erator Training & License Examination F-Jl.l:Jministrative Error(Explain)

It-Other (Explain)

SYSTEM <lJ.n'OOENl' OJDE4 OJDES HF FILTER HF FILTER HH FILTER HF FILTER HF FILTER HH HTEXCH RC zzzzzz RC zzzzzz RC zzzzzz 3 M9thod: 1-Manual 2-Manual Scram. 3-Automatic Scram. 4-Continuation of Previous Outage 5-Load Reduction 9-0ther 50-272 DOCKET NO.:

UNIT 'NAME: Salem. /fl DATE: August 11, 1980 COMPLETED BY: Ii; K. Miller TELEPHONE:

609-365-7000 X507 CAUSE 1\ND OJRROCTIVE ACTION 'ID PREVENI' RIDJRRENCE Repair /113A Traveling Screen Repair /113B Traveling Screen Clean /112 Condensate Pump Suction Strainer Repair #12A Traveling Screen Repair 1!12A Traveling Screen Clean #llA Circ. Water Box Fuel Fuel Fuel 4 Depletion Depletion Depletion Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report(LER)

File (NURFD-0161) 5 Exhibit 1-Same Source l MAJOR PLANT MODIFICATiliS REPORT MONTH July *DCR NO. PRINCIPLE SYSTEM lED-0084 Annunciator Mods. lED-0150 Feed and Condensate 1ED-0271A Circulating Water lEC-0372 Steam Generator Feed and Condensate lET-0542 Auxiliary Feedwater lEC-0756 Auxiliary Feedwater Storage Tank 2EC-0757 Auxiliary Feedwater 2EC-0901 Steam Generator Level Instrumentation 2EC-0920 RHR lEC-0995 Spent Fuel lSC-0001 Control Room Area Mens Room lSC-0107 Steam Pressure Transmitters


DOCKET

.....

UNIT NAME. kalem 1 DATE: August 11, 1980 COMPLETEn BY: L. K. Miller TELEPHONE:

609-365-7000 Ext. 507 .. SUBJECT Retest to support

  • Install Modify Modify Controls Test run AF Pump Motor Units 11 and 12 and Pump Turbine Unit 13 Revise Low and Low-Low Level Alarm Revise Low and Low-Low Level Alarm Setpoint Revise Steam Generator Low-Low Level Setpoint from 11% to 18% Install RHR Pump Impeller Locknut Retrofit Kits Provide Weld Seam Encasements Convert to Ladies Room Block Bottom outlet of South Penetration Inlet Air Dampers (Install 38"Xl8" Chain Operator Damper) ------------------

* DESIGN CHANGE REQUEST 8-1-7. Rl Page 5 of 18 --------------------


50-272 MAJdR PLANT DOCKET li*: UNIT NAJI!': -""""""s...,a

.... le,...m ........ t .... n....._ ____ _ REPORT MONTH July 1980 DATE: August 11, 1980 *OCR NO. lED-0084 lED-0150 1ED-0271A lEC-0372 lET-0542 lEC-0756 2EC-0757 2EC-0901 2EC-0920 lEC-0995 COMPLETED BY: L. K. Miller TELEPHONE:

609-365-7000 X 507 lOCFRS0.59.

SAFETY EVALUATION System is not safety related and does not affect safety related systems. This design change only adds vibration eliminators to non safety related piping. The bases of the Technical Specifications are not affected by this change. No presently performed safety evaluations are affected nor are any new hazards created. <" Revising roof sections and flashing at the circulating water intake structure enclosure does not alter any approved design criteria, procedures or setpoints to this non safety related system. These changes are required to correct the source of control air for valves 1TD29 and 1TD31. They do not change the function of the valves. There are no changes to any Technical Specifications and no additional safety analysis need be performed.

It is not safety related and not affect any safety related system. The subject pump tests are required by the NRG. The tests required do not violate any pump design conditions and will prove the performance of the pumps and the drivers. The intent of the design change is to improve operator information and enhance plant safety. The intent of the design change is to improve operator information and enhance plant safety. A USQ is not involved since a setpoint change is being made to maintain the margins dictated by the safety analysis.

In addition, *:there is neither a system functio.nal or logic modification.

The change is part of the corrective action to a potential deficiency reported.

by Westinghouse and P.S.E.&G.

to the NRG. The installation of impeller locknut kits on the No. 21 & 22 RHR pumps does not pbse an unreviewed safety question as this change will forestall a loosening of the impeller locknuts as noted on NRG IE Circular No. 79-19. The revision detailedin this package is a repair design. The mentation of this DCR will not affect the safe shutdown of the NSSS equipment or jeopardize the health and safety of the general public. Page 6 of 18

  • DESIGN CHANGE REQUEST 50-272 MAJOR PLANT MODIFICATI04t DOCKETM.:

UNIT N : Salem /fl REPORT MONTH July 1980 DATE: August 11, 1980 *DCR NO. lSC-0001 lSC-0107 COMPLETED BY: L. K. Miller TELEPHONE:

609-365-7000 x 507 lOCFRS 0. 5 9. SAFETY EVALUATION This DCR consists of changing an existing Mens Room (toilet) into a Womens Room (toilet).

It is not safety related and no major changes in existing piping are necessary, therefore, no moderate energy break analysis or flooding problem is involved.

There is no interaction with any safety related system and no unresolved safety question is present. This DCR consists of providing a damper to close off an outside air intake duct in the South (outer) Penetration Building to prevent freezing of feeler lines for steam pressure transmitters.

It is not safety related;*

no major change in the vent duct is required and no*:fire protection systems are affected.

Therefore, it does not affect any presently performed safety analysis norc:does it create any new hazards. Page 7 of 18

  • DESIGN REQUEST

-.. *-* . . . !-+----------------------


**-*--*-----------


*----*----------*****--*----------


+-'<

  • 3 SALEM GENERATING STATION s Ai=' ET v-RF L 11 r E:O Eli iii: ?"1i: tlif wriR1( ORoE:_R_ -i.is-r.*
  • -------* ------------
  • ------------1 0001 6 .,-. 6 WORK 1 ORDER a NUMBER DEPT EnUIPMENT IDENTTFTCATTON EXPLANATION OF WORK PERFORMED 10 11 *-------------------------*---------------
  • -----*----*------_, __________________________________________________

---*------------


12 10 1] II <l00636 M VALVE, 1CV278 :;

13 DESCRIPTION OF PROALEM, PACKING -LEAK, HEAT XCHANGER VALVE 17 18 14 19 "1-* ________________________

T J_\:'f: __!. CT_!_Q_N 20 21 16 22 23 17 q 12616 M PUMP,t2CHARGING PUMP 18 19r--------------------,---..D"'E"S"C'"'R

.. I'"'P'"T"'I"O""N'*'O"'.

F,.--P._-R=o"B.-L--F._,..M.--,----c EA K IM 0 IL . c OOL ER 20 1'2' 25 26 27 CAUSE, CORROSION

!--------------------------*--------------------------*------------------------------------------<

22 23 CORRECTIVF.

ACTION, REPLACF.D OTL COOLER 24 25f-:9,.-,t--=2,_.,6.,-o,8,-,,6-*,---,,,.,,--.

1*---,-,--,-1-:o-:o--=E-c-L=E7'V-,-A"'T-=1=0-,-,N-A-=r=R-,--L=o-=c-,-,K---------------------------------------------;---:------i 2R 29 30 31 *2 3: 34 .-' a e -21,_ ___

DE

__

cnRRECTIVE ACTION, REPLACED BEARING ON DOOR LOCK _" : 2oa9 37 38 '=117123 M 39 _PUMP, 11BORIC ACID *IB *n 50 51 52 ------------------------<

a:: ------------ms CRIPT10 r;,r---FiFPR 0


ME CHAN rc:**n_---SE' A C-wIPP 40 -55 INSTALLED NEW SHAFT, BEARING, SEALS AND A i;ftC1HiHtCALSEAI----*-----------------------------j51 41 a cnRRECTIVE ACTION, " 5B " 59 -PUMP, 15 SW STRAINER 60 ' ---------------

---*---------


*-*-*-

-*---

-*-----** -----------*-----*-----*-*---*****--**-------*----****----------------------

______________

____,61 '5 917209

__ c_P_. __

__ P._R_o_A_L_F_M_, ________

__ s._F __ n __ R_A_s._H_o_R_T_P_E_R_r_o_o_o_F

____ 66 ' 50 67 51 68 52t-----+-----------------*--*--

  • ---*-** --*--* ----***-*---**-*--
  • -" . ---**-**-*--**-*-. -----------*--*----------

---

--**-*--*---**---***----*----------*----69 70 53 71 72 /---+-----------------------------*-*


*-----------------------


**--


*-------*---------------------!

55 73 7,1 % 57 ....... ------

    • -....... -****-'"'" .. -*--*-*'" -*--**. -Page 8 of 18 7h *----*------*--*-*---

*----*---------**----**-*----*-------*

-*---* ----_______ ._\


* --*---------------e -----------------


*----------------------------*----


+--;

1 2 3 SORTED BY SALEM GENERATING STATION

--. ----J:'fy -lffUTfn nRfiER -i_-rj(:;

000?. 5 " WOPK 7 ORDER 8 NUMBER l")EPT g 10 11 12 13 q17692 M " 15 16 17 18 19 70 91R38ll M 21 12 23 2< 15 26 9271191 M '7 28 29 lo 31 ,. 32 927515 M l 34 35 36 37 38 927537 M 39. 40 " 42 43 44 927557 M 45 " " 48 49 50 927637 M 51 --* -------------------

EGIUJPMENT IDENTTFJCA TTON EXPLANATION OF WORK PERFnRMEO



*------*-----*-* ----------------------***---**---*-----*--* ------------*----

    • -. *-*-*------*-

--**---------*

1? .it AUX BLOG VENT SYS D #13 SERVICEWATER PUM D *DAMPER, lCAAll ------------

[) #12 FfiB EXHAUST FAN [) VALVE, 13MS16A ----------------!)

VALVE, 11SW153 ---n DflMPER, 1CAA3 "cnRRECTIVF ACTinN, tNSTALLEO TWO NEW SHOES 1::. --------------------------j16 17 18 ESCRIPTION OF PROBLEM, PRE-ROUGH FILTER MEDIA REQUIRES


***---**

---*-*-*------ME:"fiiT

  • --------------------------------
11. 23 __ C_ORREC T_l_YE ACT__!_

____ R_E_P_L_A_C_E_D_F_I_L_T_E_R

_________ P STRAINER ,., ;: ES (ifl:PTf 0 N OF PROBl EM OKEN SHE , 30 31 * .... __ c_n __

_____

__

__

CORRECTIVE ACTION, FREEfl UP DAMPER ANn RETESTED 33 3' ,..... 35 '--1 'J' 38 ,.. 39 \4** 40 -----------

  • 11 " (" 43 4*1 ol.5 4fi 4; __ c_n_R_R_E_C_T_I

_y_E Ac

____ R_E_P_L_A CED WORM REL T

__ c_n_ .. R_R_E __ c_, _T _T _V_E_A _C_T_I _O_Nc._, ____ v AL v E FURMAN TT ED "' 52 ---t. -55 56 ____ __, ----; 57 58 59 60 61 67 63 ------1:;

07 68 ------------------*--*------*-


. ------*-*---*--. ---* -----*--------**---

---.. --


69 52 53 !:i,I Page 9 of 18 55 56 57


*-------*-*-------****---*---

  • -

<

70 ".r 71 72 73 (.. --------------------

!--!----------------------------*------------------------*---------------------

' SORTED BY ' flEPARTMENT, WORKOROE_R_'Ni'i:--------

6 WORK 1 ORl)ER a NUMBER DEPT IDENTTFJCATION EXPLANATION OF WORK PERFORMEfl 1 2 ' 10 11 1--------------------


*--------------------


..

  • ----------------------------------

12 fO t1 12 13 " DESCRIPTTON OF PROBLEM, 1-------------------------

CORRECTIVE ACTION, FAILED TO OPEM LlJARICATED DAMPER HINGES AND LIMIT 5\'JTTCHES 13 15 IG J; 1, 19 15 ----'-----------------------------**'

16 9276113 M SERVICE WTR SPOOL PIECE rn AUX FDWTR 21 17 18 19 20 DESCRIPTION OF PROBLEM, CORRF.CTJVE

ACTION, AND BOLTS ARE PAtNTED AND CHEWED UP REPLACED NUTS AND BOLTS 22 23 ------------------<" .. 27

__

.. 26 CORRECTTVE ACTION, TEMPORAR!L Y FIXED OPERA;TOR, NEW OPERATOR :: --21>----------------------------------------------------

________

_



2a '29 30 31 32 33 DESCRIPTION OF PROBLEM, CORRECTIVE ACTION, * SIGHT GLASS ON OIL RESEVOIR LEAKING, ALSO POSSIBLE OIL COOLER LEAK 38 ,-39 40 -------------,---,----,-j_

41 ------------

REPLACED SIGHT GLASS, REPAIRED TUBE LEAK JN Ol:L COOLER 42 I *13. "' 1--------------------------------------


*--*---------------*-----------


*----



34 35 ':133000 M PUMP,13 AIJX 0 FD PIJMP 36 CR IP T TON OF PROBLEM, 3B 39 40 41 42 43 935327 PIPE, 16SW PUMP FLUSH LTNE 44 '5 46 47 -------------*--------------------

_ OESCRIPTTON

__ O_F' CONTROL LINKAGE' FROMGOVENOR TO 1MS52 BROKE ---------------:-1 4.5 *Hi II -,, 19 10 51 -)(fENOED--GOVEN(Hf


1::

58 59 HOLE IN FLUSH LINE ----------*-------------l60 Gl 62 63 '*-"i------------------------------------------------------------------------------------------\64 49 65 fir),,,_ g 51 SB 521---------------------------*-----------


* ---* ------___ .. __ --------------------------------------------


*---------**----------------------------*------------1 69 70 .. -53 71 '-Page 10 of 18 n 550--.-----------------------------------------------

  • ------------------------------1,3 74 -* n'-D ffi
  • ----------****------*

___ ,__ _______ ,._._ ___ ,,_ ... _____ .. __ *****------

---

  • e t-t----------------*--*--------------

*-----------------------------------------+-" 0007 s WORK 1 ORDER a NUMBER DEPT EQUIPMENT IDENTJFICATJON EXPLANATION OF WORK PERFORMED

!-----------------*------*-------------------*-*

DESCRIPTION OF PROBLEM, CAUSE, ACTION, P INSTRU, 1FA3970 DESCRIPTION

  • OF. PROBLEM, CORRECTIVf ACTION, P INSTRU, 1FA3972 DESCRIPTION OF PROBLEM, VALVE WILL NOT OPEN OIAPHRAMTORN REPLACED D RE A OJ usi'E:o :GI*

H* 12.STEAM GENERATOR FEEDWATER'FLOW INDICATE FULL SCALF. REPLACED 1FA3970 12.STEAM GENERATOR AUX. FEEOWATER FLOW .INDICATES FULL SCALE ,'..

CORRECTIVE ACTION, REPLACED 1FA3972 p* 'lNSTRU, BORIC ACID TANK #11 OF_ __

______________

____

__

cnRRECTIVE ACTION, REPLACED COMPARATOR P. 'INSTRUr 1Nll1 POWER RAfllGE OUT OF SPEC I

_ O_f' __

CnRRECT T VE ACTION, ADJUS;;*D-e:: 56 58 59 ._,

PT ION nF __

.. ________ __ n_F __

  • __ TR I PS A T __

61 cnRRECTIVF ACTION, READJUSTED RJSTAALE FOR 11% TRIP 62 63 4q p COMPON"'E

...

... -*-*------------------------------------1::

' . --... M 14 of 18 r------L.-------------*-----*

.. --------*---*----**--*-------*--------**---**

....... 55 57 ---'--------------**------------*------*------

67 *--*-**-.. "-***

70 71 *.._ 72 --------------*---------------------------------------" 74 75 ,, ----**---*-*--------*--*

    • ------*


    • ------------** ... ------*----------------------------------------------------------------------..
  • -H---------------------------------------*-------------------------------------------------------------+'-1 6 1.o.JORK 1 Of?nER 8 NUMBER DEPT EQUIPMENT IDENTIFICATION EXPLANATION OF WORK PERFORMEO r---------------------------*---------*--*--------*----------*---*----*-**--*-*---------------*-*-----------

*------------------------------!

10 11 CORRECTJVf ACTION, REPLACF.:0 RUPTURED OIAPHRAM 12 14

__

EE

__ T HEf'_J__IB_I=P-'-P-"E""'O'""".

._:_*""";

--'-:_,;,'--:

16 17 CAUSE, BROKEN PIN ON GOVENOR VALVE LINKAGE* 3 10 11 12 13 14 15 16 17 18 19 20 21 22 23 9:: . 26 27 18 20

__ _.:,V_A-=L'--V""'E""",--'1-6 S

S T_R A IN _______ _ 22 a DESCRIPTION OF PROBLEM, SOLENOID VALVE DAMAGED "

Ac ED v AL VE ' -* 26 M. !11 q361B4 ** . VALVE, 1SW169 ------------------------


28 129 !3o DESCRIPTION OF PROBLEM, VALVE JAMMED IN OPEN POSITION 28 29 30 31 32 33 34 t 3-38 39 40 . "

____________

--,-,----,--J 32 33 3< 35 t----------

36 q135% p CORRECTIVE ACTION, RETHREADED VALVE -STRPKED SET ----------------------*--------------------rm

r rs-1nrrwi;"Aur;c--

INSTRU, cnNTAINMENT PRESS RECORDER CH. 4 1--------------------*

42 43 " 45 46 47 48 " ( 1* r' I ; .-r r : c c c I 0, I 37 38 DESCRIPTION OF PROBLEM, RECORDER IS ERRATIC 50.c 51 39 52 -53 54 55 1------------------

40 '" 42 q1113t VALVE. t1SW"i8, ttFAN COTL UNIT 43 44 ,__ _____________

_ DESCRIPTION OF PROBLEM, VALVE DOES NOT INDICATE FULL ON CONTROL CONSOLE ,45 146r--------------------*-*----*---

  • -*---

*-

    • --**-*-------------*--*****---------------------------

___________

___, j47 CAUSE, LIMIT SWITCH NOT MAKING UP 1 ::1------------------------CORREC TJ VE AC LIMIT SW


1 50 51 52 ,__ ________________________


*** . -------*--* -----* ****-*-*--


  • --------------------------------*-j 56 57 58 59 60 61 52 63 64 65 66 67 68 69 c ( I :: Page 11 of 18 ;; Ci 551----------------------------------------------------------------------------------------------------------------1,3 Sf'i ;:w 10 ----------------------

*----*--***-------*----------



*---------

57

      • --------**-----*-* -*-*-----*-*-**-**
  • -... , .. 1 __

'"----------*-----------*-----------

---*-.. ---*---------------


*--*-------( SOOTED BY 3'LEM GENERATING STATTON -------*:*------------------------------------*-------------*

> **DEPA PTMENT, WORK ORDER Nn. -*---------**s*AFfTY--RF.LA fED wr'llfr ORr5ER--i.6_f, ____ --0005 1 a 1*rJRnER a NUMBER DEPT EQUIPMENT IDENTTFICATJON EXPLANATION OF WORK PERFORMED 10 "

..

  • -------*----****-----*

________ __,12 '° :3 " q17162 P VALVE, CONTROL RM DAMPER 1CAA1 13 DESCRIPTlON

  • OF PROBLEM, DOF.S NOT OPEN ; ... , 17 14 'r *.*, / _;;, , j_*
  • _____

_

S\i.*69.3'

  • >*',_:'..'

_______________

__,20 '6 21 VALVE, 1cnMPONENT :-17 qi12qq

'*. p EC J

AC 22 23 q18414 p #12 FAN cn1L UNIT 24 30 3' -,----------'------------------132

... _"'W . ' . ,. -33 26 34 ' . ' 35 -------

_________


29 q1R421 p INSTRU, SOURCE RANGE N-31 : ( 30 32 . 33 40 . 1 s H 0 w"I "N'"G--.A---c'"'Q'"U'"N"'T""'


,--------1., MIN. WITH NO HIGH APPLIED 34 ---cnR"lrITrrvriicTlTfN";---

M o-iilPR E-A MP c A ALE ----------l 43 4-1 45 35 46 ( .. " -361--q_l_R_4_3_l

____ P ____ C_O_N_T_R_O_L_R_M_V_E_N_T_t_C_A_A_3_1

__________________________ -

O: N B-:::;N::E:

8-6*---____ f "

.._ 42 q27474 P VALVE, 1 CONTROL VOLUMEt 72 _______ _,5a 43 " i 45 1 46,__ ______ _ i 47 57 DE s c R Ip TIO N OF p ROBLE M, v AL v E IN 0 I c ATE s FULL 0 p EN, _c_o_N __ s __ o_L_E ______ INDICATES FULL CLOSE ------------------------

-*-*--------


* --*--------*-**-*-*----*--*-**

--* *-. -* . -* ... *-**-. *--**---*-*-* ***** *-------CORRECTTVF ACTION, ADJUSTED LIMIT SWITCH G?,. : 53 *--

66 50 67 -. ____ . 51 68 52 *------------------------

--*--------------* ----------***-** -. -*--*-. -***-**

    • ---.. ______________


***-*


--*-*---------

--*--------*----------------***-**--*-----------------------69 70 :: Page 12 of 18 ;;

55 73 7< 56 75 -57

-*-** ---*----** . *-----*-------*-* ____ _. __ _ ... ----***-**---**-



*---------------------

  • .

6 WORK 1 QRl')ER 8 NUMBER DEPT EQUIPMENT IDENTJFICATJON EXPLANATION OF WORK PERFORMED 6( 10 .--11

.........

OESCPIPTJON OF PRORLtM, ALARM OSCILLATING 1K AND 13 "r 15 16 CRUSHED TUBE ---,------------------------<,;

18 1 : ., 19

__

__

p VALVE, 12 SERVICEWATER122 . DESCRIPTION OF* PROBLEM, CORRECTIVE ACTION, 21 22 23 UNABLE TO CLOSE VALVE' FULLYI FLOW *ON ---:: INIDICATOR WILL NOT DROP BELOW 6Sdo

!')OWN IMPULSE 2 9 LINES .

p NUCLEAR INSTRU, nns -< : ; ,-; :: cl EM_, ______ I

_ _BA!lj_§,E:

..

S BELOW ZERO-'------------'---'----'---

j, CORRECTIVE ACTION, CALIARATED I.R. JNDICATOR AS PER 1PD16.t. : 002. *

.. -------141 p p p INSTRU, 12 STEAM GENR. STEAM PRESS. c-" nESCRJPTION OF PROALEM, 45 CAUSE, BOURDON TUBE WAS BROKEN CORRECTIVF.

ACTION, REPLACED 1PT*S26 WITH 2PT*S26 INSTR IJ, 1 a STE AM GEN R :sT F.f,-;.r DITTI ETHE A DER ___________________


16 .,, 48 " 50 r,:t. 51 52 -----------------;

a:;('*' Wss"-' nESCRIPTtON OF PROAL_E ___ M_, ____ t_PT*544 FAtLED __ H __ I_G_H _________________________

---1s6 57 CAUSE, UNDER TNVESTTGATION SB 59 60 ---------*c; ji RRECfTvi:-Tc T !ON;----*--------RE P[A CED 62 '!::' G3 VALVE, tCONTROL VOLUMF277 s1 t---------------------------------------------------------------------------------165

>-----------------------*-*---*-*

---*---*-----

-***-----. 66 67 68 -* --*-*--**-

  • -** *-* ----.---*-**---. -.. -----------------------

fG.9 70 53 71 Page 13 of 18 n 56 s1. . ro

  • -*-*------------*---*-----*-------------------**----*--------------*--------


*------

-

--

1-1-----------------------------------------------------*------------------



*--*-------------!

1, 'H 6 WORK 1 ORl)ER a NUMBER DEPT SALEM GENERATTNG STATION .5riFETY-RFl.ATED E.PLiJPMENT

\'.iFJRK nRr'.iER LOG EQUIPMENT IDENTIFICATION F.XPLANATION OF WORK PERFORMED I

  • J in 11 1---------------**-----------------------***------*****---*----**------***---*----------*----*-*--*--***-**-****-*--*-******---*-***-*--****-*--*---------**----------------------------------!?
f)ESCRIPTION OF PROALF.M, SERVICF.WATER FLOW CONTROL ERRATIC 15 IMPULSE LINES

1::

18 .-19 *-*---------

1 23

_________

__

INSTRU, SOLID STATE PROTECTION TRAIN A 16 17 q35337 p 18 20 21 12 23 1-----1; CAUSE, FAULTY POWER SUPPLY, FAULTY SAFEGUARD n -------------**---------Ff1S-KR*5----------*-**-***-----------*--*-----------------.

2 , 30 ,,.;., 31 1*r--------.---,-,...,-----.,------------C_O_R_R_E_r._T_I_V_E_A_C_T

__

____ R_E*CC_P_L AC ED POWER A ND SAFE GU A RD BOA RD 32 : r 15 33 16 935371

  • 12 GEAR ROOM SUPPLY FAN :: c 27 1--------'-----

28 I 29 301-------------------------------C

__ A_U_S_E_, ____ D_A_M_PER LIMIT SWITCH N_O_T_M_A_K_I_N_G_U_P

__________________

_, ?1 CbRRECTTVE ACTION, ADJUSTED START LIGHT SWITCH 33 " q36068 p INSTRU, 12 STF:AM 35

  • l)ESCRIPTION OF PROBLEM, 37 38 39 CAUSE, i-----------------*-

PARTICIAL

'TRIP STEAM PRESSURE ---------------------------j cnMPARATOR 1PC-526C/D FAILED 38 39 0 I 11 ' ' 5 r. 7 8 9 oO 51 51 (j ! ,..-.__, : I 91 t 40 53 54 55 56 42 936075 p RADIT!ON MONITORING SYS., 1R1A 43 44 45 46 " 1---------

DESCRIPTION OF PROBLEM, FAT LED -------*--*---*-*


*----*---*--

CtlU§f,. rrEH'. t rrrn s *wER 4Br---------*----------------*--c._n

__

_______

__ s _____________________________

--i 49 so 936164 p NUCLEAR INSTRU, 1N31 SOIJRr.E RANGE 51 !--------------------------------

---*-* ,,.. ***----***--*-*

.. *--** --**-*** --

---*-*----.


. ------*--*-***


**-. ------------*-------*---



**------*------<

52 53 54 P;::i rri=> 1 t:; nr 1 R


*---------<

55 J 57 58 59 60 61 ? 3 4 ,5 56 o7 8 g 0 I 1 3 74 1; 56 57 -------------------------

.... ------------------.'.13


*--'-----........ -...

% 6 s WORK ORO ER a NUMBER
  • DEPT EQUIPMENT IOENTTFICATJON F.XPLANATION OF WORK PERFORMED

% 8 6{' io r 11 10 13 11 11ESCRIPTJON OF PROBLfM, HIGH FLUX AT SHUTDOWN TRIPS :; ,-12 16 13f-.,.--------_,-.

HI FLUX SHUTDOWN BISTABLE' 18 14 15 q 361 7 q VALVE, 14SW223 ..

19

-_< -------------------;2C 21 16 22 .-17 DESCRIPTION OF PROBLEM,

  • 14 FCU ALARM DOES NOT ANNUNCIATE WHEN FCU 23

__ K_E_N_O_l_J_T_O_F

__

20

  • CrJRREttfi/{

ACTION, ADJUSTED L YMIT W :: ':': 21 __ _,:;__ ._. .*

_,. " -,. ... --28 I .J

__

NOT EVEN WHEN AIR FAILED . *-2s* * *: . : :: C 21""',

_____________

_________

__ SV6_?ll. C_QU*:.._,___J__

28 29 w TOTAL LINES : 00017A , 31 TOT AL A-RECS -000047 '32 38 ,.. 39 \...,. 40

  • 2 .13 u LAST UPDATE u

.... ___________ . c: 31r-,.t..,,ND"u......-,.-*1-<"nu1;-.;N,---,---,-....,..,.-,,--7""'7"-----------------:-------------------------------,--,.,.-------,------------1 4 9

  • so ( *i 38 51 _,

*-*-*--*----

---.. " ..... . .,.,_,_,, ___________________________

',o @BPKPT PPil\IT$ ,A 53 '41 ,_

43 45 46 47 48 1 49 5R: . 59 '--: 60

--*--*-**---------------------------------


**


**-----*-----------'-'--------------------jG1 1------------------------

62 t' 63 i_, 64 -----------------------------165 50 c s1,__ _____________________________


**-----


__________________


*.


*-*--------------**-------


***----------------------------------------------168 52 69 70 r** 53 71 '-54 Paqe 16 of 18 n 56' 57 76 C...'-----------------------------------*---*

--** . ------****

-**--**--*--

---*---*-*-

  • --...... '-*-** ----**-**

--* **--*-***--*---***

  • ----*--*------* ----*-------------------**-----------

7/1 SALEM UNIT 111 OPERATING

SUMMARY

JULY 1980 thru Load stabilized at 100%. 7 /10 7/11 Commenced load reduction to clean condensate strainers.

7/13 Completed cleaning and maintenance of condensate strainers, load stabilized at 100%. 7 /13 thru Load stabilized at 100% power. 7/27 7/27 At 0700, commenced end of cycle, power coastdown.

Power was reduced to 96% initially.

7/27 Coastdown is continuing.

On 7/31/80, power was approximately thru at 92%. 7/31 Page 17 of 18

  • '

INFORMATION July 1980 DOCKET NO.: 50-272 UN IT: Salem 111 DATE: August 11, 1980 COMPLETED BY: L. K. Miller TELEPHONE:

609-365-7000 Ext. 507 l. Refueling information has changed from last month: x YES NO ---2. Scheduled date of next refueling:

September 20, 1980 3. Scheduled date for restart fallowing refueling:

December 7, 1980 4. A. Will Technical Specification changes or other license amendments be required?

NOT DETERMINED TO-DATE July 1980 B. Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X __ .......,;

If no, when is it scheduled?

September 1980

5. Scheduled date(s) for submitting proposed licensing action: September 1980 (If Required)
6. Important licensing considerations associated with refueling:

NONE 7. Number of Fuel Assemblies:

A. In-Core 193 B. In Spent Fuel Storage 40 8. Present licensed spent fuel storage capacity:

264 Future spent fuel storage capacity:

1,170 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

September 1982 Page 18 of 18 8-l-7.R4