ENS 45717
ENS Event | |
---|---|
16:00 Feb 23, 2010 | |
Title | Unanalyzed Condition - Incomplete List of Safety Controls in Integrated Safety Analysis Summary |
Event Description | During a [Global Nuclear Fuel, Americas] GNF-A ongoing review of the Fuel Manufacturing Operation (FMO) Integrated Safety Analysis (ISA), it was discovered at 3pm yesterday (2/22/2010) that the list of safety controls associated with the handling of hydrofluoric material may be incomplete in the ISA Summary.
After further review, it was determined this morning that the list of Items Relied on for Safety (IROFS) was incomplete, and as a result, the UF6 conversion area has been shut down pending revision of the ISA to document IROFS for these processes. UF6 conversion will remain shutdown until IROFS have been identified and implemented. While this discovery did not result in an unsafe condition, it is being reported on 2/23/2010 pursuant to the reporting requirements of 10CFR70 Appendix A (b)(1) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The licensee notified NRC Region 2 (Rich) and will notify the state and local authorities.
During the GNF-A ongoing review of the Fuel Manufacturing Operation (FMO) Integrated Safety Analysis (ISA), it was determined at 10:30am yesterday (3/10/2010) that the list of IROFS associated with the storage of uranium hexafluoride cylinders may be incomplete in the ISA Summary. As a result, conservative compensatory management measures for UF6 cylinder storage have been implemented pending revision of the ISA to document IROFS for these areas. While this discovery did not result in an unsafe condition, it is being reported as an addendum to event report 45717 pursuant to the requirements of 10CFR70 Appendix A(b)(1) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Notified R2DO (Nease) and NMSS EO (Benner). |
Where | |
---|---|
Global Nuclear Fuel - Americas Wilmington, North Carolina (NRC Region 2) | |
License number: | SNM-1097 |
Reporting | |
Part 70 App A (B)(1) | |
Time - Person (Reporting Time:+-1.92 h-0.08 days <br />-0.0114 weeks <br />-0.00263 months <br />) | |
Opened: | Scott Murray 14:05 Feb 23, 2010 |
NRC Officer: | Dong Park |
Last Updated: | Mar 11, 2010 |
45717 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45717\u003C/a\u003E - \u003Ca href=\"/Global_Nuclear_Fuel\" title=\"Global Nuclear Fuel\"\u003EGlobal Nuclear Fuel\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnanalyzed Condition - Incomplete List of Safety Controls in Integrated Safety Analysis Summary\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45717 - Global Nuclear Fuel\n","link":"","lat":34.320930555555556,"lon":-77.92285,"icon":""}],"imageoverlays":null} | |
Global Nuclear Fuel with Part 70 App A (B)(1) | |
WEEKMONTHYEARENS 528112017-06-16T21:00:00016 June 2017 21:00:00
[Table view]Part 70 App A (B)(1) Unanalyzed Condition Identified ENS 507502015-01-21T20:00:00021 January 2015 20:00:00 Part 70 App A (B)(1) Dry Conversion Process Improperly Analyzed in the Current Integrated Safety Analysis ENS 502762014-07-12T21:30:00012 July 2014 21:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Operations Not Meeting Requirements ENS 487092013-01-30T20:30:00030 January 2013 20:30:00 Part 70 App A (B)(1) Completion of Integrated Safety Analysis Action Plan Balance of Plant Milestone ENS 486952013-01-22T20:30:00022 January 2013 20:30:00 Part 70 App A (B)(1) Unanalyzed Condition - Based on Ongoing Integrated Analysis Review ENS 485542012-12-03T18:30:0003 December 2012 18:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Furnace Improperly Analyzed ENS 484972012-11-09T16:00:0009 November 2012 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - System As-Found Condition Not Fully Described in Isa ENS 477052012-02-27T19:30:00027 February 2012 19:30:00 Part 70 App A (B)(1) Unanalyzed Piping Configuration Discovered ENS 473252011-10-05T18:00:0005 October 2011 18:00:00 Part 70 App A (B)(1) Item Relied on for Safety Not as Described in the Integrated Safety Analysis ENS 467102011-03-29T14:00:00029 March 2011 14:00:00 Part 70 App A (B)(1) Completion of Isa Action Plan Conversion Milestone ENS 463052010-10-02T17:30:0002 October 2010 17:30:00 Part 70 App A (B)(1) Unanalyzed Condition When Fuel Pellet Boats Became Stacked ENS 462432010-09-09T18:30:0009 September 2010 18:30:00 Part 70 App A (B)(1) Accident Evaluation Improperly Analyzed in the Integrated Safety Analysis ENS 457172010-02-23T16:00:00023 February 2010 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - Incomplete List of Safety Controls in Integrated Safety Analysis Summary ENS 454912009-11-11T20:00:00011 November 2009 20:00:00 Part 70 App A (B)(1) Incomplete Documentation of Criticality Safety Controls in Integrated Safety Analysis Summary 2017-06-16T21:00:00 | |